The settlement of the bed and of the banks of channels, and other factors should be allowed for in the design of dams.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. A. M. Tsybin, Some Problems of Computation of Temperature Fields Connected with Construction and Operation of Waterworks Facilities under the Conditions of the Far North and Permafrost [in Russian].

  2. V. E. Ziskovich, “The third hydropower station of the Vilyui Cascade,” Gidrotekh. Stroit., No. 10 (1981).

  3. V. E. Ziskovich and A. G. Solov’eva, “Hydraulic studies for the Vilyuiskaya HPS-3,” in: Proc. of Conf. and Meetings on Hydraulic Engineering, Hydraulics, and Hydrotechnical Structures [in Russian], 1992.

  4. N. F. Krivonogova and V. E. Ziskovich, “Effect of geocryological studies of the region of design and construction of Vulyuiskaya HPS-3,” Gidrotekh. Stroit., No. 8 (1968).

  5. A. G. Solov’eva, A. M. Tsvik, and N. N. Tereshkov, “Construction of Vilyuiskaya HPS-3,” Gidrotekh. Stroit., No. 11 (2001).

Download references

Author information

Authors and Affiliations

Authors

Additional information

__________

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 4, April 2006, pp. 2–10.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Solov’eva, A.G., Tsvik, A.M. Analysis of hydraulic studies for substantiating design solutions of the Vilyuiskaya HPS-3. Power Technol Eng 40, 158–165 (2006). https://doi.org/10.1007/s10749-006-0040-6

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-006-0040-6

Keywords

Navigation