Skip to main content

Advertisement

Log in

The Effect of Restricting the Rate of Change of Water Level in a Reservoir on the Power Readings of a Hydreoelectric Power Plant

  • Published:
Power Technology and Engineering Aims and scope

The effect of restricting the rate of change of water level in a reservoir on the main energy and financial indicators of a hydroelectric power plant (HEPP) is examined, using the example of PJSC Krasnoyarsk HEPP. These restrictions were introduced depending on the temperature state of the hydraulic structure for the previous period. The calculations that are presented reflect the relative parameters of decreasing the main readings of the HEPP. A quantitative assessment of the decreasing revenue of the company is performed.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. V. I. Obrezkov (ed.), Hydroenergy: Textbook for higher education institutions. 2 nd Edition [in Russian], Énergoatomizdat, Moscow (1988).

  2. A. I. Savich, V. I. Bronshtein, and M. E. Groshev, “Static and dynamic behavior of the Sayano-Shushenskaya arch-gravity dam,” Gidrotekh. Stroit., No. 3, 3 – 13 (2013).

  3. N. A. Vul’fovich, “An evaluation of the bearing capacity of the Sayano-Shushenskaya HEPP dam according to field studies during the post-emergency period of operation (2009 – 2012),” Gidrotekh. Stroit., No. 4 (2013).

  4. N. A. Vul’fovich, L. A. Lorin, and N. I. Stefanenko, The Arch-Gravity Dam of the Sayano-Shushenskaya HEPP (an assessment of technical states according to field studies) [in Russian], Izd. VNIIG im. B. E. Vedeneeva, St. Petersburg (2012).

  5. Annual report of PJSC Krasnoyarsk HEPP for 2014 [in Russian].

  6. V. I. Bryzgalov, From the Experience of Creating and Developing the Krasnoyarsk and Sayano-Shushenskaya HEPPs [in Russian], Sibir. Izdat. Dom Surikov, Krasnoyarsk (1999).

  7. V. I. Bryzgalov et al., “Monitoring the change of the stress-deformed state of the Sayano-Shushenskaya HEPP dam in the zone for injection of filtration cracks,” Gidrotekh. Stroit., No. 9 (1998).

  8. Prices for power capacity used to determine the demand for capacity in carrying out competitive capacity outtake for 2020: Order No. 1628-r of the Government of the Russian Federation, dated 8/1/2016 [in Russian].

  9. N. A. Vul’fovich, L. A. Gordon, and N. I. Stefanenko, The Sayano-Shushenskaya HEPP arch-gravity dam (assessment of technical status according to field studies) [in Russian], JSC VNIIG im. B. E. Vedeneeva, St. Petersburg (2012).

  10. A. I. Savich and É. G. Gaziev, “The effect of reservoirs on the behavior of rocky massifs of the bases of high dams,” Gidrotekh. Stroit., No. 11, (2005).

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. Yu. Aleksandrovskii.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 6, June 2017, pp. 40 – 45.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Aleksandrovskii, A.Y., Sychev, D.S. The Effect of Restricting the Rate of Change of Water Level in a Reservoir on the Power Readings of a Hydreoelectric Power Plant. Power Technol Eng 51, 425–430 (2017). https://doi.org/10.1007/s10749-017-0850-8

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-017-0850-8

Keywords

Navigation