Method for estimating and predicting the residual service life of condenser piping systems in steam-turbine units at thermal power plants

  • Published:
Power Technology and Engineering Aims and scope

Amethod for estimating and predicting the residual service life of condenser piping systems in steam turbines is presented. This method has been tested and applied to the Reftinskaya GRÉS (300 MW units) and the Surgut GRÉS-1 (200 MW units) state regional electric power plants.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Yu. M. Brodov (ed.), Heat Exchangers for Power Generating Installations: a Textbook for Institutes of Higher Education [in Russian], Izd. UGTU-UPI, Yekaterinburg (2008).

  2. Yu.M. Brodov (ed.), Increasing the Efficiency and Reliability of Heat Exchanger Apparatus for Steam Turbine Units: a Textbook [in Russian], Izd. UGTU-UPI, Yekaterinburg (2004).

  3. Yu. M. Brodov (ed.), Engineering Service and Repair of Heat Exchanger Apparatus for Steam Turbine Units: a Textbook [in Russian], Izd. UGTU-UPI, Yekaterinburg (2005).

  4. RD 34.17.439–96. Manual for Diagnostics and Extending the Service Lifetime of Pressure Vessels [in Russian], Izd. RAO “EÉS Rossii,” Moscow (1996).

  5. A. A. Shatalov, Kh. M. Khanukhov, and A. V. Alipov, “Predicting the residual lifetime of vertical steel reservoirs,” Bezopasn. Truda Promyshl., No. 3 (2005).

  6. Technical Conditions for Repair of Low Pressure Preheaters [in Russian], Izd. TsKB “Énergoremont,” Moscow (1982).

  7. TU 34-38-20092–94. High Pressure Surface Preheaters for Steam Turbine Regeneration Systems. Technical Conditions for Major Overhaul [in Russian], Izd. TsKB “Énergoremont,” Moscow (1994).

  8. OST 108.005.15–82. Specialized System for Monitoring the Production Quality in Power Generating Machine Construction. Evaluating the Quality Level of Power Generating Heat Exchanger Equipment for Electrical Power Plants [in Russian], Izd. NPO TsKTI, Leningrad (1983).

  9. SO 34.04.181–2003. Rules for Organizing the Technical Servicing and Repair of Equipment in the Buildings and Structures of Electrical Power Plants and Networks [in Russian], Izd. RAO “EÉS Rossii,” Moscow (2004).

  10. V. V. Bolotin, Predicting the Service Life of Machinery and Buildings [in Russian], Mashinostroenie, Moscow (1984).

    Google Scholar 

  11. B. V. Gnedenko, Yu. K. Belyaev, and A. Yu. Solov’ev, Mathematical Methods in Reliability Theory [in Russian], Nauka, Moscow (1965).

    Google Scholar 

  12. Yu. M. Brodov and P. N. Plotnikova (eds.), Reliability of Shell- Tubing Heat Exchanger Apparatus for Steam-turbine Units: a Textbook [in Russian], Izd. UGTU-UPI, Yekaterinburg (2008).

  13. Yu. M. Brodov, B. E. Murmanskii, M. M. Mitel’man, et al., “Reliability indices for major and auxiliary equipment in the turbines units at a thermal power plant of JSC ‘Sverdlovénergo’,” Élektr. Stantsii, No. 5 (1997).

  14. O. S. Anisimova, Yu. Brodov, A. Yu. Ryabchikov, et al., “Corrosion resistance of materials in the piping systems of heat exchanger apparatus for turbine units,” Praktika Protivokorroz. Zashch., No. 3 (1997).

  15. K. É. Aronson, Yu. M. Brodov, A. Yu. Ryabchikov, and B. E. Murmanskii, “Statistical modelling of the failure of heat exchanger apparatus with implementation of a comprehensive monitoring system for the state of steam turbine units,” Teploénergetika, No. 8 (2007).

  16. V. K. Sedov, V. V. Panchenko, and N. S. Gabriichuk, “Experience with the removal of blockages in steam-turbine condensers at the Novovoronezhskaya nuclear power plant, Élektr. Stantsii, No. 5 (1978).

  17. R. S. Reznikova, E. I. Benenson, Yu. M. Brodov, et al., “Determining the optimum times for replacement of the piping bundles in low pressure preheaters for steam turbines, Élektr. Stantsii, No. 5 (1985).

  18. R. S. Reznikova, E. I. Benenson, Yu. M. Brodov, et al., “Determining the optimum times for replacement of the piping bundles in heat exchanger apparatus for steam turbines,” Teploénergetika, No. 2 (1985).

  19. Standards for Operating Deductions for Taxation Purposes [in Russian], Delo i slovo, Moscow (2002).

  20. Yu. A. Tsagareli, “Prediction of the service lifetime of an operating condenser piping bundle, Élektr. Stantsii, No. 8 (1998).

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to K. É. Aronson.

Additional information

Translated from Élektricheskie Stantsii, No. 2, February 2010, pp. 25 – 31.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Aronson, K.É., Ryabchikov, A.Y., Brodov, Y.M. et al. Method for estimating and predicting the residual service life of condenser piping systems in steam-turbine units at thermal power plants. Power Technol Eng 44, 146–152 (2010). https://doi.org/10.1007/s10749-010-0156-6

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-010-0156-6

Keywords

Navigation