Skip to main content
Log in

Power Schedule Optimization of the PIK Reactor to Accelerate Power Buildup During Startup

  • Published:
Atomic Energy Aims and scope

The possibility of accelerating power buildup in the PIK reactor during startup by optimizing the power schedule is investigated. The analysis concerns the neutronic aspects and takes into account xenon processes, fuel burnup, and limits on reactivity excess and reactor power. A numerical method based on the principle of optimality with reactor power as a control is used to solve the problem. It is shown for one of the power start-up phases of the PIK reactor that optimization of the power schedule makes it possible to accelerate the passage of the phase by 1/4 as compared with a four-step power schedule. The possibility of optimal passage of a portion of the phase in the self-regulation regime of the reactor is considered. It is established that this regime is unstable for the actual power range in practice.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. A. N. Erykalov, A. S. Zakharov, K. A. Konoplev, et al., Design of the Core and Refl ector of the PIK Reactor, Preprint PIYaF 2472 (2002).

  2. M. V. Kovalchuk, V. L. Aksenov, K. A. Konoplev, et al., Physical Startup of the PIK Reactor, Preprint PIYaF 2924 (2013).

  3. E. P. Churakov, Optimal and Adaptive Systems, Energoatomizdat, Moscow (1987).

  4. A. D. Galanin, Introduction to the Theory of Nuclear Reactors on Thermal Neutrons, Energoatomizdat, Moscow (1990).

  5. .A. D. Myshkis, Applied Mathematics for Engineers: Special Courses, Fizmatlit, Moscow (2007).

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to A. M. Degtyarev.

Additional information

Translated from Atomnaya Énergiya, Vol. 126, No. 3, pp. 144–149, March, 2019.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Degtyarev, A.M., Myasnikov, A.A., Trofimova, T.E. et al. Power Schedule Optimization of the PIK Reactor to Accelerate Power Buildup During Startup. At Energy 126, 163–168 (2019). https://doi.org/10.1007/s10512-019-00531-3

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10512-019-00531-3

Navigation