Skip to main content
Log in

Efficiency and Risk of Investments in Nuclear Power

  • Published:
Atomic Energy Aims and scope

It is shown that together with the reduced cost of electricity it is also necessary to examine other efficiency criteria for investments in NPP – the internal profitability norm and the discounted payback time of investments – and their impact on the primary profitability criterion of an NPP project – the pure discounted income. The analytical interconnection of the pure discounted income, internal profitability norm of a project, and the discounted payback time of investments, which is obtained using an exponential discounting function for the expected cash flows, is shown. The requirements of the engineering and economic parameters of NPP that make NPP competitive on the world market are formulated from an analysis of the interrelation of investment efficiency criteria. The NPP investment risk evaluated by the Monte Carlo method with prescribed uncertainty of prediction of cash flows during construction and operation of NPP is presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Economic Evaluation of Tender Proposals in Regard to Nuclear Power Plants, Techn. Reports Ser. No. 396, IAEA, Vienna (2000).

  2. Cost Estimating Guidelines for Generation IV Nuclear Energy Systems, Rev. 4.2. GIF/EMWG (2007).

  3. INPRO Methodology for Sustainability Assessment of Nuclear Energy Systems: Economics: INPRO Manual, Nuclear Energy Ser. NG-T-4.4, IAEA, Vienna (2014).

  4. Projected Costs of Generating Electricity, OECD/NEA (2015).

  5. T. Danilova, “NPP Economics: focus on kWh,” At. Ekspert, No. 5–6 (26–27), 9–15 (2014).

  6. V. V. Kharitonov and N. A. Molokanov, “Analytical model of the effi ciency of investment projects in the energy industry,” Ekon. Analiz: Tteor. Prakt., No. 16 (319), 38–51 (2013).

  7. V. V. Kharitonov and N. A. Molokanov, “Analytical model of a strategy for the self-development of nuclear power,” Ekon. Strategii, No. 5, 6–16 (2012); No. 6–7, 94–107 (2012).

  8. V. V. Kharitonov, The Dynamics of the Development of Nuclear Power: Economic and Analytical Models, MEPhI, Moscow (2014).

  9. W. Berens and M. Peter, Manual for the Preparation of Industrial Feasiblity Studies, UNIDO, Vienna (1991).

  10. W. Short, D. Packey, and T. Holt, A Manual for the Economic Evaluation of Energy Effi ciency and Renewable Energy Technologies, NREL/TP-462-5173 (1995).

    Google Scholar 

  11. Economic Analysis for the Paks II Nuclear Power Project: A Rational Investment Case for Hungarian State Resources, Rothschild (2015).

  12. Nuclear New Build: Insights into Financing and Project Management, OECD/NEA (2015).

  13. Ya. V. Shevelev and A. V. Klimenko, Effective Economics of the Nuclear Fuel and Energy Complex, Russian State Humanitarian Univ., Moscow (1996).

    Google Scholar 

  14. P. L. Vilenskii, V. N. Livshits, and S. S. Smolyak, Efficiency Evaluation of Investment Projects: Theory and Practice, Poly Print Servis, Moscow (2015), 5th ed.

  15. V. V. Kharitonov, Energy Production: Technical and Economic Basis, MIFI, Moscow (2007).

  16. INPRO Assessment of the Planned Nuclear Energy System of Belarus, TECDOC No. 1716, IAEA, Vienna (2013).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Atomnaya Énergiya, Vol. 122, No. 6, pp. 339–348, June, 2017.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Kharitonov, V.V., Bokov, A.V. & Kosterin, N.N. Efficiency and Risk of Investments in Nuclear Power. At Energy 122, 417–427 (2017). https://doi.org/10.1007/s10512-017-0289-x

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10512-017-0289-x

Navigation