Advertisement

Annals of Operations Research

, Volume 264, Issue 1–2, pp 545–545 | Cite as

Correction to: Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources

  • Zdeněk Hanzálek
  • Přemysl Šůcha
Correction
  • 276 Downloads

1 Correction to: Ann Oper Res (2017) 248:209–237  https://doi.org/10.1007/s10479-016-2184-6

Due to some technical issues with article HTML, Algorithm 1 appeared twice and there was no ILP formulation.

Algorithm 1 at the first occurrence should be replaced with ILP formulation.

Copyright information

© Springer Science+Business Media, LLC 2017

Authors and Affiliations

  1. 1.Faculty of Electrical Engineering and Czech Institute of Informatics, Robotics and CyberneticsCzech Technical University in PraguePrague 6Czech Republic
  2. 2.Department of Control Engineering, Faculty of Electrical EngineeringCzech Technical University in PraguePrague 6Czech Republic

Personalised recommendations