Skip to main content
Log in

Experience of grouting works in the bed of the Bureya HPP dam

  • Published:
Power Technology and Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

References

  1. É. S. Argal and G. G. Tuzhikhin, “Cutoff devices in the bed of the dam of the Bureya waterworks facility (experience of design and first results of implementation),” Gidrotekh. Stroit., No. 8, 14–21 (2001).

    Google Scholar 

  2. VSN-34-83. Grouting of Rock Beds of Hydrotechnical Structures, Izd. Minénergo SSSR [in Russian].

Download references

Authors

Additional information

__________

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 9, September 2005, pp. 37–42.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Argal, É.S., Kudrin, K.P. & Tuzhikhin, G.G. Experience of grouting works in the bed of the Bureya HPP dam. Power Technol Eng 39, 319–323 (2005). https://doi.org/10.1007/s10749-006-0002-z

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-006-0002-z

Keywords

Navigation