Skip to main content
Log in

Key steps in environmental impact assessment: a comparative study of China, Queensland State of Australia and Nepal

  • Published:
Environmental Monitoring and Assessment Aims and scope Submit manuscript

Abstract

Environmental impact assessment (EIA) has evolved as an environmental management and sustainability tool. Despite common principles shared by EIA globally, there are considerable variations in EIA processes across countries. In this paper, we reviewed and compared EIA processes of China, Queensland State of Australia and Nepal considering five key steps (selection of consultants, report preparation, public participation, report review and approval, and monitoring and evaluations) of EIA. Our review indicated that the EIA is well recognised in legal instruments in all state and countries under consideration and there are both similarities and differences in key steps of EIA. Monitoring of EIA recommendations and the integration of feedbacks from the past and current practices are important in improving EIA processes. This study also found that there are elements for possible improvement in existing EIA processes by each state and country introducing the best practices from others’ EIA system. Some of the practices that Nepal can follow from the EIA processes of Queensland and China are licensing and accreditation of individuals and firms to conduct EIA, establishment of separate monitoring unit within regulating department, development of clear guidelines for approvals and monitoring, and the use of independent third-party auditing in EIA monitoring. The findings of this paper are useful in revising and improving EIA policies, practices and processes in the selected state, countries and elsewhere.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Explore related subjects

Discover the latest articles, news and stories from top researchers in related subjects.

References

  • Ahmad, B., & Wood, C. (2002). A comparative evaluation of the EIA systems in Egypt, Turkey and Tunisia. Environmental Impact Assessment Review, 22(3), 213–234.

    Article  Google Scholar 

  • Aryal, S., Cockfield, G., & Maraseni, T. N. (2018). Globalisation and traditional social-ecological systems: understanding impacts of tourism and labour migration to the transhumance systems in the Himalayas. Environmental Development, 25, 73–84. https://doi.org/10.1016/j.envdev.2017.09.001.

    Article  Google Scholar 

  • Bhatt, R. P., & Khanal, S. N. (2010). Environmental impact assessment system and process: a study on policy and legal instruments in Nepal. African Journal of Environmental Science and Technology, 4(9), 586–594.

    Google Scholar 

  • Bilgin, A. (2015). Analysis of the environmental impact assessment (EIA) directive and the EIA decision in Turkey. Environmental Impact Assessment Review, 53, 40–51. https://doi.org/10.1016/j.eiar.2015.04.001.

    Article  Google Scholar 

  • Brombal, D., Moriggi, A., & Marcomini, A. (2017). Evaluating public participation in Chinese EIA. An integrated Public Participation Index and its application to the case of the New Beijing Airport. Environmental Impact Assessment Review, 62(Supplement C), 49–60. https://doi.org/10.1016/j.eiar.2016.07.001.

    Article  Google Scholar 

  • Chang, I. S., Wang, W., Wu, J., Sun, Y., & Hu, R. (2018). Environmental impact assessment follow-up for projects in China: institution and practice. Environmental Impact Assessment Review, 73, 7–19. https://doi.org/10.1016/j.eiar.2018.06.005.

    Article  Google Scholar 

  • Chen, J. (2013). Public participation provisions in environmental impact assessment (EIA) legal system case studies in China, India and Indonesia. Utrecht University.

  • Chen, Q., Zhang, Y., & Ekroos, A. (2007). Comparison of China’s environmental impact assessment (EIA) law with the European Union (EU) EIA directive. Environmental monitoring assessment, 132(1–3), 53–65.

    Article  Google Scholar 

  • Dangi, M. B., Fernandez, D., Bom, U. B., Belbase, S., & Kaphle, R. (2015). Evaluation of environmental impact assessment report preparation and public participation in landfill projects in Nepal. Habitat International, 46, 72–81. https://doi.org/10.1016/j.habitatint.2014.10.021.

    Article  Google Scholar 

  • DES (2019). The National Partnership Agreement on Coal Seam Gas and Large Mining Development. https://environment.des.qld.gov.au/management/impact-assessment/pdf/protocol.pdf. Accessed 27/05/2019 2019.

  • DSD (2017). Overview: management and enforcement of Coordinator-General conditions. In D. o. S. D. (DSD) (Ed.). Queensland, Australia: State of Queensland.

  • DSD (2019). Compliance. https://www.statedevelopment.qld.gov.au/compliance-monitoring-and-enforcement/. Accessed 22/04/2019 2019.

  • EHP (2018). Environmental Impact Statement (EIS) Processes. https://www.ehp.qld.gov.au/management/impact-assessment/. Accessed 20/04 2018.

  • Elliott, M. (2014). Environmental impact assessment in australia : theory and practice (6th ed.). Annandale: The Federation Press.

    Google Scholar 

  • EPA. (1996). Environment Protection Act. Government of Nepal.

  • EPBC Act (1999). Environmental Protection and Biodiversity Conservation Act 1999. Government of Australia.

  • EPR (1997). Environment Protection Rules. Government of Nepal.

  • Formby, J. (1987). The Australian government’s experience with environmental impact assessment. Environmental Impact Assessment Review, 7(3), 207–226.

    Article  Google Scholar 

  • Jalava, K., Haakana, A.-M., & Kuitunen, M. (2015). The rationale for and practice of EIA follow-up: an analysis of Finnish road projects. Impact Assessment and Project Appraisal, 33(4), 255–264. https://doi.org/10.1080/14615517.2015.1069997.

    Article  Google Scholar 

  • Jay, S., Jones, C., Slinn, P., & Wood, C. (2007). Environmental impact assessment: retrospect and prospect. Environmental Impact Assessment Review, 27(4), 287–300. https://doi.org/10.1016/j.eiar.2006.12.001.

    Article  Google Scholar 

  • Jerpåsen, G. B., & Larsen, K. C. (2011). Visual impact of wind farms on cultural heritage: a Norwegian case study. Environmental Impact Assessment Review, 31(3), 206–215. https://doi.org/10.1016/j.eiar.2010.12.005.

    Article  Google Scholar 

  • Jha-Thakur, U., & Fischer, T. B. (2016). 25years of the UK EIA system: strengths, weaknesses, opportunities and threats. Environmental Impact Assessment Review, 61, 19–26. https://doi.org/10.1016/j.eiar.2016.06.005.

    Article  Google Scholar 

  • Khan, M., Chaudhary, M. N., Ahmad, S. R., Saif, S., & Mehmood, A. J. E. I. A. R. (2018). Challenges to EIA consultants whilst dealing with stakeholders in Punjab, Pakistan., 73, 201–209.

  • Le Blanc, D. (2015). Towards integration at last? The sustainable development goals as a network of targets. Journal of Sustainable Development, 23(3), 176–187.

    Article  Google Scholar 

  • Leknes, E. (2001). The roles of EIA in the decision-making process. Environmental Impact Assessment Review, 21(4), 309–334.

    Article  Google Scholar 

  • Li, J. C. (2008). Environmental impact assessments in developing countries: an opportunity for greater environmental security.

    Google Scholar 

  • Loomis, J. J., & Dziedzic, M. (2018). Evaluating EIA systems’ effectiveness: a state of the art. Environmental Impact Assessment Review, 68(Supplement C), 29–37. https://doi.org/10.1016/j.eiar.2017.10.005.

    Article  Google Scholar 

  • McCullough, A. (2017). Environmental impact assessments in developing countries: we need to talk about politics. The Extractive Industries and Society, 4(3), 448–452. https://doi.org/10.1016/j.exis.2017.07.002.

    Article  Google Scholar 

  • Morgan, R. K. (2012). Environmental impact assessment: the state of the art. Impact Assessment and Project Appraisal, 30(1), 5–14.

    Article  Google Scholar 

  • Morrison-Saunders, A., & Bailey, M. (2009). Appraising the role of relationships between regulators and consultants for effective EIA. Environmental Impact Assessment Review, 29(5), 284–294. https://doi.org/10.1016/j.eiar.2009.01.006.

    Article  Google Scholar 

  • Morrison-Saunders, A., & Retief, F. (2012). Walking the sustainability assessment talk — Progressing the practice of environmental impact assessment (EIA). Environmental Impact Assessment Review, 36, 34–41. https://doi.org/10.1016/j.eiar.2012.04.001.

    Article  Google Scholar 

  • Morrison-Saunders, A., Baker, J., & Arts, J. (2003). Lessons from practice: towards successful follow-up. Impact Assessment and Project Appraisal, 21(1), 43–56. https://doi.org/10.3152/147154603781766527.

    Article  Google Scholar 

  • Munch-Petersen, J. (2017). Public participation in environmental impact assessment of hydropower plants in Nepal: a context-specific approach. Colombo.

    Book  Google Scholar 

  • Negligence in EIA of Nijgadh Airprt, copy paste from hydropower project. (2018, 14 September 2018). Himalkhabar.

  • Nilsson, M., Griggs, D., & Visbeck, M. J. N. N. (2016). Policy: map the interactions between Sustainable Development Goals. 534(7607), 320.

  • Noble, B. F. (2000). Strategic environmental assessment: what is it? & what makes it strategic? Journal of Environmental Assessment Policy and Management, 2(02), 203–224.

    Article  Google Scholar 

  • O’Faircheallaigh, C. (2010). Public participation and environmental impact assessment: purposes, implications, and lessons for public policy making. Environmental Impact Assessment Review, 30(1), 19–27. https://doi.org/10.1016/j.eiar.2009.05.001.

    Article  Google Scholar 

  • Panigrahi, J. K., & Amirapu, S. (2012). An assessment of EIA system in India. Environmental Impact Assessment Review, 35, 23–36. https://doi.org/10.1016/j.eiar.2012.01.005.

    Article  Google Scholar 

  • Pavlickova, K., & Vyskupova, M. (2015). A method proposal for cumulative environmental impact assessment based on the landscape vulnerability evaluation. Environmental Impact Assessment Review, 50, 74–84. https://doi.org/10.1016/j.eiar.2014.08.011.

    Article  Google Scholar 

  • Peterlin, M., Kross, B. C., & Kontic, B. (2008). A method for the assessment of changes in environmental perception during an EIA process. Environmental Impact Assessment Review, 28(8), 533–545. https://doi.org/10.1016/j.eiar.2008.01.001.

    Article  Google Scholar 

  • Pokharel (2018). Negligence in EIA of Nijgadh Airprt, copy paste from hydropower project. Himalkhabar.

  • Saeed, R., Sattar, A., Iqbal, Z., Imran, M., & Nadeem, R. (2012). Environmental impact assessment (EIA): an overlooked instrument for sustainable development in Pakistan. Environmental Monitoring and Assessment, 184(4), 1909–1919. https://doi.org/10.1007/s10661-011-2088-5.

    Article  Google Scholar 

  • Sandham, L. A., van Heerden, A. J., Jones, C. E., Retief, F. P., & Morrison-Saunders, A. N. (2013). Does enhanced regulation improve EIA report quality? Lessons from South Africa. Environmental Impact Assessment Review, 38, 155–162. https://doi.org/10.1016/j.eiar.2012.08.001.

    Article  Google Scholar 

  • Sheaves, M., Coles, R., Dale, P., Grech, A., Pressey, R. L., & Waltham, N. J. (2016). Enhancing the value and validity of EIA: serious science to protect Australia’s Great Barrier Reef. Conservation Letters, 9(5), 377–383. https://doi.org/10.1111/conl.12219.

    Article  Google Scholar 

  • Sovacool, B. K., Dhakal, S., Gippner, O., & Bambawale, M. J. (2011). Halting hydro: a review of the socio-technical barriers to hydroelectric power plants in Nepal. Energy, 36(5), 3468–3476. https://doi.org/10.1016/j.energy.2011.03.051.

    Article  Google Scholar 

  • Sustainable Planning Act (2009). Sustainable Planning Act 2009. Queensland Government.

  • Swangjang, K. J. E. I. A. R. (2018). Comparative review of EIA in the Association of Southeast Asian Nations., 72, 33–42.

  • UN. (2019). In M. L. Kortes (Ed.), World economic situations and prospects. United Nations.

  • Uprety, B. K. (2003). Environmntal imapct assessment: process and practice (1st ed.). Koteshwor, Kathamndu: Mrs Uttara Uprety.

    Google Scholar 

  • Waldeck, S., Morrison-Saunders, A., & Annandale, D. (2003). Effectiveness of non-legal EIA guidance from the perspective of consultants in Western Australia. Impact Assessment and Project Appraisal, 21(3), 251–256.

    Article  Google Scholar 

  • Wang, S. (2017). Review of the legislation on public participation in EIA in China: from disorder to normalization. Environmental Policy and Governance in China: Springer.

    Google Scholar 

  • Wang, Y., Morgan, R. K., & Cashmore, M. (2003). Environmental impact assessment of projects in the People’s Republic of China: new law, old problems. Environmental Impact Assessment Review, 23(5), 543–579. https://doi.org/10.1016/S0195-9255(03)00071-4.

    Article  Google Scholar 

  • Wayakone, S., & Makoto, I. J. J.o E P. (2012). Evaluation of the environmental impacts assessment (EIA) system in Lao PDR., 3(12), 1655.

  • Weston, J. (2004). EIA in a risk society. Journal of Environmental Planning and Management, 47(2), 313–325. https://doi.org/10.1080/0964056042000209058.

    Article  Google Scholar 

  • WorldBank (2006). Environmental impact assessment regulations and strategic environmental assessment requirements: practices and lessons learned in East and Southeast Asia. (Vol. SAFEGUARD DISSEMINATION NOTE NO. 2 ).

  • Zhao, Y. (2010). Public participation in China’s EIA regime: rhetoric or reality? Journal of Environmental Law, 22(1), 89–123. https://doi.org/10.1093/jel/eqp034.

    Article  Google Scholar 

  • Zhu, T., & Lam, K.-C. (2009). Environmental impact assessment in China. Research Centre of Strategic Environmental Assessment for China and Chinese University of Hong Kong.

  • Zhu, D., & Ru, J. (2008). Strategic environmental assessment in China: motivations, politics, and effectiveness. Journal of Environmental Management, 88(4), 615–626. https://doi.org/10.1016/j.jenvman.2007.03.040.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Suman Aryal.

Additional information

Publisher’s note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Aryal, S., Maraseni, T., Qu, J. et al. Key steps in environmental impact assessment: a comparative study of China, Queensland State of Australia and Nepal. Environ Monit Assess 192, 139 (2020). https://doi.org/10.1007/s10661-020-8098-4

Download citation

  • Received:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s10661-020-8098-4

Keywords

Navigation