Increasing Turbine Efficiency at PJSC Mosénergo Combined Cycle Gas Turbine Plants

  • POWER PLANTS
  • Published:
Power Technology and Engineering Aims and scope

The relevance of modernizing powerful gas turbine units is due to the economic feasibility of increasing the installed electric capacity of combined cycle gas turbine (CCGT) plants with modernized gas turbines and thereby increasing the competitiveness of such CCGT plants in the wholesale electricity market. By increasing the installed capacity of CCGTs using such turbines, it is possible to expand their control range of loads in absolute terms, as well as improving the maneuverability characteristics of the equipment. The article discusses some features of the implementation of gas turbine (GT) modernization projects carried out in PJSC Mosénergo aimed at increasing their capacity under current operating conditions. In addition, the results of regime tests of adiabatic evaporation units carried out during the summer at PGU-420 and PGU-230 are presented. By expanding the load adjustment range, it was possible to implement “flexible” service intervals for SGT5 4000F type GT. The inlet guide valve (IGV) re-opening algorithm allowed the available power of the GT and the unit to be increased by 2.5 – 3.5 MWabove the nominal, as well as improving the turbine power in the modes of normalized primary frequency control when the input guide unit of the GT is not fully open. Changes in the key indicators of the CCGT following the implementation of these measures (GT, ST, and unit capacities, efficiency) are considered.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Yu. A. Radin, A. I. Chertkov, and K. V. Filatov, “An impact of modernization of F-series GTs with an increase in their capacity on single-shaft CCGT characteristics,” Élektr. Stantsii, No. 1, 2 – 6, (2022). https://doi.org/10.34831/EP.2022.1086.1.001

  2. S. N. Lenev, Yu. A. Radin, P. V. Golov, V. I. Konovalov, and A. I. Istomov, “Modernization of the CCGT-420 unit of Mosénergo CHPP-20 and its efficiency increase,” Élektr. Stantsii, No. 5, 20 – 24. (2020). https://doi.org/10.34831/EP.2020.1066.5.003

  3. S. N. Lenev, Yu. A. Radin, I. S. Belyankin, E. S. Kutyrev, and V. I. Konovalov, “Increasing the efficiency of CCGTs by evaporative cooling of the air sucked in by the gas turbine compressor,” Élektr. Stantsii, No. 4, 11 – 14 (2021). https://doi.org/10.34831/EP.2021.1077.4.003

  4. N. Shakhin, Kh. Akul, and A. S. Friterm, “Combustion turbine inlet air cooling units used in power plants,” Turb. Dizeli, Mar.-Apr., 8 – 11 (2011).

  5. Gas Turbine Inlet Air Cooling and Wet Compression: Boost Power with the Cost-Effective MeeFog System, Mee Industries Inc. (2015).

  6. STO 59012820.27.100.004–2016. Norms of Participation of Gas-Vapor Installations in Normalized Primary Control of Frequency and Automatic Secondary Control of Frequency and Active-Power Flows [in Russian], appr. on September 13, 2016. AO SO EES, Moscow (2016).

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Yu. A. Radin.

Additional information

Translated from Élektricheskie Stantsii, No. 9, September 2022, pp. 5 – 10. DOI: https://doi.org/10.34831/EP.2022.1094.9.001

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Lenev, S.N., Radin, Y.A. & Belyankin, I.S. Increasing Turbine Efficiency at PJSC Mosénergo Combined Cycle Gas Turbine Plants. Power Technol Eng 56, 872–877 (2023). https://doi.org/10.1007/s10749-023-01603-y

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-023-01603-y

Keywords

Navigation