Alternate plans and characteristics of design solutions for water-development works under construction at the No. 2 Zagorskaya pumped-storage power plant (PSPP) are described.
Similar content being viewed by others
References
O. D. Rubin, S. E. Lisichkin, A. V. Nefedov, O. Z. Seraya, and Ya. M. Chuprina, “Design of rational reinforcement of the foundation slab for the water intake at the No. 2 Zagorskaya PSPP,” Gidrotekh. Stroit., No. 4 (2008).
S. Danila and A. Shikshinis, “Condition of water-development works and the surrounding environment at the Kruonisskaya pumped-storage power plant,” Gidrotekh. Stroit., No. 7 (2007).
Feasibility Study (Plan) for Construction of the No. 2 Zagorskaya PSPP on the Kun’ya River: 1833-KN 2 [in Russian], Izd. JSC “Institut Gidroproekt” — a subsidiary of JSC “Inzhenernyi Tsentr EÉS” (2007).
Yu. A. Orlov, A. S. Kuleshov, and O. Z. Seraya, “Construction of underground penstocks at the No. 2 Zagorskaya PSPP,” Gidrotekh. Stroit., No. 4 (2007).
Yu. V. Chesalin and K. I. Lobanov, “Design of the Zagorskaya PSPP and author inspection during its construction, ”Gidrotekh. Stroit., No. 10 (1999).
Author information
Authors and Affiliations
Additional information
Translated from Gicrotekhnicheskoe Stroitel’stvo, No. 12, December 2010, pp. 2 – 11.
Rights and permissions
About this article
Cite this article
Lobanov, K.I., Seraya, O.Z., Vladimirov, V.B. et al. Alternate plans and characteristics of design solutions for water-development works under construction at the No. 2 Zagorskaya pumped-storage power plant. Power Technol Eng 45, 25–34 (2011). https://doi.org/10.1007/s10749-011-0219-3
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10749-011-0219-3