Abstract
A concept of repairing power plant turbogenerators according to their technical state and with allowance for the technical state in the transition period is presented. Diagnostic, organizational, engineering, and information aspects of the concept are considered. It is shown that transition to repairing turbogenerators according to their technical state is possible only on the basis of the use of an intellectual information-diagnostic system.
Similar content being viewed by others
References
RD 34.20.601-96. Methodological Guidelines on Improving the System of Maintenance and Repair of Power Units and Installations at TPP on the Basis of Repair Cycle with Assigned Turnaround Time [in Russian], Moscow (1996).
V. M. Nadtochii, N. A. Ordinyan, E. A. Osin, and A. S. Trofimov, “Power plants as information objects,” Élektr. Stantsii, No. 9 (2000).
V. M. Nadtochii, N. A. Ordinyan, E. A. Osin, et al., “On-line diagnostic system for turbogenerators of the Surgut GRÉS-2,” in: Vestnik VNIIÉ-2004, Izd. NTs ÉNAS (2004).
RD 34.45-51.300-97. Volume and Norms for Testing Electrical Equipment [in Russian], Izd. NTs. ÉNAS (2000).
B. A. Alekseev, Determination of the State (Diagnostics) of Large Turbogenerators [in Russian], Izd. NTs ÉNAS (2001).
Author information
Authors and Affiliations
Additional information
__________
Translated from Élektricheskie Stantsii, No. 9, September 2005, pp. 46–51.
Rights and permissions
About this article
Cite this article
Mamikonyants, L.G., Nadtochii, V.M., Samorodov, Y.N. et al. Concept of transfer to repair of power plant turbogenerators according to their technical state. Power Technol Eng 39, 359–363 (2005). https://doi.org/10.1007/s10749-006-0010-z
Issue Date:
DOI: https://doi.org/10.1007/s10749-006-0010-z