Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups

  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

Abstract

This paper discusses the multi-product multi-level capacitated lotsizing and scheduling problem with sequence-dependent setups. An exact formulation of the problem is provided as a mixed-integer program which is impractical to solve in reasonable computing time for non-small instances. To solve non-small instances of the problem, MIP-based heuristics are provided. To test the accuracy of heuristics, two lower bounds are developed and compared against the optimal solution. The trade-offs between schedule quality and computational time of heuristics are also provided.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Almada-Lobo B., Klabjan D., Carravilla M.A., Oliveira J. (2007) Single machine multi-product capacitated lot sizing with sequence-dependent setups. International Journal of Production Research 45(20): 4873–4894. doi:10.1080/00207540601094465

    Article  Google Scholar 

  • Araujo S.A., Arenales M.N., Clark A.R. (2007) Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. Journal of Heuristics 13(4): 337–358. doi:10.1007/s10732-007-9011-9

    Article  Google Scholar 

  • Araujo S.A., Arenales M.N., Clark A.R. (2008) Lot sizing and furnace scheduling in small foundries. Computers & Operations Research 35(3): 916–932. doi:10.1016/j.cor.2006.05.010

    Article  Google Scholar 

  • Beraldi P., Ghiani G., Grieco A., Guerriero E. (2008) Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs. Computers & Operations Research, 35(11): 3644–3656. doi:10.1016/j.cor.2007.04.003

    Article  Google Scholar 

  • Clark A.R. (2003) Optimization approximations for capacity constrained material requirements planning. International Journal of Production Economics 84(2): 115–131. doi:10.1016/S0925-5273(02)00400-0

    Article  Google Scholar 

  • Clark A.R., Clark S.J. (2000) Rolling-horizon lot-sizing when setup times are sequence-dependent. International Journal of Production Research 38(10): 2287–2308. doi:10.1080/00207540050028106

    Article  Google Scholar 

  • Dillenberger C., Escudero L.F., Wollensak A., Zhang W. (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. European Journal of Operational Research 75(2): 275–286. doi:10.1016/0377-2217(94)90074-4

    Article  Google Scholar 

  • Dillenberger, C., Wollensak, A., & Zhang, W. (1992). On practical resource allocation for production planning and scheduling with different setup products, Draft paper. Germany: German Manufacturing Technology Centre, IBM, Sindelfigen.

  • Defersha F.M., Chen M. (2008) A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality. European Journal of Operational Research 187(1): 46–69. doi:10.1016/j.ejor.2007.02.040

    Article  Google Scholar 

  • Drexl A., Kimms A. (1997) Lot sizing and scheduling, survey and extensions. European Journal of Operational Research 99(2): 221–235. doi:10.1016/S0377-2217(97)00030-1

    Article  Google Scholar 

  • Eppen G.D., Martin R.K. (1987) Solving multi-item capacitated lot-sizing problems using variable redefinition. Operations Research 35(6): 832–848

    Article  Google Scholar 

  • Fandel G., Stammen-Hegene C. (2006) Simultaneous lot sizing and scheduling for multi-product multi-level production. International Journal of Production Economics 104(2): 308–316. doi:10.1016/j.ijpe.2005.04.011

    Article  Google Scholar 

  • Fleischmann B., Meyr H. (1997) The general lotsizing and scheduling problem. OR-Spektrum 19(2): 11–21

    Article  Google Scholar 

  • Gupta D., Magnusson T. (2005) The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research 32(4): 727–747. doi:10.1016/j.cor.2003.08.014

    Article  Google Scholar 

  • Jans R., Degraeve Z. (2007) Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches. European Journal of Operational Research 177(3): 1851–1875. doi:10.1016/j.ejor.2005.12.008

    Article  Google Scholar 

  • Karimi B., Fatemi Ghomi S.M.T., Wilson J.M. (2003) The capacitated lot sizing problem: A review of models and algorithms. Omega 31(5): 365–378. doi:10.1016/S0305-0483(03)00059-8

    Article  Google Scholar 

  • Kimms, A. (1993). Multi-level, single-machine lot sizing and scheduling(with initial inventory). Manuskripte aus den Instituten fûr Betriebswirtschaftslehre der universität Kiel, No.329, Kiel.

  • Kimms A. (1996) Multi-level, single-machine lotsizing and scheduling (with initial inventory). European Journal of Operational Research 89(1): 86–99. doi:10.1016/S0377-2217(96)90056-9

    Article  Google Scholar 

  • Kimms, A., & Drexl, A. (1996). Some insights into proportional lotsizing and scheduling. Manuskripte aus den Instituten der universität Kiel, No.406, Kiel.

  • Merece C., Fonton G. (2003) MIP-based heuristics for capacitated lotsizing problems. International Journal of Production Economics 85(1): 97–111. doi:10.1016/S0925-5273(03)00090-2

    Article  Google Scholar 

  • Tempelmeier H., Buschkuhl L. (2008) Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. International Journal of Production Economics 113(1): 401–402. doi:10.1016/j/ijpe.2007.10.001

    Article  Google Scholar 

  • Wagner H.M., Whithin T.M. (1958) Dynamic version of the economic lot size model. Management Science 5: 89–96

    Article  Google Scholar 

  • Wolsey L.A. (1998) Integer Programming. Wiley, New York

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to S. M. T. Fatemi Ghomi.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mohammadi, M., Fatemi Ghomi, S.M.T., Karimi, B. et al. Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups. J Intell Manuf 21, 501–510 (2010). https://doi.org/10.1007/s10845-008-0207-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10845-008-0207-0

Keywords

Navigation