Skip to main content
Log in

Operational Efficiency Evaluation of a Setup for Removing Stresses in the Steam Header of PGV-1000 Steam Generator

  • Published:
Atomic Energy Aims and scope

The effectiveness of a setup for removing stresses in the steam header of a PGV-1000 steam generator is evaluated. The evaluation is based on an investigation of the stress state by means of magnetic anisotropy measurements performed in the zone of the No. 111 weld seam of the hot header of steam generators operating in one of the power-generating units with a V-320 series reactor arrangement. Inspections made it possible to obtain cartograms of the distribution of the difference of the principal mechanical stresses along the perimeter of the weld connection of a PGV-1000 header equipped with a cooling mantle and headers without such a mantle. By means of statistical analysis of the data, a diagram of the distribution of the principal mechanical stresses was obtained. In addition, the distribution of the standard deviation of the principal mechanical stresses as a measure of the dispersion of a random quantity relative to its mathematical expectation was determined.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. S. L. Lyakishev, V. V. Denisov, S. A. Kharchenko, and O. Yu. Petrova, “Analysis of the factors damaging to the headers of the steam generator PGV-1000M,” Vopr. At. Nauki Tekhn. Ser. Obesp. Bezopasn. AES, 19, 55–68 (2007).

    Google Scholar 

  2. A. P. Letunovskii, A. A. Antonov, and O. I. Steklov, “Removal of residual stresses by low-frequency vibratory treatment,” Zagotov. Proizv. Mashinostr., No. 8, 12–16 (2012).

  3. S. L. Lyakishev, Investigation of the Stress-Strain State and Modernization of the Design of the Coolant Header of a Steam Generator in NPP with VVER: Auth. Abstr. Dissert. Cand. Techn. Sci., Gidropress OKB, Podolsk (2011).

  4. A. K. Adamenkov, I. N. Veselova, and I. V. Malakhov, “Provision for monitoring thermomechanical stress load on the assembly for welding coolant header to a Dc 1200 pipe connection of PGV-1000 steam generators,” Global. Yad. Bezopasn., No. 4(17), 84–89 (2015).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Atomnaya Énergiya, Vol. 123, No. 2, pp. 79–81, August, 2017.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Adamenkov, A.K., Malakhov, I.V. & Veselova, I.N. Operational Efficiency Evaluation of a Setup for Removing Stresses in the Steam Header of PGV-1000 Steam Generator. At Energy 123, 93–95 (2017). https://doi.org/10.1007/s10512-017-0307-z

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10512-017-0307-z

Navigation