Skip to main content
Log in

Assessment of the State of the Nizhne-Bureyskaya HPP Soil Dam

  • Published:
Power Technology and Engineering Aims and scope

The article presents a comparative analysis of the calculated justification of a soil dam with the results of field observations of the Nizhne-Bureyskaya HPP during the initial operation.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. R. N. Orischuk, “Design, construction and operation problems of clay-cement-concrete diaphragms of soil dams mounted by means of bored-secant piles,” Izv. VNIIG im. B. E. Vedeneeva, 287, 3 – 13 (2018).

    Google Scholar 

  2. V. V. Borzunov, A. Sh. Musaev, and E. A. Kadushkina, “Optimization of design solutions and improvement of the main structures of the Nizhne-Bureyskaya HPP,” Gidrotekh. Stroit., No. 4, 2 – 15 (2017).

    Google Scholar 

  3. V. V. Borzunov, G. V. Denisov, et al., “Experience in the design and construction of the soil dam of the Nizhne-Bureyskaya HPP using a diaphragm made of bored-secant piles as an impervious device,” Gidrotekh. Stroit., No. 6, 2 – 11 (2019).

    Google Scholar 

  4. E. S. Argal and V. M. Korolev, “On some properties of clay-cement concrete and features of the wall in the ground operation in the dam body,” Gidrotekh. Stroit., No. 5, 10 – 19 (2019).

    Google Scholar 

  5. S. V. Sol’skii, M. G. Lopatina, et al., “Results of laboratory studies of the filtration characteristics of clay-cement concrete,” Gidrotekh. Stroit., No. 8, 36 – 42 (2016).

  6. SP 39.13330.2012. Rock Fill Dams. Updated Edition of SNiP 2.06.05–84* [in Russian], Minregion Rossii, Moscow (2012).

  7. V. S. Prokopovich, A. S. Velichko, and R. N. Orishhuk, “Stressstrain state of a soil dam with clay-cement-concrete core wall using the example of a soil dam of Gotsatlinskaya HPP,” Izv. VNIIG im. B. E. Vedeneeva, 282, 87 – 98 (2016).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to R. N. Orischuk.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’svo, No. 10, October 2021, pp. 26 – 38. DOI: https://doi.org/10.34831/EP.2021.95.90.005

Rights and permissions

Springer Nature or its licensor holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Orischuk, R.N., Laboyko, R.Y. Assessment of the State of the Nizhne-Bureyskaya HPP Soil Dam. Power Technol Eng 55, 859–869 (2022). https://doi.org/10.1007/s10749-022-01444-1

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-022-01444-1

Keywords

Navigation