The impact of decision criteria on deadline-based incentive contracts in project management

Abstract

This paper investigates the impact of decision criteria on incentives in a project management setting, where a project manager operates a project consisting of two tasks performed sequentially by two different subcontractors. The completion time is characterized as an uncertain variable, which depends on the subcontractor’s unobservable effort of each task. Within the framework of uncertainty theory, four classes of uncertain principal agent models are presented under the expected value criterion and the critical value criterion. According to the structural characteristics, each model can be decomposed into two equivalent sub-models, which can be solved to obtain the optimal deadline-based incentive contracts via a two-step optimization method. Further, the interconnections among these contracts are discussed. It’s demonstrated that the optimal deadline-based incentive contract depends on the confidence level of the party (either the project manager or the subcontractor) who adopts the critical value criterion. Meanwhile, the more conservative the subcontractor is, the higher the incentive coefficients will be. And the more conservative the project manager is, the lower the incentive coefficients will be. Finally, given some special confidence levels, it’s interesting to find that the four models can be equivalent.

This is a preview of subscription content, access via your institution.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

References

  1. Ayaǧ, Z. (2014). An integrated approach to concept evaluation in a new product development. Journal of Intelligent Manufacturing. doi:10.1007/s10845-014-0930-7.

  2. Bayiz, M., & Corbett, C.J. (2005). Coordination and incentive contracts in project management under asymmetric information. Working paper, UCLA Anderson School.

  3. Elmaghraby, S. E. (1990). Project bidding under deterministic and probabilistic activity durations. European Journal of Operational Research, 49(1), 14–34.

    Article  Google Scholar 

  4. Fulkerson, D. R. (1961). A network flow computation for project cost curves. Management Science, 7(2), 167–179.

    Article  Google Scholar 

  5. Gutierrez, G., & Paul, A. (2000). Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Operations Research, 48(6), 927–938.

    Article  Google Scholar 

  6. Ke, H., Ma, J., & Tian, G. (2014). Hybrid multilevel programming with uncertain random parameters. Journal of Intelligent Manufacturing. doi:10.1007/s10845-014-0985-5.

  7. Kelley, J. E. (1961). Critical path planning and scheduling: Mathematical basis. Operations Research, 9(3), 296–320.

    Article  Google Scholar 

  8. Kwon, H. D., Lippman, H. D., & Tang, C. S. (2010). Optimal time-based and cost-based coordinated project contracts with unobservable work rates. International Journal of Production Economics, 126(2), 247–254.

    Article  Google Scholar 

  9. Kwon, H. D., Lippman, S. A., & Tang, C. S. (2011). Sourcing decisions of project tasks with exponential completion times: Impact on operating profits. International Journal of Production Economics, 134(1), 138–150.

  10. Lan, Y., Zhao, R., & Tang, W. (2011). A bilevel fuzzy principal-agent model for optimal nonlinear taxation problems. Fuzzy Optimization and Decision Making, 10(3), 211–232.

  11. Li, X., & Wong, H. (2010). Credibilistic satisfiability and credibilistic entailment. Journal of Multi-Valued Logic and Soft Computing, 16(1–2), 105–134.

  12. Li, X., & Liu, B. (2009a). Foundation of credibilistic logic. Fuzzy Optimization and Decision Making, 8(3), 91–102.

    Article  Google Scholar 

  13. Li, X., & Liu, B. (2009b). Hybrid logic and uncertain logic. Journal of Uncertain Systems, 3(2), 83–94.

    Google Scholar 

  14. Liu, B. (2009). Some research problems in uncertainty theory. Journal of Uncertain Systems, 3(1), 3–10.

  15. Liu, B. (2010). Uncertainty theory: A branch of mathematics for modeling human uncertainty. Berlin: Springer.

  16. Liu, B. (2007). Uncertainty theory (2nd ed.). Berlin: Springer.

    Google Scholar 

  17. Liu, B. (2011). Uncertain logic for modeling human language. Journal of Uncertain Systems, 5(1), 3–20.

    Google Scholar 

  18. Liu, B. (2013a). Polyrectangular theorem and independence of uncertain vectors. Journal of Uncertainty Analysis and Applications, 1, 9.

    Article  Google Scholar 

  19. Liu, Y. (2013b). Uncertain random variables: A mixture of uncertainty and randomness. Soft Computing, 17(4), 625–634.

    Article  Google Scholar 

  20. Liu, B. (2015). Uncertainty theory (4th ed.). Berlin: Springer.

    Google Scholar 

  21. Mu, R., Lan, Y., & Tang, W. (2013). An uncertain contract model for rural migrant worker’s employment problems. Fuzzy Optimization and Decision Making, 12(1), 29–39.

    Article  Google Scholar 

  22. Paul, A., & Gutierrez, G. (2005). Simple probability models for project contracting. European Journal of Operational Research, 165(2), 329–338.

    Article  Google Scholar 

  23. Wang, G., Tang, W., & Zhao, R. (2013). An uncertain price discrimination model in labor market. Soft Computing, 17(4), 579–585.

    Article  Google Scholar 

  24. Wu, X., Zhao, R., & Tang, W. (2013). Uncertain agency models with multi-dimensional incomplete information based on confidence level. Fuzzy Optimization and Decision Making, 13(2), 231–258.

    Article  Google Scholar 

  25. Yang, K., & Liu, Y. (2014). Developing equilibrium optimization methods for hub location problems. Soft Computing. doi:10.1007/s00500-014-1427-1.

  26. Yang, X., & Gao, J. (2013). Uncertain differential games with application to capitalism. Journal of Uncertainty Analysis and Applications, 1, 17.

    Article  Google Scholar 

  27. Yang, K., Liu, Y., & Yang, G. (2014). Optimizing fuzzy \(p\)-hub center problem with generalized value-at-risk criterion. Applied Mathematical Modelling, 38(15–16), 3987–4005.

    Article  Google Scholar 

  28. Yang, K., Zhao, R., & Lan, Y. (2014). The impact of risk attitude in new product development under dual information asymmetry. Computers & Industrial Engineering, 76(10), 122–137.

    Article  Google Scholar 

  29. Yang, X., & Gao, J. (2014). Uncertain core for coalitional game with uncertain payoffs. Journal of Uncertain Systems, 8(2), 13–21.

    Google Scholar 

  30. Yang, L., Liu, P., Li, S., Gao, Y., & Ralescu, D. (2015). Reduction methods of type-2 uncertain variables and their applications to solid transportation problem. Information Sciences, 291, 204–237.

    Article  Google Scholar 

  31. Zhu, Y. (2010). Uncertain optimal control with application to a portfolio selection model. Cybernetics and Systems, 41(7), 535–547.

    Article  Google Scholar 

Download references

Acknowledgments

This work was supported by the National Natural Science Foundation of China under Grant No. 71271151, No. 71301114 and No. 71471126, and the Research Fund for the Specialized Research Fund for the Doctoral Program of Higher Education under Grant No. 20130032110015.

Author information

Affiliations

Authors

Corresponding author

Correspondence to Kai Yang.

Rights and permissions

Reprints and Permissions

About this article

Verify currency and authenticity via CrossMark

Cite this article

Wang, J., Yang, K. & Zhao, R. The impact of decision criteria on deadline-based incentive contracts in project management. J Intell Manuf 28, 643–655 (2017). https://doi.org/10.1007/s10845-014-0994-4

Download citation

Keywords

  • Uncertainty theory
  • Project management
  • Incentive contract
  • Asymmetric information
  • Decision criterion