Skip to main content
Log in

Experience in the operation of the T-150-7.7 LMZ steam turbine under the conditions of the PGU-450 flow diagram

  • Published:
Power Technology and Engineering Aims and scope

Abstract

Results of five years of operation of a double-pressure cogeneration steam turbine T-150-7.7 under the conditions of the PGU-450T flow diagram at the North-West Cogeneration Plant in the condensing mode from the beginning of service of the power unit in December 2000 are analyzed.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

__________

Translated from Élektricheskie Stantsii, No. 10, October 2005, pp. 56–61.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lisyanskii, A.S., Radin, Y.A. Experience in the operation of the T-150-7.7 LMZ steam turbine under the conditions of the PGU-450 flow diagram. Power Technol Eng 39, 347–351 (2005). https://doi.org/10.1007/s10749-006-0007-7

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-006-0007-7

Keywords

Navigation