Correction to : International Tax and Public Finance https://doi.org/10.1007/s10797-022-09742-0

The original version of this article has an error in the Eq. (9).The corrected text and Eq. (9) is given below.

The time series of the IE in “actual” metric (\({}^{est}\widehat{IE}_{t}^{m\_1}\)) is calculated by combining the results in steps 2 and 3.1 as follows:

\({}_{ }^{est} \widehat{IE}_{t}^{m\_1} = \overbrace {{{}_{ }^{ols\_est} \hat{\gamma }_{0}^{*} }}^{{step{ }2}} + \left\{ {\begin{array}{*{20}l} {\sum\nolimits_{i = 1}^{5} {\underbrace {{{}_{ }^{est} \hat{\gamma }_{i}^{*} }}_{{step{ }3.1}}} x_{i,t}^{ } } \hfill & {if \;est = cb} \hfill \\ {\begin{array}{*{20}c} \\ {\sum\nolimits_{i = 1}^{5} {\underbrace {{{}_{ }^{est} \hat{\gamma }_{i}^{*} }}_{{step{ }3.1}}\left( {\sigma_{{y_{1} }} /\sigma_{{x_{i} }} } \right)x_{i,t}^{ } } } \\ \end{array} } \hfill & {if \; est = pls} \hfill \\ \end{array} } \right.\), with \(i = 1, \ldots ,5;\;t = 1, \ldots ,T\) (9).