Particulars of Risk Determination for Investments in NPP Construction Projects

  • Published:
Atomic Energy Aims and scope

An important element in making decisions about choosing a preferred NPP project is the evaluation of the economic risk associated with macroeconomic uncertainty. Different parameters can be used to classify the risks that must be taken into account when calculating the efficacy of building a NPP. They must be viewed as the quintessence of the general, investment, and project risks considered in conventional power generation projects as well as specialized risks inherent in nuclear power. A method of cumulative quantitative determination of the risks of such projects based on global experience is presented here. It can improve the existing approaches to the calculation of the main economic indices of NPP construction projects.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. World Energy Outlook 2011, IEA, Paris (2011).

  2. N. A. Artemova and V. V. Kharitonov, “Evaluation of the competitiveness of NPP projects on the world market,” Ekonom. Strategii, No. 7–8, 2–11 (2010).

  3. A. N. Karkhov, “Methods of evaluating the efficiency of innovative projects in power generation,” At. Énerg., 107, No. 6, 303–307 (2009).

    Article  Google Scholar 

  4. A. N. Karkhov, “Economic efficiency of innovations in power generation,” At. Énerg., 111, No. 3, 174–177 (2009).

    Google Scholar 

  5. A. I. Guseva and N. S. Shcherbakova, “Effective control of money at atomic-industry enterprises,” Ekonom. Analiz: Teor. Prakt., No. 7(262), 18–24 (2012).

  6. L. K. Osika, “Systemic risk in controlling construction projects for thermal power plants,” Energorynok, No. 4, 18–24 (2012).

  7. S. A. Smolyak, “On the discount rate for evaluating the efficiency of investment projects in the presence of risk,” Audit Fin. Analiz, No. 2, 48–56 (2000).

  8. Global Project Finance Yearbook 2006, Standard & Poor’s, New York (2005).

  9. Business Risks in Private-Public Partnership, Assots. Menedzherov, Moscow (2007).

  10. N. G. Piskunova, “Country risk and methods of evaluating it,” Mezhdunar. Bank. Oper., No. 2, 32–38 (2008).

Download references

Author information

Authors and Affiliations

Authors

Additional information

Translated from Atomnaya Énergiya, Vol. 115, No. 3, pp. 170–176, September, 2013.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Koptelov, M.V., Guseva, A.I. Particulars of Risk Determination for Investments in NPP Construction Projects. At Energy 115, 207–213 (2014). https://doi.org/10.1007/s10512-013-9773-0

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10512-013-9773-0

Keywords

Navigation