An important element in making decisions about choosing a preferred NPP project is the evaluation of the economic risk associated with macroeconomic uncertainty. Different parameters can be used to classify the risks that must be taken into account when calculating the efficacy of building a NPP. They must be viewed as the quintessence of the general, investment, and project risks considered in conventional power generation projects as well as specialized risks inherent in nuclear power. A method of cumulative quantitative determination of the risks of such projects based on global experience is presented here. It can improve the existing approaches to the calculation of the main economic indices of NPP construction projects.
Similar content being viewed by others
References
World Energy Outlook 2011, IEA, Paris (2011).
N. A. Artemova and V. V. Kharitonov, “Evaluation of the competitiveness of NPP projects on the world market,” Ekonom. Strategii, No. 7–8, 2–11 (2010).
A. N. Karkhov, “Methods of evaluating the efficiency of innovative projects in power generation,” At. Énerg., 107, No. 6, 303–307 (2009).
A. N. Karkhov, “Economic efficiency of innovations in power generation,” At. Énerg., 111, No. 3, 174–177 (2009).
A. I. Guseva and N. S. Shcherbakova, “Effective control of money at atomic-industry enterprises,” Ekonom. Analiz: Teor. Prakt., No. 7(262), 18–24 (2012).
L. K. Osika, “Systemic risk in controlling construction projects for thermal power plants,” Energorynok, No. 4, 18–24 (2012).
S. A. Smolyak, “On the discount rate for evaluating the efficiency of investment projects in the presence of risk,” Audit Fin. Analiz, No. 2, 48–56 (2000).
Global Project Finance Yearbook 2006, Standard & Poor’s, New York (2005).
Business Risks in Private-Public Partnership, Assots. Menedzherov, Moscow (2007).
N. G. Piskunova, “Country risk and methods of evaluating it,” Mezhdunar. Bank. Oper., No. 2, 32–38 (2008).
Author information
Authors and Affiliations
Additional information
Translated from Atomnaya Énergiya, Vol. 115, No. 3, pp. 170–176, September, 2013.
Rights and permissions
About this article
Cite this article
Koptelov, M.V., Guseva, A.I. Particulars of Risk Determination for Investments in NPP Construction Projects. At Energy 115, 207–213 (2014). https://doi.org/10.1007/s10512-013-9773-0
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10512-013-9773-0