Abstract
Prosecution of experts in the wake of disasters has emerged as common in the context of increasing social intolerance of risk. This paper examines expert blame using as a case study the decisions of engineers who operated Wivenhoe Dam during the Queensland floods in January 2011 and the criticisms of those decisions by the subsequent Commission of Inquiry. Our analysis draws on the literature on organisational safety, organisational learning and expertise to examine the relevance of the criteria against which the engineers were judged, the relevant competence of those who made this assessment and the broader implications of such exercises. Our analysis shows that lay judgements of expert practice can be misleading, as evidenced by the Commission of Inquiry’s misguided focus on procedural adherence. We argue that such inquiries—where the focus is on assigning blame—detract from opportunities to learn from incidents and can negatively impact on professional practices. If the aim is to make future disasters less likely, then inquiries that take this approach may be failing in this endeavour, or at least not maximising their contribution.
Similar content being viewed by others
References
Arvai JL, Froschauer A (2010) Good decisions, bad decisions: the interaction of process and outcome in evaluations of decision quality. J Risk Res 13(7):845–859
Beck U (1992) Risk society: towards a new modernity (trans: Ritter M). Sage, London
Bentham IMF (2013) Wivenhoe Dam overview. IMF (Australia) Ltd. http://www.imf.com.au/cases/info-pack-request/wivenhoe-dam-overview. Accessed 20 Dec 2013
Bourrier M, Bieder C (2013) Trapping safety into rules: an introduction. In: Bieder C, Bourrier M (eds) Trapping safety into rules: how desirable or avoidable is proceduralization. Ashgate, Surrey, pp 1–9
Branford K (2009) The ‘no blame’ approach: investigating blame in systemic accident analyses. In: Hopkins A (ed) Learning from high reliability organisations. CCH Australia, Sydney, pp 179–192
Brennan TA, Colin M, Sox CM, Burstin HR (1996) Relation between negligent adverse events and the outcomes of medical malpractice litigation. N Engl J Med 335(26):1963–1967
Brown JS, Duguid P (1991) Organizational learning and communities of practice: toward a unified view of working, learning, and innovation. Organ Sci 2(1):40–57
Burns E (2007) Positioning a post-professional approach to studying professions. N Z Sociol 22(1):69–98
Chisholm H, Shaw S (2004) Prove it! The ‘tyranny’ of audit and accreditation in the New Zealand outdoors industry. Leis Stud 23(4):317–327
Clarke JN (2000) The search for legitimacy and the “expertization” of the lay person. Soc Work Health Care 30(3):73–93
Collins H, Evans R (2007) Rethinking expertise. The University of Chicago Press, Chicago
Connelly G, McMahon M (2007) Chartered teacher: accrediting professionalism for Scotland’s teachers—a view from the inside. J In-Serv Educ 33(1):91–105
Dekker S (2011) The criminalization of human error in aviation and healthcare: a review. Saf Sci 49(2):121–127
Dekker S (2012) Just culture: balancing safety and accountability, 2nd edn. Ashgate, Aldershot
Douglas M (1992) Risk and blame: essays in cultural theory. Routledge, London
Duguid P (2005) “The art of knowing”: social and tacit dimensions of knowledge and the limits of the community of practice. Inf Soc 21(2):109–118
Engineers Australia Queensland Division (2012a) CMC findings clear Wivenhoe engineers. http://www.engineersaustralia.org.au/news/cmc-findings-clear-wivenhoe-engineers. Accessed 3 Oct 2013
Engineers Australia Queensland Division (2012b) Wivenhoe Dam engineers not scapegoats. http://www.engineersaustralia.org.au/news/wivenhoe-dam-engineers-not-scapegoats. Accessed 3 Oct 2013
Fielding N, Thomas H (2001) Qualitative interviewing. In: Gilbert N (ed) Researching social life. Sage, London, pp 123–144
Flick U (2002) An introduction to qualitative research. Sage, London
Fowler D (2013) Proceduralization of safety assessment: a barrier to rational thinking. In: Bieder C, Bourrier M (eds) Trapping safety into rules: how desirable or avoidable is proceduralization? Ashgate, Farnham, pp 87–106
Fucks I, Dien Y (2013) ‘No rule, no use’? The effects of over-proceduralization. In: Bieder C, Bourrier M (eds) Trapping safety into rules: how desirable or avoidable is proceduralization? Ashgate, Farnham, pp 27–42
Furze G, Pearcey P (1999) Continuing education in nursing: a review of the literature. J Adv Nurs 29(2):355–363
Gherardi S, Nicolini D (2002) Learning the trade: a culture of safety in practice. Organization 9(2):191–223
Groopman J (2000) Second opinions: stories of intuition and choice in the changing world of medicine. Viking Penguin, New York
Hale A, Borys D (2013) Working to rule or working safely? Part 2: the management of safety rules and procedures. Saf Sci 55:222–231
Hayes J (2013) Operational decision-making in high-hazard organizations: drawing a line in the sand. Ashgate, Farnham
Hidden A (1989) Investigation into the Clapham Junction railway accident. Department of Transport, London
Hockey J (2009) ‘Switch on’: sensory work in the infantry. Work Employ Soc 23(3):477–493
Hudson PTW (1999) Safety culture—theory and practice. Paper presented at the human factors and medicine panel (HFM) workshop: the human factor in system reliability: is human performance predictable? Siena, Italy.
Ingold T (2000) The perception of the environment: essays on livelihood, dwelling, and skill. Routledge, London
Jerrard J (2012) Advice of John Jerrard QC concerning examination of material provided to the Crime and Misconduct Commission pursuant to Recommendation 16.1 of the Queensland Floods commission of inquiry’s final report. Crime and Misconduct Commission, Brisbane
Klein G (1998) Sources of power: how people make decisions. MIT Press, Cambridge
Klein G (2009) Streetlights and shadows: searching for the keys to adaptive decision making. Massachusetts Institute of Technology Press, Cambridge
Lam A (2000) Tacit knowledge, organizational learning and societal institutions: an integrated framework. Organ Stud 21(3):487–513
LaPorte T (2013) Postscript: reflections on procedures, trial and error, and functional forgiveness. In: Bieder C, Bourrier M (eds) Trapping safety into rules: how desirable or avoidable is proceduralization. Ashgate, Surrey, pp 257–271
Layder D (1998) Sociological practice: linking theory and social research. Sage, London
Legat A (2008) Walking stories; leaving footprints. In: Ingold T, Vergunst JL (eds) Ways of walking: ethnography and practice on foot. Ashgate, Surrey, pp 35–49
Levy J (2000) Engineering education in the United Kingdom: standards, quality assurance and accreditation. Int J Eng Educ 16(2):136–145
May C (2007) The clinical encounter and the problem of context. Sociology 41(1):29–45
Mintzberg H (1979) The structuring of organizations. Prentice-Hall, Englewood Cliffs
Nyiri JC (1988) Tradition and practical knowledge. In: Nyiri JC, Smith B (eds) Practical knowledge: outlines of a theory of traditions and skills. Croom Helm, London, pp 17–52
Pelegrin C (2013) The never-ending story of proceduralization in aviation. In: Bieder C, Bourrier M (eds) Trapping safety into rules: how desirable or avoidable is proceduralization? Ashgate, Farnham, pp 13–26
Polanyi M (1958) Personal knowledge: towards a postcritical philosophy. Routledge, London
Polanyi M (1966) The tacit dimension. The University of Chicago Press, Chicago
Prior L (2003) Belief, knowledge and expertise: the emergence of the lay expert in medical sociology. Sociol Health Illn 25(2):41–57
Queensland Floods Commission of Inquiry (2011) About the commission. Department of Justice and Attorney-General. Accessed 18 Dec 2013
Queensland Floods Commission of Inquiry (2012) Queensland floods commission of inquiry: final report. Queensland Government, Brisbane
Reason J (1997) Managing the risks of organizational accidents. Ashgate, Aldershot
Renn O (2008) Concepts of risk: an interdisciplinary approach, Part 2: integrative approaches. GAIA Ecol Perspect Sci Soc 17(2):196–204
Renn O, Klinke A (2012) Complexity, uncertainty and ambiguity in inclusive risk governance. In: Measham T, Lockie S (eds) Risk and social theory in environmental management. CSIRO, Canberra, pp 59–76
Roe E, Schulman PR (2008) High reliability management: operating on the edge. Standford University Press, Stanford
Russell L (1990) From Nightingale to now: nurse education in Australia. W.B.Saunders, Sydney
SEQWater (2010) Manual of operational procedures for flood mitigation at Wivenhoe Dam and Somerset Dam, revision 7 edn. SEQWater, Brisbane
Sharpe VA (ed) (2004) Accountability: patient safety and policy reform. Georgetown University Press, Washington
Smith E (2008) What sport tells us about life. Penguin Books, London
The World Bank Group and Queensland Reconstruction Authority (2011) Queensland recovery and reconstruction in the aftermath of the 2010/2011 flood events and Cyclone Yasi. The World Bank Group and Queensland Reconstruction Authority, Washington
Turner BA, Pidgeon NF (1997) Man-made disasters, 2nd edn. Butterworth-Heinemann, Oxford
United States Department of Interior Bureau of Reclamation, United States Army Corps of Engineers (2012) Independent review of Seqwater’s Flood event report: for the January 2011 Flood event at Somerset and Wivenhoe Dams. United States Department of Interior Bureau of Reclamation and United States Army Corps of Engineers, Confluence
Vervoorn A (2000) Mountain solitudes: solo journeys in the Southern Alps of New Zealand. Craig Potton, Nelson
Weick KE, Sutcliffe KM (2001) Managing the unexpected: assuring high performance in an age of complexity. Jossey-Bass, San Francisco
Wenger E (1998) Communities of practice: learning, meaning, and identity. Cambridge University Press, Cambridge
Acknowledgments
Some of the ethnographic research on which this article draws was funded by the Energy Pipelines Cooperative Research Centre, supported through the Australian Government’s Cooperative Research Centres Program. The cash and in-kind support from the Australian Pipeline Industry Association Research and Standards Committee is gratefully acknowledged.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Maslen, S., Hayes, J. Experts under the microscope: the Wivenhoe Dam case. Environ Syst Decis 34, 183–193 (2014). https://doi.org/10.1007/s10669-014-9492-7
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10669-014-9492-7