The impacts of private risk aversion magnitude and moral hazard in R&D project under uncertain environment

  • Yiping Fu
  • Zhihua Chen
  • Yanfei Lan
Focus
  • 134 Downloads

Abstract

The R&D project manager tends to misreport risk aversion magnitude and shirk under uncertain environment for acquiring information rent and risk premium, which brings a significant challenge for the firm when designing compensation contracts. We consider an agency problem where a firm employs a manager who has private information about his risk aversion magnitude and unobservable efforts to implement a R&D project through a menu of incentive contracts. Both the subjective assessments about the risk aversion degree and the project variability are characterized as uncertain variables. Within the framework of uncertainty theory and principal-agent theory, we investigate the impacts of information asymmetry on the optimal compensation contracts and the firm’s profits under four information structures. We demonstrate that, counterintuitive as it sounds, the manager’s optimal contract under full information is the same as that under pure adverse selection. Nevertheless, compared to the case under full information, the firm should distort the commission rate upwards under pure moral hazard and dual asymmetric information. We also show that when the manager’s efforts are observable, hidden information about the risk aversion magnitude has no effect on the firm’s profit. However, when unobservable, private risk aversion degree always brings about information rent and induces a loss for the firm’s profit. Finally, our study provides managerial recommendations on mitigating the adverse impacts caused by asymmetric information.

Keywords

Uncertainty theory Incentive contract New product development Information asymmetry 

Notes

Acknowledgements

This work was supported by the National Natural Science Foundation of China (Grant Nos. 71771166 and 71771165).

Compliance with ethical standards

Conflict of interest

The authors declare that they have no conflict of interest.

Ethical approval

This article does not contain any studies with human participants or animals performed by any of the authors.

References

  1. Armstrong CS, Larcker DF, Su CL (2010) Endogenous selection and moral hazard in compensation contracts. Oper Res 58(4):1090–1106MathSciNetCrossRefMATHGoogle Scholar
  2. Bergmann R, Friedl G (2008) Controlling innovative projects with moral hazard and asymmetric information. Res Policy 37(9):1504–1514CrossRefGoogle Scholar
  3. Bhattacharya S, Gaba V, Hasija S (2014) A comparison of milestone-based and buyout options contracts for coordinating R&D partnerships. Manag Sci 61(5):963–978CrossRefGoogle Scholar
  4. Brown DC, Davies SW (2017) Moral hazard in active asset management. J Financ Econ 125(2):311–325CrossRefGoogle Scholar
  5. Bubshait AA (2003) Incentive/disincentive contracts and its effects on industrial projects. Int J Proj Manag 21(1):63–70CrossRefGoogle Scholar
  6. Chao RO, Lichtendahl KC, Grushka-Cockayne Y (2014) Incentives in a stage-gate process. Prod Oper Manag 23(8):1286–1298CrossRefGoogle Scholar
  7. Chen YJ (2013) Risk-incentives trade-off and outside options. OR Spectrum 35(4):937–956MathSciNetCrossRefMATHGoogle Scholar
  8. Chen Z, Lan Y, Zhao R (2016) Impacts of risk attitude and outside option on compensation contracts under different information structures. Fuzzy Optim Decis Mak.  https://doi.org/10.1007/s10700-016-9263-7 Google Scholar
  9. Crama P, De Reyck B, Degraeve Z (2013) Step by step. The benefits of stage-based R&D licensing contracts. Eur J Oper Res 224(3):572–582MathSciNetCrossRefMATHGoogle Scholar
  10. Crama P, De Reyck B, Taneri N (2016) Licensing contracts: control rights, options, and timing. Manag Sci 63(4):1131–1149CrossRefGoogle Scholar
  11. Dai Y, Chao X (2013) Salesforce contract design and inventory planning with asymmetric risk-averse sales agents. Oper Res Lett 41(1):86–91MathSciNetCrossRefMATHGoogle Scholar
  12. Dutta S (2003) Capital budgeting and managerial compensation: incentive and retention effects. Account Rev 78(1):71–93CrossRefGoogle Scholar
  13. He Z, Li S, Wei B, Yu J (2013) Uncertainty, risk, and incentives: theory and evidence. Manag Sci 60(1):206–226CrossRefGoogle Scholar
  14. Holmstrom B (1979) Moral hazard and observability. ACA Trans 10(1):74–91Google Scholar
  15. Holmstrom B (1982) Moral hazard in teams. ACA Trans 13(2):324–340Google Scholar
  16. Huang H, Shen X, Xu H (2016) Procurement contracts in the presence of endogenous disruption risk. Decis Sci 47(3):437–472CrossRefGoogle Scholar
  17. Li X, Qin Z (2014) Interval portfolio selection models within the framework of uncertainty theory. Econ Model 41:338–344CrossRefGoogle Scholar
  18. Liu B (2007) Uncertainty theory. Springer, BerlinCrossRefMATHGoogle Scholar
  19. Liu B (2013) Extreme value theorems of uncertain process with application to insurance risk model. Soft Comput 17(4):549–556CrossRefMATHGoogle Scholar
  20. Liu Y, Chen X, Ralescu DA (2015) Uncertain currency model and currency option pricing. Int J Intell Syst 30(1):40–51CrossRefGoogle Scholar
  21. Manso G (2011) Motivating innovation. J Financ 66(5):1823–1860CrossRefGoogle Scholar
  22. Mihm J (2010) Incentives in new product development projects and the role of target costing. Manag Sci 56(8):1324–1344CrossRefGoogle Scholar
  23. Mu R, Lan Y, Tang W (2013) An uncertain contract model for rural migrant worker’s employment problems. Fuzzy Optim Decis Mak 12(1):29–39MathSciNetCrossRefGoogle Scholar
  24. Rahmani M, Roels G, Karmarkar US (2017) Collaborative work dynamics in projects with co-production. Prod Oper Manag 26(4):686–703CrossRefGoogle Scholar
  25. Taneri N, De Meyer A (2017) Contract theory: impact on biopharmaceutical alliance structure and performance. Manuf Serv Oper Manag 19(3):453–471CrossRefGoogle Scholar
  26. Wu X, Zhao R, Tang W (2014a) Uncertain agency models with multi-dimensional incomplete information based on confidence level. Fuzzy Optim Decis Mak 13(2):231–258MathSciNetCrossRefGoogle Scholar
  27. Wu Y, Ramachandran K, Krishnan V (2014b) Managing cost salience and procrastination in projects: compensation and team composition. Prod Oper Manag 23(8):1299–1311CrossRefGoogle Scholar
  28. Xiao W, Xu Y (2012) The impact of royalty contract revision in a multistage strategic R&D alliance. Manag Sci 58(12):2251–2271CrossRefGoogle Scholar
  29. Yang K, Zhao R, Lan Y (2014) The impact of risk attitude in new product development under dual information asymmetry. Comput Ind Eng 76(10):122–137CrossRefGoogle Scholar
  30. Yang K, Zhao R, Lan Y (2016) Impacts of uncertain project duration and asymmetric risk sensitivity information in project management. Int Trans Oper Res 23(4):749–774MathSciNetCrossRefMATHGoogle Scholar
  31. Yang K, Lan Y, Zhao R (2017) Monitoring mechanisms in new product development with risk-averse project manager. J Intell Manuf 28(3):667–681CrossRefGoogle Scholar
  32. Yao K, Li X (2012) Uncertain alternating renewal process and its application. IEEE Trans Fuzzy Syst 20(6):1154–1160CrossRefGoogle Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2017

Authors and Affiliations

  1. 1.College of Management and EconomicsTianjin UniversityTianjinChina
  2. 2.College of Information Science and TechnologyHainan UniversityHaikouChina

Personalised recommendations