Framework for sustainable maintenance system: ISM–fuzzy MICMAC and TOPSIS approach

  • Rajesh Kumar SinghEmail author
  • Ayush Gupta
S.I.: SOME
  • 148 Downloads

Abstract

Due to the increasing complexity of manufacturing processes and automation, maintenance of all machines and equipments has become challenging task for production managers today. Due to lack of sensitivity for maintenance, share of maintenance cost in total product cost is also increasing along with decreased productivity. Organizations are either quite slow or getting failed in updating their maintenance systems with time. Keeping in view the importance of maintenance in today’s context, this study has tried to develop a framework for a sustainable maintenance system for manufacturing organizations. Usually organizations are not able to identify critical factors for effective maintenance. Therefore, in this context, the study has identified fourteen factors for the effective maintenance management from the literature review. Some of these factors are process oriented and some are result oriented. Interpretive structural modeling approach is applied for the development of structural relationship among the factors from a strategic perspective. Fuzzy MICMAC analysis is then carried out to categorize these factors based on their driving and dependence value. Further to prioritise major driving factors, Technique for order preferences by similarity of an ideal solution approach has been also applied. It is observed that top management support and commitment, strategic planning and implementation, continuous upgradation of maintenance system to reduce manufacturing lead time and cost are major factors to ensure the sustainable competitive advantage.

Keywords

Maintenance management Sustainability Productivity Manufacturing strategy Fuzzy methods 

Notes

Acknowledgements

Authors are grateful to the Editor of the journal and reviewers for giving valuable suggestions to improve the quality and content of this research paper.

References

  1. Abreu, J., Martins, P. V., Fernandes, S., & Zacarias, M. (2013). Business processes improvement on maintenance management: A case study. Procedia Technology, 9, 320–330.CrossRefGoogle Scholar
  2. Bartz, T., Cezar Mairesse Siluk, J., & Paula Barth Bartz, A. (2014). Improvement of industrial performance with TPM implementation. Journal of Quality in Maintenance Engineering, 20(1), 2–19.  https://doi.org/10.1108/jqme-07-2012-0025.CrossRefGoogle Scholar
  3. Block, J., Ahmadi, A., Tyrberg, T., & Söderholm, P. (2014). Part-out-based spares provisioning management: A military aviation maintenance case study. Journal of Quality in Maintenance Engineering, 20(1), 76–95.CrossRefGoogle Scholar
  4. Bottani, E., Ferretti, G., Montanari, R., & Vignali, G. (2014). An empirical study on the relationships between maintenance policies and approaches among Italian companies. Journal of Quality in Maintenance Engineering, 20(2), 135–162.CrossRefGoogle Scholar
  5. Bouslah, B., Gharbi, A., & Pellerin, R. (2016). Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraints. Omega, 61, 110–126.CrossRefGoogle Scholar
  6. Casey, D., & Murphy, K. (2009). Issues in using methodological triangulation in research. Nurse Researcher, 16(4), 40–55.CrossRefGoogle Scholar
  7. El-Akruti, K., Zhang, T., & Dwight, R. (2016). Developing an optimum maintenance policy by life cycle cost analysis—A case study. International Journal of Production Research, 54, 1–17.CrossRefGoogle Scholar
  8. Everett, C. (2002). Penn states commitment to quality improvement. Quality Progress, 35(1), 44–49.Google Scholar
  9. Foss, C., & Ellefsen, B. (2002). The value of combining qualitative and quantitative approaches in nursing research by means of method triangulation. Journal of Advanced Nursing, 40(2), 242–248.CrossRefGoogle Scholar
  10. Gosavi, A., Murray, S. L., Tirumalasetty, V. M., & Shewade, S. (2011). A budget- sensitive approach to scheduling maintenance in a total productive maintenance (TPM) program. Engineering Management Journal, 23(3), 46–56.CrossRefGoogle Scholar
  11. Graham, N. K., Arthur, Y. D., & Mensah, D. P. (2014). Managerial role in ensuring successful total quality management programme in Ghanaian printing firms. The TQM Journal, 26(5), 398–410.CrossRefGoogle Scholar
  12. Gustafson, A., Schunnesson, H., Galar, D., & Kumar, U. (2013). Production and maintenance performance analysis: manual versus semi-automatic LHDs. Journal of Quality in Maintenance Engineering, 19(1), 74–88.CrossRefGoogle Scholar
  13. Haavisto, I., & Goentzel, J. (2015). Measuring humanitarian supply chain performance in a multi-goal context. Journal of Humanitarian Logistics and Supply Chain Management, 5(3), 300–332.CrossRefGoogle Scholar
  14. Halcomb, E., & Andrew, S. (2005). Triangulation as a method for contemporary nursing research. Nurse Researcher, 13(2), 71–82.Google Scholar
  15. Harrington, H. J. (1987). The improvement process: How America’s leading companies improve quality. New York, NY: McGraw-Hill Book Company.Google Scholar
  16. Hassini, S. B., Tayeb, F. B., Marmier, F., & Rabahi, M. (2015). Considering human resource constraints for real joint production and maintenance schedules. Computers & Industrial Engineering, 90, 197–210.CrossRefGoogle Scholar
  17. Hwang, C. L., & Yoon, K. (1981). Multiple attributes decision making methods and applications. Berlin: Springer.CrossRefGoogle Scholar
  18. Khatwani, G., Singh, S. P., Trivedi, A., & Chauhan, A. (2015). Fuzzy-TISM: A fuzzy extension of TISM for group decision making. Global Journal of Flexible System Management, 16(1), 97–112.CrossRefGoogle Scholar
  19. Kigsirisin, S., Pussawiro, S., & Noohawm, O. (2016). Approach for total productive maintenance evaluation in water productivity: A case study at Mahasawat water treatment plant. Procedia Engineering, 154, 260–267.CrossRefGoogle Scholar
  20. Komonen, K. (2002). A cost model of industrial maintenance for profitability analysis and benchmarking. International Journal of Production Economics, 79, 15–31.CrossRefGoogle Scholar
  21. Korpela, J., & Tuominen, M. (1996). A decision support system for strategic issues management of logistics. International Journal of Production Economics, 46, 605–620.CrossRefGoogle Scholar
  22. Kumar, U., Galar, D., Parida, A., Stenström, C., & Berges, L. (2013). Maintenance performance metrics: a state-of-the-art review. Journal of Quality in Maintenance Engineering, 19(3), 233–277.CrossRefGoogle Scholar
  23. Kumar, R., Singh, R. K., & Shankar, R. (2015). Critical success factors for implementation of supply chain management in Indian small and medium enterprises and their impact on performance. IIMB Management Review, 27(2), 92–104.CrossRefGoogle Scholar
  24. Kumar, J., Soni, V. K., & Agnihotri, G. (2014). Impact of TPM implementation on Indian manufacturing industry. International Journal of Productivity and Performance Management, 63(1), 44–56.CrossRefGoogle Scholar
  25. Lin, X. J., Lin, Q., & Zhang, G. N. (2015). Effectivity of total productive maintenance (TPM) in large size organizations—A case study in Shandong Lingong. Applied Mechanics and Materials, 701, 1249–1252.Google Scholar
  26. Lorén, S., & Maré, J. D. (2015). Maintenance for reliability—A case study. Annals of Operations Research, 224(1), 111–119.CrossRefGoogle Scholar
  27. Lotfi, F. H., Marbini, A. H., Agrell, P. J., Aghayi, N., & Gholami, K. (2013). Allocating fixed resources and setting targets using a common-weights DEA approach. Computers & Industrial Engineering, 64, 631–640.CrossRefGoogle Scholar
  28. Lu, Z., Cui, W., & Han, X. (2015). Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty. Computers & Industrial Engineering, 80, 236–244.CrossRefGoogle Scholar
  29. Macchi, M., & Fumagalli, L. (2013). A maintenance maturity assessment method for the manufacturing industry. Journal of Quality in Maintenance Engineering, 19(3), 295–315.CrossRefGoogle Scholar
  30. Maletič, D., Maletič, M., & Gomišček, B. (2012). The relationship between continuous improvement and maintenance performance. Journal of Quality in Maintenance Engineering, 18(1), 30–41.CrossRefGoogle Scholar
  31. Mangano, G., & Marco, A. D. (2014). The role of maintenance and facility management in logistics: A literature review. Facilities, 32(5/6), 241–255.CrossRefGoogle Scholar
  32. Mosadeghrad, A. M. (2014). Why TQM programmes fail? A pathology approach. The TQM Journal, 26(2), 160–187.CrossRefGoogle Scholar
  33. Mwanza, B. G., & Mbohwa, C. (2015). Design of a total productive maintenance model for effective implementation: Case study of a chemical manufacturing company. Procedia Manufacturing, 4, 461–470.CrossRefGoogle Scholar
  34. Narayan, V. (2012). Business performance and maintenance. Journal of Quality in Maintenance Engineering, 18(2), 183–195.CrossRefGoogle Scholar
  35. Noroozi, A., Khakzad, N., Khan, F., MacKinnon, S., & Abbassi, R. (2013). The role of human error in risk analysis: Application to pre-and post-maintenance procedures of process facilities. Reliability Engineering & System Safety, 119, 251–258.CrossRefGoogle Scholar
  36. Parida, A., Kumar, U., Galar, D., & Stenström, C. (2015). Performance measurement and management for maintenance: A literature review. Journal of Quality in Maintenance Engineering, 21(1), 2–33.CrossRefGoogle Scholar
  37. Pettit, S., & Beresford, A. (2009). Critical success factors in the context of humanitarian aid supply chains. International Journal of Physical Distribution & Logistics Management, 39(6), 450–468.CrossRefGoogle Scholar
  38. Poduval, P. S., Pramod, V. R., & Jagathy Raj, V. P. (2015). Interpretive structural modeling (ISM) and its application in analyzing factors inhibiting implementation of total productive maintenance (TPM). International Journal of Quality & Reliability Management, 32(3), 308–331.CrossRefGoogle Scholar
  39. Rafiq, M. (2015). Structural health monitoring for maintenance management of deteriorating structures: Current practice and state of the art. In 2nd International and 6th national conference on earthquake structures, Kerman, Iran.Google Scholar
  40. Shaaban, M. S., & Awni, A. H. (2014). Critical success factors for total productive manufacturing (TPM) deployment at Egyptian FMCG companies. Journal of Manufacturing Technology Management, 25(3), 393–414.CrossRefGoogle Scholar
  41. Sharma, R., & Trikha, V. (2011). TPM implementation in piston manufacturing industry for OEE. Current Trends in Engineering Research, 1(1), 122–129.Google Scholar
  42. Simões, J. M., Gomes, C. F., & Yasin, M. M. (2016). Changing role of maintenance in business organisations: Measurement versus strategic orientation. International Journal of Production Research, 54(11), 3329–3346.CrossRefGoogle Scholar
  43. Singh, R. K. (2011). Analyzing the interaction of factors for success of total quality management in SMEs. Asian Journal on Quality, 12(1), 6–19.CrossRefGoogle Scholar
  44. Singh, R. K. (2015). Modelling of critical factors for responsiveness in supply chain. Journal of Manufacturing Technology Management, 26(6), 868–888.CrossRefGoogle Scholar
  45. Singh, A. S., Atre, R., Vardia, A., Gupta, V. D., & Sebastian, B. (2013a). Indigenous development amongst challenges: Munjal Showa Limited and the implementation of total productive maintenance. International Journal of Productivity and Performance Management, 62(3), 323–338.CrossRefGoogle Scholar
  46. Singh, R., Gohil, A. M., Shah, D. B., & Desai, S. (2013b). Total productive maintenance (TPM) implementation in a machine shop: A case study. Procedia Engineering, 51, 592–599.CrossRefGoogle Scholar
  47. Singh, R. K., Gunasekaran, A., & Kumar, P. (2017). Third party logistics (3PL) selection for cold chain management: A fuzzy AHP and fuzzy TOPSIS approach. Annals of Operations Research, 267, 1–23.Google Scholar
  48. Singh, R. K., Gupta, A., & Gunasekaran, A. (2018). Analysing the interaction of factors for resilient humanitarian supply chain. International Journal of Production Research, 56, 1–19.CrossRefGoogle Scholar
  49. Singh, R. K., Gupta, A., Kumar, A., & Khan, T. A. (2016). Ranking of barriers for effective maintenance by using TOPSIS approach. Journal of Quality in Maintenance Engineering, 22(1), 18–34.CrossRefGoogle Scholar
  50. Singh, R. K., & Sharma, M. K. (2014). Prioritizing the alternatives for flexibility in supply chains. Production Planning and Control, 25(2), 176–192.CrossRefGoogle Scholar
  51. Singh, R. K., & Sharma, M. K. (2015). Selecting competitive supply chain using Fuzzy-AHP and Extent analysis. Journal of Industrial and Production Engineering, 31(8), 524–538.CrossRefGoogle Scholar
  52. Tyagi, S., Choudhary, A., Cai, X., & Yang, K. (2015). Value stream mapping to reduce the lead-time of a product development process. International Journal of Production Economics, 160, 202–212.CrossRefGoogle Scholar
  53. Uzun, A., & Ozdogan, A. (2012). Maintenance parameters based production policies optimization. Journal of Quality in Maintenance Engineering, 18(3), 295–310.CrossRefGoogle Scholar
  54. Van Horenbeek, A., Pintelon, L., & Muchiri, P. (2010). Maintenance optimization models and criteria. International Journal of System Assurance Engineering and Management, 1(3), 189–200.CrossRefGoogle Scholar
  55. Vinodh, S., Ramesh, K., & Arun, C. S. (2016). Application of interpretive structural modelling for analysing the factors influencing integrated lean sustainable system. Clean Technologies and Environmental Policy, 18(2), 413–428.CrossRefGoogle Scholar
  56. Wakjira, M. W., & Singh, A. P. (2012). Total productive maintenance: A case study in manufacturing industry. Global Journal of Research in Engineering, 12(1-G), 24–32.Google Scholar
  57. World Development Indicators. (2013). Manufacturing, value added (% of gdp). Retrieved from http://data.worldbank.org/products/wdi. Accessed 21 Sept 2016.
  58. Wu, B., Tian, Z., & Chen, M. (2013). Condition-based maintenance optimization using neural network-based health condition prediction. Quality and Reliability Engineering International, 29(8), 1151–1163.CrossRefGoogle Scholar
  59. Yan, J. (2015). Machinery prognostics and prognosis oriented maintenance management. Hoboken: Wiley.Google Scholar
  60. Yunis, M., Jung, J., & Chen, S. (2013). TQM, strategy, and performance: A firm-level analysis. International Journal of Quality & Reliability Management, 30(6), 690–714.CrossRefGoogle Scholar
  61. Zadeh, L. (1965). Fuzzy sets. Information and Control, 8(3), 338–353.CrossRefGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC, part of Springer Nature 2019

Authors and Affiliations

  1. 1.Management Development InstituteGurgaonIndia
  2. 2.Indian Institute of ManagementAhmedabadIndia

Personalised recommendations