The monolithic concrete abutments as supports for the repair gate made by underwater concreting at a depth of up to 21 m in a permanent formwork fixed to the concrete spillway structures are described.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to R. Ya. Vyatkin.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’svo, No. 10, pp. 2 – 5, October 2019.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Vyatkin, R.Y., Mikhailova, L.B. Supports for Repair Gates at the Lower Bureya Hydroelectric Power Plant. Power Technol Eng 53, 667–670 (2020). https://doi.org/10.1007/s10749-020-01136-8

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-020-01136-8

Keywords

Navigation