  • Thermal Power Stations
  • Published:
Power Technology and Engineering Aims and scope

Initial results on the development and operation of the 330 MW pulverized-coal fired unit at the Kashira GRÉS are reported. The major performance indices are close to the design values. The remaining unsolved issues are singled out.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Standards Document OST 108.030.26–78. Pulverized-Coal and Dust-Gas Swirl Burners and Their Configurations with Furnaces. Methods for Modelling and Design [in Russian], Izd. TsKTI, Leningrad (1979).

  2. Thermal Calculations for Boilers (Standard Method) [in Russian], Izd. NPO TsKTI, St. Petersburg (1998).

  3. M. N. Maidanik, E. Kh. Verbovetskii, A. A. Dekterev, M. Yu. Chernetskii, A. A. Gavrilov, D. V. Boikov, and S. V. Berdin, “Mathematical simulation of the furnace and horizontal gas duct of a P-50R boiler with combined solid and gas fuel firing,” Teploénergetika, No. 6 (2011).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Élektricheskie Stantsii, No. 6, June 2012, pp. 13 – 22.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Torkhunov, S.F., Shvarts, A.L., Avrutsky, G.D. et al. Development and operation of unit 3 at the Kashira GRÉS. Power Technol Eng 46, 289–297 (2012). https://doi.org/10.1007/s10749-012-0347-4

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-012-0347-4

Keywords

Navigation