Skip to main content

Advertisement

Log in

Construction, operation, and operating lifetime extension of the steam generators of a BN-600 power-generating unit

  • Published:
Atomic Energy Aims and scope

Abstract

The construction of the PGN-200M steam generator of a BN-600 power-generating unit at the Beloyarskaya nuclear power plant is described. Data from 25 years of operation are presented and the basic questions which were solved during the startup-adjustment work, which increased the operational reliability of the steam generator, are elucidated. The advantages of steam generators with different designs are compared, and it is concluded that it is desirable to develop a high-power sodium-cooled vessel steam generator for future facilities.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

Authors

Additional information

__________

Translated from Atomnaya Énergiya, Vol. 99, No. 6, pp. 481–488, December, 2005.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Denisov, V.V., Karsonov, V.I. & Trunov, N.B. Construction, operation, and operating lifetime extension of the steam generators of a BN-600 power-generating unit. At Energy 99, 917–923 (2005). https://doi.org/10.1007/s10512-006-0040-5

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10512-006-0040-5

Keywords

Navigation