Skip to main content
Log in

Commissioning of the pion beam facility at SIS-GSF

  • Published:
Czechoslovak Journal of Physics Aims and scope

Abstract

A secondary pion beam facility has recently been installed and commissioned at the SIS-GSI (Darmstadt) 18Tm synchrotron. Pions are produced in the collision of light heavy-ion beams from the SIS onto a thick production target and transported to HADES experimental area. A system of three time-of-flight hodoscopes has been constructed and installed in the beam line to separate pions from other secondary particles. The main results of the commissioning experiment are presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. R. Novotny et al., IEEE Trans. Nucl. Sci. 38 (1991) 379.

    Article  Google Scholar 

  2. A. Gobbi et al., Nucl. Instr. and Meth. A 324 (1993) 156.

    Article  ADS  Google Scholar 

  3. P. Senger et al., Nucl. Instr. and Meth. A 327 (1993) 393.

    Article  ADS  Google Scholar 

  4. R. Schicker et al., Nucl. Instr. and Meth. A 380 (1996) 586.

    Article  ADS  Google Scholar 

  5. T. Blaich et al., Nucl. Instr. and Meth. A 314 (1992) 136.

    Article  ADS  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Additional information

Talk given at the Indian-Summer School on Relativistic Heavy-Ion Physics-RHIP'99, Prague (Czech Republic), August 30–September 3, 1999.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yahlali, N., Ardid, M., Díaz, J. et al. Commissioning of the pion beam facility at SIS-GSF. Czech J Phys 50 (Suppl 2), 140–145 (2000). https://doi.org/10.1007/s10582-000-0039-4

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10582-000-0039-4

Keywords

Navigation