Skip to main content
Log in

Empirical Approaches for Design of Web Pillars in Highwall Mining: Review and Analysis

  • Technical note
  • Published:
Geotechnical and Geological Engineering Aims and scope Submit manuscript

Abstract

Pillar design is of paramount importance to any underground mine design. Oversized pillars may lead to loss of coal while undersized pillars may lead to instability. While underground pillars are mostly square and rectangular, highwall mining pillars are long and narrow, as they are formed after driving parallel entries in the seam from the highwall. These pillars are termed as web pillars. The overall stability of highwall depends upon these pillars as no other supports are provided in the entries. Web pillar differs from usual coal pillars in respect of w/h ratio being <3.0, with an exceptionally longer length compared to its width, to the tune of 50–500 m. Several empirical coal pillar strength equations developed for rectangular pillars are still being used with some modifications to adapt to web pillars. Review and analysis of these empirical approaches for determining web pillar strength along with a numerical approach for web pillar design are discussed in this paper. Their application to some Indian case studies is also discussed.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11

Similar content being viewed by others

References

  • Adhikary DP, Duncan Fama ME (2001) Highwall mining panel stability. CSIRO exploration and mining report No. 754F

  • Adhikary DP, Shen B, Duncan Fama ME (2002) A study of highwall mining panel stability. Int J Rock Mech Min Sci 39:643–659

    Article  Google Scholar 

  • Bieniawski ZT (1968) The effect of specimen size on compressive strength of coal. Int J Rock Mech Min Sci 5:325–335

    Google Scholar 

  • Bunting D (1911) Chamber pillars in deep anthracite mines. Trans AIME 42:236–245

    Google Scholar 

  • Das MN (1986) Influence of width to height ratio on post-failure behaviour of coal. Int J Min Geol Eng 4(1986):79–87

    Article  Google Scholar 

  • Duncan Fama ME, Trueman R, Craig MS (1995) Two-and-three-dimensional elasto-plastic analysis for coal pillar design and its application to highwall mining. Int J Rock Mech Min Sci Geomech Abstr 32(3):215–225

    Article  Google Scholar 

  • Duncan Fama ME, Shen B, Boland JN, Harbers C, Carvolth D, Leisemann BE, Maconochie AP (1999) Investigation and design for pit 20D upper for highwall mining operations at Moura Mine, Queensland. CSIRO exploration and mining report No. 605F

  • Duncan Fama ME, Craig MS, Coulthard MA (1999b) Factors affecting design of highwall mining pillars: parametric studies. CSIRO exploration and mining report No. 617F

  • Duncan Fama ME, Shen B, Maconochie P (2001) Optimal design and monitoring of layout stability for highwall mining. CSIRO exploration and mining report No. 887F

  • Galvin JM, Hebblewhite BK, Salmon MDG (1999) University of New South Wales coal pillar strength determinations for Australian and South African mining conditions. In: Proceedings of 2nd workshop on coal pillar mechanics and design, NIOSH IC 9448, pp. 63–72

  • Greenwald HP, Howarth HC, Hartman I (1939) Experiments on strength of small pillars of coal in the Pittsburgh bed. U. S. Bureau of Mines, Washington, Technical Paper 605

  • Holland CT (1964) The strength of coal in mine pillars, In: Proceedings of the 6th symposium on rock mechanics. University of Missouri, Rolla, MO, pp 450–456

  • Holland CT, Gaddy FL (1956) Some aspects of permanent support of overburden on coal beds. In: Proceedings of West Virginia Coal Mining Institute, pp 43–65

  • Loui JP, PalRoy P, Kushwaha A, Rao KUM (2008) Web and barrier pillar design for Highwall Mining at OCP-II of SCCL, India. In: Proceedings of Korean rock mechanics symposium on international cooperation and rock engineering for development of mineral resources and infrastructures, Korea, October 21–23, 2008, pp 123–134

  • Loui JP, Roy PP, Sinha A (2011) Design of highwall mining at West Bokaro. Division of Tata Steel Limited, India, IE (I). J MN 92:1–7

    Google Scholar 

  • Mark C, Chase FE (1997) Analysis of retreat mining pillar stability (ARMPS). In: Proceedings—new technology for ground control in retreat mining. USA National Institute for Occupational Safety and Health, Pittsburgh, PA. DHHS (NIOSH) publication no. 97–122, IC 9446, 1997, pp 17–34

  • Mohan GM, Sheorey PR, Kushwaha A (2001) Numerical estimation of pillar strength in coal mines. Int J Rock Mech Min Sci 38:1185–1192

    Google Scholar 

  • Ryder JA, Ozbay MU (1990) A methodology for designing pillar layouts for shallow mining. In: Brummer (ed) Static and dynamic considerations in rock engineering. Balkema, Rotterdam, pp 273–274

    Google Scholar 

  • Salamon MDG, Munro AH (1967) A study of the strength of coal pillars. J S Afr Inst Min Metall, 68:55–67

    Google Scholar 

  • Sheorey PR (1992) Pillar strength considering in situ stress. Workshop on coal pillar mechanics and design, Santa Fe., U.S.B.M, I.C.9315, pp 122–127

  • Sheorey PR (1997) Empirical rock failure criteria. A.A. Balkema, Rotterdam

    Google Scholar 

  • Sheorey PR, Singh B (1974) Strength of rectangular pillars in partial extraction. Int J Rock Mech Min Sci Geomech Abstr 11:41–44

    Article  Google Scholar 

  • Sheorey PR, Das MN, Barat D, Prasad RK, Singh B (1987) Coal pillar strength estimation from failed and stable cases. Int J Rock Mech Min Sci Geomech Abstr 24(6):347–355

    Article  Google Scholar 

  • Vandergrift T, Garcia J (2005) Highwall mining in a multiple seam, western United States setting design and performance. In: Proceedings of 24th international conference on ground control in mining, Morgantown, West Virginia August 2–4, 2005

  • Wagner H (1974) Determination of the complete load deformation characteristics of coal pillars. In: Proceedings of the 3rd international congress on rock mechanics. International Society for Rock Mechanics, 1974, pp 1076–1081

  • Zipf RK (2005) Ground control design for highwall mining. SME preprint 05–82. Littleton, CO, Society for Mining, Metallurgy, and Exploration, Inc., 2005 Feburary, pp 1–7

  • Zipf RK, Mark C (2005) Ground control for highwall mining in the United States. Int J Surf Min Reclam Environ 19(3):188–217

    Article  Google Scholar 

Download references

Acknowledgments

The authors are thankful to Australia India Strategic Research Fund (AISRF) for partially funding this research work. The authors are grateful to The Director, CIMFR, Dhanbad, India and The Director, VNIT, Nagpur, India for their permission to publish this paper. The help and cooperation provided by SCCL, AMT and TSL are also gratefully acknowledged. Views expressed are of the authors and not necessarily of the institute to which they belong.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Chandrani P. Verma.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Verma, C.P., Porathur, J.L., Thote, N.R. et al. Empirical Approaches for Design of Web Pillars in Highwall Mining: Review and Analysis. Geotech Geol Eng 32, 587–599 (2014). https://doi.org/10.1007/s10706-013-9713-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10706-013-9713-8

Keywords

Navigation