Experience in operating and upgrading the No. 5 unit of the Novovoronezh nuclear power plant – practical base for developing a reliable source of nuclear energy

  • Published:
Atomic Energy Aims and scope

The No. 5 unit of the Novovoronezh nuclear power plant, starting commercial operations on September 26, 1980, is the first power-generating unit with a 1000 MW VVER in our country. The assimilation of its power gave invaluable experience to designers, builders, and equipment manufacturers; this experience was taken into account in the design solutions for next-generation power-generating units. A large volume of work on increasing the efficiency, reliability, and safety was performed over a 30-year service life. At present, the power-generating unit has been shut down for a major overhaul for upgrading according a program for extending the service life by 25–30 years.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Additional information

Dedicated to the 30th anniversary of the startup of the first power-generating unit of a nuclear power plant with VVER-1000.

Translated from Atomnaya Énergiya, Vol. 109, No. 5, pp. 262–267, November, 2010.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Vitkovskii, I.L. Experience in operating and upgrading the No. 5 unit of the Novovoronezh nuclear power plant – practical base for developing a reliable source of nuclear energy. At Energy 109, 321–327 (2011). https://doi.org/10.1007/s10512-011-9362-z

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10512-011-9362-z

Keywords

Navigation