Skip to main content
Log in

Diversion tunnel of the Irganaiskaya waterworks facility and prospects of its use in the period of erection of the dam to intermediate levels

  • Published:
Power Technology and Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

References

  1. I. A. Aliev, A. A. Neikovskii, V. A. Red’kin et al., “Design solutions and state of the construction of Irganaiskaya HPP,” Gidrotekh. Stroit., No. 11 (2001).

  2. A. A. Neikovskii and G. L. Rubinshtein, “Operational diversion spillway of the Irganaiskaya HPP: design and hydrotechnical studies,” Gidrotekh. Stroit., No. 12 (2002).

  3. V. F. Ilyushin and E. I. Dubinchik, High-Head Subsurface Spillways [in Russian], Énergoatomizdat, Moscow (1983).

    Google Scholar 

  4. Recommendations on Allowance for Cavitation in Design of Hydrotechnical Spillways P 38-75 [in Russian], Izd. VNIIG (1976).

  5. Hydraulic Design of Hydrotechnical Spillways [in Russian], Énergoatomizdat, Moscow (1988).

  6. I. S. Novikova and V. M. Semenkov, “Permissible roughness of the surface of spillway structures according to the conditions of absence of cavitation erosion,” in: Mater. Conf. and Sessions on Hydraulic Engineering, Methods for Study and Hydraulic Design of Hydrotechnical Spillway Structures [in Russian], Izd. VNIIG (1985).

  7. State Standard GOST 26663-91. Heavy and Fine-Grain Concretes. Specifications [in Russian].

Download references

Author information

Authors and Affiliations

Authors

Additional information

__________

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 9, September 2005, pp. 43–49.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Abdurakhmanov, M.A., Bellendir, E.N., Kostin, V.V. et al. Diversion tunnel of the Irganaiskaya waterworks facility and prospects of its use in the period of erection of the dam to intermediate levels. Power Technol Eng 39, 324–329 (2005). https://doi.org/10.1007/s10749-006-0003-y

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-006-0003-y

Keywords

Navigation