Skip to main content
Log in

Abandonment Decision-Making of Overseas Oilfield Project Coping with Low Oil Price

  • Published:
Computational Economics Aims and scope Submit manuscript

Abstract

The abandonment option of an operating oil project refers to the right to shut down or transfer the project. As a kind of American real option, it minimizes the impact of bad operating conditions, thus increases the initial project value. Meanwhile, as a put option, it maximizes the management flexibility in unfavorable environment, especially in the current low oil prices. This article uses the trinomial tree, rather than the binomial tree widely practiced in finance, to value the option. Its lattice structure shows flexibility and intelligibility, and improves computational efficiency and accuracy. In this article, the abandonment option value incorporates uncertainties of oil price, exchange rate, political environment and taxation policy. The risk-neutral based decisions are relatively objective for oil companies. The case study indicates that the relative relationship between the abandonment option value and the project scrap value or selling price is the key to the decision-making results. A novel conclusion from the risk-neutral prospective is that, the project is more likely to be sold at higher risk scenario or with higher profit requirement. Moreover, export duty and mineral extraction tax have a greater impact on the abandonment timing than corporate income tax. This decision-making model can be introduced with modifications to other investments with increasing risk of falling asset price.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4

Data source: The oil-price and exchange-rate series come from World Bank, IMF and EIA. The political environment series come from the political index in ICRG (2016)

Fig. 5
Fig. 6

Similar content being viewed by others

References

  • Abadie, L. M., & Chamorro, J. M. (2014). Valuation of wind energy projects: A real options approach. Energies,7(5), 3218–3255.

    Article  Google Scholar 

  • Barria, C., & Rudnick, H. (2011). Investment under uncertainty in power generation: Integrated electricity prices modeling and real options approach. IEEE Lat America Transactions,9(5), 785–792.

    Article  Google Scholar 

  • Boyle, P. P. (1988). A lattice framework for option pricing with two state variables. Journal of Financial and Quantitative Analysis,23(01), 1–12.

    Article  Google Scholar 

  • Clarke, H. R., & Reed, W. J. (1990). Oil-Well valuation and abandonment with price and extraction rate uncertain. Resources and Energy,12(4), 361–382.

    Article  Google Scholar 

  • Ding, Z. Z., & Zeng, H. (2005). Trinary-tree pricing model of real options. Statistical Research,11, 25–28.

    Google Scholar 

  • Dixit, A. K., & Pindyck, R. S. (1994). Investment under uncertainty. Princeton: Princeton University Press.

    Book  Google Scholar 

  • Franklin, S. L., & Diallo, M. (2013). Real options and cost-based access pricing: Model and methodology. Telecommunications Policy,37(4–5), 321–333.

    Article  Google Scholar 

  • He, L. Y., & Chen, Y. (2013). Thou shalt drive electric and hybrid vehicles: Scenario analysis on energy saving and emission mitigation for road transportation sector in China. Transport Policy,25(1), 30–40.

    Article  Google Scholar 

  • He, L. Y., Fan, Y., & Wei, Y. M. (2009). Impact of speculator’s expectations of returns and time scales of investment on crude oil price behaviors. Energy Economics,31(1), 77–84.

    Article  Google Scholar 

  • He, L. Y., & Qiu, L. Y. (2016). Transport demand, harmful emissions, environment and health co-benefits in China. Energy Policy,97, 267–275.

    Article  Google Scholar 

  • Kosowski, P., & Stopa, J. (2012). An estimation of profitability of investment projects in the oil and gas industry using real options theory. Archives of Mining Sciences,57(2), 391–401.

    Article  Google Scholar 

  • KvalevAa, G. T. (2009). How do discounted cash flow analysis and real options differ as basis for decision making about oil and gas field developments?. Copenhgen: Copenhgen Business School, M1—Master.

    Google Scholar 

  • Lin, J., de Weck, O., de Neufville, R., & Yue, H. K. (2013). Enhancing the value of offshore developments with flexible subsea tiebacks. Journal of Petroleum Science and Engineering,102, 73–83.

    Article  Google Scholar 

  • Liu, L., & He, L. Y. (2017). Application of flexible function forms in climate change research: Theoretical regularity and model selection. Journal of Cleaner Production,165, 1115–1124.

    Article  Google Scholar 

  • Mi, Z. F., Wei, Y. M., Tang, B. J., Cong, R. G., Yu, H., Cao, H., et al. (2017). Risk assessment of oil price from static and dynamic modelling approaches. Applied Economics,49(9), 929–939.

    Article  Google Scholar 

  • Monjas-Barroso, M., & Balibrea-Iniesta, J. (2013). Valuation of projects for power generation with renewable energy: A comparative study based on real regulatory options? Energy Policy,55, 335–352.

    Article  Google Scholar 

  • Munoz, J. I., Contreras, J., Caamano, J., & Correia, P. F. (2011). A decision-making tool for project investments based on real options: the case of wind power generation. Annals of Operations Research,186(1), 465–490.

    Article  Google Scholar 

  • Myers, S. C. (1977). Determinants of corporate borrowing. Journal of Financial Economics,5(2), 147–175.

    Article  Google Scholar 

  • Myers, S. C., & Majd, S. (1983). Calculating abandonment value using option pricing theory. Massachusetts Institute of Technology (MIT), Sloan School of Management

  • Myers, S. C., & Majd, S. (2001). Abandonment value and project life. In Real options and investment under uncertainty: Classical readings and recent contributions (pp. 295–313). Cambridge.

  • Olsen, T. E., & Stensland, G. (1988). Optimal shutdown decisions in resource extraction. Economics Letters,26(3), 215–218.

    Article  Google Scholar 

  • Reuters (2015). BP says oil majors have axed 80 projects this year. http://uk.reuters.com/article/uk-bp-majors-projects/bp-says-oil-majors-have-axed-80-projects-this-year-idUKKCN0SZ0ML20151110. Accessed 2015-11-10.

  • Smith, J. E., & McCardle, K. F. (1998). Valuing oil properties: Integrating option pricing and decision analysis approaches. Operations Research,46(2), 198–217.

    Article  Google Scholar 

  • Tang, B.-J., Zhou, H.-L., Chen, H., Wang, K., & Cao, H. (2017). Investment opportunity in China’s overseas oil project: An empirical analysis based on real option approach. Energy Policy,105, 17–26.

    Article  Google Scholar 

  • Van Zee, R. D., & Spinler, S. (2014). Real option valuation of public sector R&D investments with a down-and-out barrier option. Technovation,34(8), 477–484.

    Article  Google Scholar 

  • Wei, Y.-M., & Zhou, S.-P. (2010). Risk assessment on oversea mineral resources exploration and utilization. Beijing: Geological Publishing House.

    Google Scholar 

  • Zhang, S. X., & Lu, N. (2006). The application of compound real option approach to the investment decision making in petroleum development. Statistics and Decision,09, 22–24.

    Google Scholar 

  • Zhang, X., Wang, X. W., Chen, J. J., Xie, X., Wang, K., & Wei, Y. M. (2014). A novel modeling based real option approach for CCS investment evaluation under multiple uncertainties. Applied Energy,113, 1059–1067.

    Article  Google Scholar 

  • Zhao, L. T., He, L. Y., Cheng, L., Zeng, G. R., & Huang, Z. M. (2018). The effect of gasoline consumption tax on consumption and carbon emissions during a period of low oil prices. Journal of Cleaner Production,171, 1429–1436.

    Article  Google Scholar 

Download references

Acknowledgements

We gratefully acknowledge the financial support from the National Natural Science Foundation of China (Grant Nos. 71573013, 71521002, 71642004), Special Items Fund for Cultivation and Development of Beijing Creative Base (Grant No. Z171100002217023), Key Project of Beijing Social Science Foundation Research Base (Grant No. 15DJA084), National Key R&D Program (Grant No. 2016YFA0602603) and Special Items Fund of Beijing Municipal Commission of Education.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Bao-Jun Tang.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zhou, HL., Tang, BJ. & Cao, H. Abandonment Decision-Making of Overseas Oilfield Project Coping with Low Oil Price. Comput Econ 55, 1171–1184 (2020). https://doi.org/10.1007/s10614-018-9837-2

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10614-018-9837-2

Keywords

Navigation