Some results of generalizing and analyzing long-term on-site observations of the construction and operation of high-head concrete dams with consideration of geodynamic effect and imperfection of the designs of dams in tectonically unstable regions are briefly presented.
Similar content being viewed by others
References
A. N. Marchuk, A. A. Khrapkov, and Ya. N. Tsukerman, “Characteristics of the static work of concrete pressure structures of HPP with a reservoir component,” Gidrotekh. Stroit., No. 12, 12 – 16 (1985).
N. F. Novikov and A. V. Rumyantseva, “The Chirkei dam on the Sulak River,” in: Geology and Dams. Vol. IX [in Russian], Énergoatomizdat, Moscow (1984).
A. N. Marchuk and N. A. Marchuk, “Prediction of the October 11, 2008 earthquake in the North Caucasus by means of the measuring system of the Chirkei and Miatla HPPs,” Gidrotekh. Stroit., No. 3, 47 – 50 (2009).
A. N. Marchuk, “Characteristics of the state of the concrete channel dam of the Bratsk HPP,” Gidrotekh. Stroit., No. 5, 37 – 41 (1996).
A. N. Marchuk, L. N. Dudchenko, and Yu. N. Solov’ev, “State of the Zeya HPP dam with consideration of the geo dynamic effect,” Gidrotekh. Stroit., No. 5 (1995).
F. G. Korchagin, ” Investigaction of short-period horizontal block movements in the region of the Zeya reservoir,” Progn. Zemletryas., No. 11! 989).
N. G. Voronina and F. G. Ufimtsev, Contemporary Vertical Movements of the Earth’s Crust. Middle Siberia. Processes of the Formation of the Topography of Siberia [in Russian], Nauka, Novosibirsk (1987), pp. 113 – 116.
A. N. Marchuk and N. AMarchuk, “Use of seismograms in analyzing the state of the ‘dam – foundation’ system,” Gidrotekh. Stroit., No. 10, 23 – 27 (2014).
A. I. Savich, V. I. Bonshtein, and M. E. Groshev, “Complex provision of seismic safety of hydropower objects,” Gidrotekh. Stroit., No. 11 (2005).
A. N. Marchuk and N. A. Marchuk, “Two approaches to earthquake predictions according to hydrogeodynamic precurors,” Gidrotekh. Stroit., No. 12, 9 – 15 (2016).
V. B. Zateev, “Determination of real stresses in concrete dams by the local unloading method,” Gidrotekh. Stroit., No. 5, 7 – 16, 2003.
A. N. Marchuk, “Method of measuring stresses in high-head dams in seismic regions,” Gidrotekh. Stroit., 9 – 11 (2006).
E. Yu. Zateeva, “Experience in creating a databank for monitoring the state of large HPPs,” Gidrotekh. Stroit., No. 7, 42 – 45 (2005).
Author information
Authors and Affiliations
Corresponding author
Additional information
The article is devoted to the 90th anniversary of the Schmidt Institute of Physics of the Earth, Russian Academy of Sciences
Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 3, March 2018, pp. 2 – 12.
Rights and permissions
About this article
Cite this article
Marchuk, A.N. Some Lessons Learned from On-Site Observations on High Concrete Dams. Power Technol Eng 52, 275–284 (2018). https://doi.org/10.1007/s10749-018-0945-x
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10749-018-0945-x