Abstract
The construction of the PGN-200M steam generator of a BN-600 power-generating unit at the Beloyarskaya nuclear power plant is described. Data from 25 years of operation are presented and the basic questions which were solved during the startup-adjustment work, which increased the operational reliability of the steam generator, are elucidated. The advantages of steam generators with different designs are compared, and it is concluded that it is desirable to develop a high-power sodium-cooled vessel steam generator for future facilities.
Similar content being viewed by others
Additional information
__________
Translated from Atomnaya Énergiya, Vol. 99, No. 6, pp. 481–488, December, 2005.
Rights and permissions
About this article
Cite this article
Denisov, V.V., Karsonov, V.I. & Trunov, N.B. Construction, operation, and operating lifetime extension of the steam generators of a BN-600 power-generating unit. At Energy 99, 917–923 (2005). https://doi.org/10.1007/s10512-006-0040-5
Issue Date:
DOI: https://doi.org/10.1007/s10512-006-0040-5