References
É. S. Argal and G. G. Tuzhikhin, “Cutoff devices in the bed of the dam of the Bureya waterworks facility (experience of design and first results of implementation),” Gidrotekh. Stroit., No. 8, 14–21 (2001).
VSN-34-83. Grouting of Rock Beds of Hydrotechnical Structures, Izd. Minénergo SSSR [in Russian].
Additional information
__________
Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 9, September 2005, pp. 37–42.
Rights and permissions
About this article
Cite this article
Argal, É.S., Kudrin, K.P. & Tuzhikhin, G.G. Experience of grouting works in the bed of the Bureya HPP dam. Power Technol Eng 39, 319–323 (2005). https://doi.org/10.1007/s10749-006-0002-z
Issue Date:
DOI: https://doi.org/10.1007/s10749-006-0002-z