Fuzzy-probabilistic PERT

  • CLAIO 2014
  • Published:
Annals of Operations Research Aims and scope Submit manuscript

Abstract

Using PERT (Program evaluation and review technique), one assumes that the time required to carry out the individual tasks in a project can be approximated using a beta distribution. It is assumed that the parameters of these distributions (the minimum, maximum and most likely times) are estimated by experts in accordance with the properties of the beta distribution. However, this is not always the case. This article shows how one may analyse the time required to carry out a task. Two approaches to describing uncertainty regarding the duration of tasks are used: probabilistic and fuzzy. This article proposes a mixture of a beta probability distribution with a generative probability distribution to describe the duration of a task. An illustrative examples are given.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

Similar content being viewed by others

References

  • Abdelkader, Y. H. (2004). Evaluating project completion times when activity times are Weibull distribution. European Journal of Operational Research, 157, 704–715.

    Article  Google Scholar 

  • Abdelkader, Y. H. (2010). Adjustment of the moments of the project completion times when activity times are exponentially distributed. Annals of Operations Research, 181, 503–514.

    Article  Google Scholar 

  • Chen, C. T., & Huang, S. F. (2007). Applying fuzzy method for measuring criticality in project network. Information Sciences, 177, 2448–2458.

    Article  Google Scholar 

  • Chen, S. P., & Hsueh, Y. J. (2008). A simple approach to fuzzy critical path analysis in project networks. Applied Mathematical Modelling, 32, 1289–1927.

    Article  Google Scholar 

  • Chanas, S., & Nowakowski, M. (1988). Single value simulation of fuzzy variable. Fuzzy Sets and Systems, 25, 43–57.

    Article  Google Scholar 

  • Chrysafis, K. A., & Papadopoulos, B. K. (2015). Possibilistic moments for the task duration in fuzzy PERT. Journal of Management in Engineering, 31(5), 04014071.

    Article  Google Scholar 

  • Chrysafis, K. A., & Papadopoulos, B. K. (2014). Approaching activity duration in PERT by means of fuzzy sets theory and statistics. Journal of Intelligent and Fuzzy Systems, 26(2), 577–587.

    Google Scholar 

  • Chrysafis, K. A., Panagiotakopoulos, D., & Papadopoulos, B. K. (2013). Hybrid (fuzzy-stochastic) Modelling in Construction Operations Management. International Journal of Machine Learning & Cybernetics, 4(4), 339–346.

    Article  Google Scholar 

  • Dubois, D., Fortin, J., & Zieliński, P. (2010). Interval PERT and its fuzzy extension. In C. Kahraman & M. Yavuz (Eds.), Production engineering and management under fuzziness. Studies in fuzziness and soft computing (Vol. 252, pp. 171–199). Berlin: Springer.

  • Dubois, D., & Prade, H. (1988). Possibility theory: An approach to computerized processing of uncertainty: Plenum Press.

  • Gallagher, C. (1987). A note on PERT assumptions. Management Science, 33, 1360–1360.

    Article  Google Scholar 

  • Gan, L., & Xu, J. (2015). Control risk for multimode resource-constrained project scheduling problem under hybrid uncertainty. Journal of Management in Engineering, 31(3), 1–16. doi:10.1061/(ASCE)ME.1943-5479.0000243.

  • Garcia, C. B. G., Perez, J. G., & Rambaud, S. C. (2010). Proposal of new distribution in PERT methodology. Annals of Operations Research, 181, 515–538.

    Article  Google Scholar 

  • Gładysz, B. (2014) Mixtures of fuzzy variables in the analysis of a project’s duration a robust approach. Proceedings of XIII Conference Polish Operational and Systems Research Society: Advances and Experiences, Warsaw, 24-26.09.2014, IBS, Warsaw, 1--7

  • Golenko, D. I. (1989). A new approach to the activity-time distribution in PERT. Journal of Operational Research Society, 40, 389–393.

    Article  Google Scholar 

  • Grubbs, F. (1962). Attempts to validate PERT statistics or picking on PERT. Operations Research, 10, 912–915.

    Article  Google Scholar 

  • Hahn, E. (2008). Mixture densities for project management activity times: A robust approach to PERT. European Journal of Operational Research, 210, 450–459.

    Article  Google Scholar 

  • Herreras-Velasco, J., Herreras-Pleguezuelo, R., & Dorp, J. (2011). Revisiting the PERT mean and variance. European Journal of Operational Research, 210(2), 448–454.

    Article  Google Scholar 

  • Kamburowski, J. (1997). New validation of PERT times. Omega The International Journal of Management Science, 25(3), 323–328.

    Article  Google Scholar 

  • Magott, J., & Skudlarski, K. (1993). Estimating the mean completion time of PERT networks with exponentially distributed duration of activities. European Journal of Operational Research, 71(1), 70–79.

    Article  Google Scholar 

  • Malcolm, D., Rosenboom, J., Clark, C., & Fazar, W. (1959). Application of a technique for research and development program evaluation. Operations Research, 7, 646–669.

    Article  Google Scholar 

  • Pour, N., Kheranmand, M., Fallah, M., & Zeynali, S. (2011). A new method for critical path method with fuzzy processing time. Management Sciences Letters, 1, 347–354.

    Article  Google Scholar 

  • Shankar, N., Sireesha, V., & Rao, B. (2010). An analytical method for finding critical path in a fuzzy project network. International Journal of Contemporary Mathematical Sciences, 5(20), 953–962.

    Google Scholar 

  • Zadeh, L. (1968). Probability measures of fuzzy events. Journal of Mathematical Analysis and Applications, 23, 421–427.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Barbara Gładysz.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Gładysz, B. Fuzzy-probabilistic PERT. Ann Oper Res 258, 437–452 (2017). https://doi.org/10.1007/s10479-016-2315-0

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10479-016-2315-0

Keywords

Navigation