Skip to main content
Account

Table 1 Summary of existing economic modeling on transport facility adaptation

From: Climate change adaptation projects of transport facilities: is a demonstrator necessary?

Research

Disaster uncertainty

Investment period

Information

Regulation instruments

Demand uncertainty

Xiao et al. (2015)

Uniform distribution

two-period

Perfect

NA

Certain

Wang and Zhang (2018)

Knightian uncertainty, Symmetric

single period

Perfect

NA

Certain

Randrianarisoa and Zhang (2019)

Knightian uncertainty

two periods

Perfect

NA

Certain

Wang et al. (2020)

Knightian uncertainty, Symmetric/Asymmetric

single period

Perfect

NA

Certain

Gong et al. (2020)

Bernoulli distribution

Single period

Perfect

NA

Stochastic

Jiang et al. (2020)

Random distribution

Single period

Perfect

NA

Certain

Xia and Lindsey (2021)

Random distribution

two periods

Perfect

NA

Certain

Zheng et al. (2021a)

Knightian uncertainty, Symmetric

Single period

Perfect

Subsidy vs. Minimum requirement

Certain

Zheng et al. (2021b)

Bernoulli distribution, Asymmetric between infrastructures

Single period

Perfect

Adaptive capacity sharing vs. subsidy

Certain

Zheng et al. (2022a)

Knightian uncertainty

Single period

Incomplete (government vs. transport facility operator)

Subsidy

Certain

Zheng et al. (2022b)

Bernoulli distribution

Single period

Incomplete (between two transport facility operators)

Information sharing vs. subsidy

Certain

Zheng et al. (2023)

Bernoulli distribution

Single period

Incomplete (government vs. transport facility operator)

Bayesian persuasion

Certain

The current study

Random distribution

Multi-period

Perfect

Subsidy to set up demonstrator project

Stochastic (static vs. time-varying)