Organization of technical-condition monitoring of water-development works at the Svetlinskaya HPP (Vilyui HPP-3)

  • Published:
Power Technology and Engineering Aims and scope

Experience with development and operation of the Svetlinskaya HPP (Vilyui HPP-3) under complex geologic-engineering conditions is unique in both domestic and world practice. Problems associated with development of monitoring-measuring systems for water-development works of the HPP and the shores of the near-dam section of the reservoir are examined. Experience gained with monitoring of the condition of the structures during their construction and in the initial period of service of the HPP is analyzed. It is demonstrated that the hardware/software package employed for the monitoring system, which includes a number of original organizational and technical solutions can also be recommended for application on other projects, primarily those subject to conditions of the Extreme North.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. A. G. Solov’eva, A. M. Tsvik, and N. N. Tereshkov, “Construction of the Vilyui HPP-3,” Gidrotekh. Stroit., No. 11 (2001).

  2. V. N. Frumkin and M. M. Sherman, “Construction of the Vilyui HPP-3 on a permanently frozen semi-rocky bed,” Gidrotekh. Stroit., No. 12 (2003).

  3. S. N. Starshinov, “Installation of basic concrete structures for the Vilyui HPP-3,” Gidrotekh. Stroit., No. 5 (1999).

  4. S. N. Starshinov, N. A. Shakhov, and V. I. Shalin, “Effect of initial underheating on condition of the earthen dams at the Vilyui HPP-3 during its construction,” Gidrotekh. Stroit., No. 2 (2005).

  5. A. P. Prosbergs and A. A. Karlson, “Geodetic studies at the Vilyui HPP-3,” Gidrotekh. Stroit., No. 10 (2001).

  6. V. V. Mikhailenko, S. N. Starshinov, G. G. Sakharov, and N. A. Shakhov, “Evaluation of the condition of the remote monitoring-measuring system at the Vilyui HPP-3,” Gidrotekh. Stroit., No. 12 (2004).

  7. S. N. Starshinov, G. G. Sakharov, A. Yu. Drushinin, A. O. Rzhenetskii, V. G. Kirsanov, and E. A. Makarenko, “Experience acquired with use of new hardware for monitoring the temperature conditions of the earthen dams at the Vilyui HPP-3,” Gidrotekh. Stroit., No. 6 (2010).

  8. Industry Standard OST 34.72.965–96. Measuring-Wire Transducers for Monitoring the Condition of Power-Generating Structures [in Russian].

  9. Geokon. Instructional Manual. Model 4500, Vibrating wire piezometer, Copyright © 1983.1996.2002.2004 by Geokon, Inc.

  10. G. G. Sakharov, A. Yu. Druzhinin, V. G. Kirsanov, N. I. Stefanenko, and N. D. Muzyka, “New instrument model for on-going monitoring of water-development works based on embeddedwire MME,” Gidrotekh. Stroit., No. 6 (2009).

  11. STO 17330282.27.140.004–2008. Monitoring-Measuring Systems and Equipment for Water-Development Works at HPP. Conditions for Development. Standards and Requirements [in Russian].

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 12, December 2012, pp. 2 – 10.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Mal’ko, A.V., Yanel’, V.V., Makarenko, E.A. et al. Organization of technical-condition monitoring of water-development works at the Svetlinskaya HPP (Vilyui HPP-3). Power Technol Eng 47, 22–29 (2013). https://doi.org/10.1007/s10749-013-0391-8

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-013-0391-8

Keywords

Navigation