Skip to main content
Log in

Spillway construction at the Irganai HPP in Dagestan

  • Hydrotechnical Construction
  • Published:
Power Technology and Engineering Aims and scope

Experience with the opening of inclined workings is presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, June 2008, pp. 2–6.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Umanskii, R.Z., Balychevtsev, I.A., Dzherin, V.K. et al. Spillway construction at the Irganai HPP in Dagestan. Power Technol Eng 42, 191–195 (2008). https://doi.org/10.1007/s10749-008-0045-4

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-008-0045-4

Keywords

Navigation