Abstract
The risk assessment of a super-large dam exposed to multiple natural risk sources is arduous because of uncertainties in the complex environmental system. Few risk assessment studies consider all of the following factors: the cascade dam effects, the major natural hazard sources and the probabilistic relations between the influencing factors. In this study, we present a Bayesian model of risk analysis (BMRA) for dam overtopping under the combined effects of flood and earthquake. The BMRA involves (1) constructing the specific Bayesian network structure, (2) determining the prior probabilities of parent nodes by hydro-statistical and special probabilistic analysis methods, (3) establishing the parent–child causal relationships by a semi-empirical semi-theoretical method and the relevant statistical analyses results for American dams, (4) creating the conditional probability table by the noisy-OR model, and evaluating the dam-specific overtopping risk probability. The model is applied to analyze the overtopping risk of the Shuangjiangkou (SJK) dam (in the Dadu River Basin, Southwestern China) under flood and seismic impacts. The results reveal that the SJK dam has a very low annual dam overtopping probability over its life cycle and satisfies the corresponding risk control standard. Compared with conventional approaches, the BMRA within the logical context of Bayesian theory addresses uncertainties in risk analysis and provides an advanced, updatable means to assess the dam risk affected by the combined effects of flood and seismic hazards. Thus, the BMRA approach enables an improved, better-informed and more reliable estimate of dam risk.




Similar content being viewed by others
References
Adarsh S, Reddy MJ (2013) Reliability analysis of composite channels using first order approximation and Monte Carlo simulations. Stoch Environ Res Risk Assess 27:477–487
Bayraktarli YY, Ulfkjaer JP, Yazgan U, Faber MH (2005) On the application of Bayesian probabilistic networks for earthquake risk management. In: Proceedings of the 9th international conference on structural safety and reliability, Millpress, Rotterdam
Caia A, Lullo AGD, Ghetto GD, Guadagnini A (2018) Probabilistic analysis of risk and mitigation of deepwater well blowouts and oil spills. Stoch Environ Res Risk Assess. https://doi.org/10.1007/s00477-017-1509-6
Chang YW, Loh CH, Jean WY (2017) Time-predictable model application in probabilistic seismic hazard analysis of faults in Taiwan. Terr Atmos Ocean Sci 28:815–831
Charniak E (1991) Bayesian networks without tears. AI Mag 12:50–63
Chen Y, Lin PZ (2018) The total risk analysis of large dams under flood hazards. Water. https://doi.org/10.3390/w10020140
Cheng ST (1993) Statistics of dam failure. In: Yen BC, Tung YK (eds) Reliability and uncertainty analysis in hydraulic design. ASCE, New York, pp 97–105
Costa V, Fernandes W (2017) Bayesian estimation of extreme flood quantiles using a rainfall-runoff model and a stochastic daily rainfall generator. J Hydrol 554:137–154
Fell R, Bowles DS, Anderson LR, Bell G (2000) The status of methods for estimation of the probability of failure of dams for use in quantitative risk assessment. In: The 20th congress of international commission on large Dams, Beijing, China
Ganji A, Jowkarshorijeh L (2012) Advance first order second moment (AFOSM) method for single reservoir operation reliability analysis: a case study. Stoch Environ Res Risk Assess 26:33–42
Jensen FV (1996) An introduction to Bayesian networks. Springer, New York
Jensen FV, Nielsen TD (2001) Bayesian networks and decision graphs. Springer, New York
Jones B, Jenkinson I, Yang Z, Wang J (2010) The use of Bayesian network modelling for maintenance planning in a manufacturing industry. Reliab Eng Syst Safe 95:267–277
Kwon HH, Moon Y (2006) Improvement of overtopping risk evaluations using probabilistic concepts for existing dams. Stoch Environ Res Risk Assess 10:15. https://doi.org/10.1007/s00477-005-0017-2
Landis WG, Ayre KK, Johns AF, Summers HM, Stinson J, Harris MJ, Herring CE, Markiewicz AJ (2015) The multiple stressor ecological risk assessment for the mercury-contaminated south river and upper shenandoah river using the Bayesian network-relative risk model. Integr Environ Assess Manag 13:85–99
Lei JC (2011) The seismic hazard assessment for cascade hydropower station system. Dissertation, China Earthquake Administration
Li DQ, Chang XL (2006) On the application of Bayesian network for dam risk assessment. In: International symposium on hydropower, Kunming, China
Li SP, Duan B (2016) The highest dam in the world under construction: the Shuangjiangkou core-wall rockfill dam. Engineering 2:274–275
Li LF, Wang JF, Leung H, Jiang CS (2010) Assessment of catastrophic risk using Bayesian network constructed from domain knowledge and spatial data. Risk Anal 30:1157–1175
Liu XY, Guo SL, Liu P, Chen L, Li X (2011) Deriving optimal refill rules for multi-purpose reservoir operation. Water Resour Manag 25:431–448
Liu S, Peng H, Zheng CY, Liu SL, Yan QL (2012) Research on systematic risk model of embankment dam overtopping flood. Appl Mech Mater 212–213:780–785
Lyubushin AA, Kaláb Z, Lednická M, Haggag MH (2013) Discrimination of earthquakes and explosions using multi-fractal singularity spectrums properties. J Seismol 17:975–983
McGuire RK (1995) Probabilistic seismic hazard analysis and design earthquakes: closing the loop. Bull Seismol Soc Am 85:1275–1284
Mediero L, Garrote L, Carrasco FM (2007) A probabilistic model to support reservoir operation decisions during flash floods. Hydrol Sci J 52:523–537
Mkrtchyan L, Podofillini L, Dang VN (2016) Methods for building conditional probability tables of Bayesian belief networks from limited judgment—an evaluation for human reliability application. Reliab Eng Syst Safe 151:93–112
Nápoles OM, Hernández DJD, Escobedo DDL, Arteaga JC (2014) A continuous Bayesian network for earth dams’ risk assessment: methodology and quantification. Struct Infrastruct E 10:589–603
Neil M, Chen XL, Fenton N (2012) Optimizing the calculation of conditional probability tables in hybrid Bayesian networks using binary factorization. IEEE Trans Knowl Data Eng 24:1306–1312
Observernet (2015) Environmental assessment of the construction of the world’s highest dam hydropower station admits to being unfavorable to the environment. HaiwainetWeb. http://opinion.haiwainet.cn/n/2015/0716/c345416-28941772.html. Accessed 15 July 2015
Park Y, Yeghiazarian L, Stedinger JR, Montemagno CD (2008) Numerical approach to cryptosporidium risk assessment using reliability method. Stoch Environ Res Risk Assess 22:169–183
Pearl J (1988) Probabilistic reasoning in intelligent systems. Morgan-Kaufmann, San Mateo
Pearl J, Russell S (2000) Bayesian networks. UCLA Cognitive Systems Laboratory, Technical Report (R-277)
Peng M, Zhang LM (2012a) Analysis of human risks due to dam-break floods—part 1: a new model based on Bayesian networks. Nat Hazards 14:903–933
Peng M, Zhang LM (2012b) Analysis of human risks due to dam break floods—part 2: application to Tangjiashan landslide dam failure. Nat Hazards 64:1899–1923
Peng M, Zhang LM (2013a) Dynamic decision making for dam-break emergency management—part 1: theoretical framework. Nat Hazard Earth Syst 13:425–437
Peng M, Zhang LM (2013b) Dynamic decision making for dam-break emergency management—part 2: application to Tangjiashan landslide dam failure. Nat Hazard Earth Syst 13:439–454
Ren J, Jenkinson I, Wang J, Xu DL, Yang JB (2008) A methodology to model causal relationships on offshore safety assessment focusing on human and organizational factors. J Safe Res 39:87–100
Sil A, Thallak SG, Kolathayar S (2013) Probabilistic seismic hazard analysis of Tripura and Mizoram states. Nat Hazards 68:1089–1108
Smith M (2006) Dam risk analysis using Bayesian networks. In: Proceedings of the 2006 ECI conference on geohazards, New York
Tatalovich J, Harris DW (1998) Comparison of failure modes from risk assessment and historical data for Bureau of Reclamation dams. Technical Report DSO-98-01. U.S. Department of Interior, Bureau of Reclamation, Dam Safety Office, January 1998
Tolo S, Patelli E, Beer M (2017) Robust vulnerability analysis of nuclear facilities subject to external hazards. Stoch Environ Res Risk Assess 31:2733–2756
Van der Gaag LC (1996) Bayesian belief networks: odds and ends. Comput J 39:97–113
Wang F, Zhang QL (2017) Systemic estimation of dam overtopping probability: Bayesian networks approach. J Infrastruct Syst. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000328
Wang H, Qin DY, Sun JL, Wang JH (2001) Study on the general model of hydrological frequency analysis. Sci China (Ser E) Technol Sci 44:52–61
Wang JX, Gu XY, Huang TR (2013) Using Bayesian networks in analyzing powerful earthquake disaster chains. Nat Hazards 68:509–527
Wieland M (2006) Earthquake safety of existing dams. In: The 1st conference on earthquake engineering and seismology, Geneva, Switzerland
Wu XG, Jiang Z, Zhang LM, Skibniewski MJ, Zhong JB (2015) Dynamic risk analysis for adjacent buildings in tunneling environments: a Bayesian network based approach. Stoch Environ Res Risk Assess 29:1447–1461
Xu Y, Zhang LM, Jia JS (2011) Diagnosis of embankment dam distresses using Bayesian networks. Part II. Diagnosis of a specific distressed dam. Can Geotech J 48:1645–1657
Zhang SR, Tan YS (2014) Risk assessment of earth dam overtopping and its application research. Nat Hazards 74:717–736
Zhang LM, Xu Y, Jia JS, Zhao C (2011) Diagnosis of embankment dam distresses using Bayesian networks. Part I. Global-level characteristics based on a dam distress database. Can Geotech J 48:1630–1644
Zhang LM, Peng M, Chang DS, Xu Y (2016a) Analysis of probability of failure of dams. In: Zhang LM, Peng M, Chang DS, Xu Y (eds) Dam failure mechanisms and risk assessment. Wiley, Singapore
Zhang LM, Peng M, Chang DS, Xu Y (2016b) Dam failure risk assessment. In: Zhang LM, Peng M, Chang DS, Xu Y (eds) Dam failure mechanisms and risk assessment. Wiley, Singapore
Zhou JP, Wang H, Chen ZY, Zhou XB, Li B (2015) Evaluations on the safety design standards for dams with extra height or cascade impacts. Part I: fundamentals and criteria. J Hydraul Eng 46:505–514
Zhou K, Martin A, Pan Q (2016) The belief noisy-OR model applied to network reliability analysis. Int J Uncertain Fuzz 6:1–26
Zhu G, Gao MT, Ren XM (2007) Analysis of seismic hazard in the cities of China. Earthq Res China 23:124–130
Acknowledgements
This work was supported by the National Natural Science Foundation of China (Grant No. 41501554), the Programme of Introducing Talents of Discipline to Universities (BC2018038), and National Basic Research Program of China (Grant No. 2013CB036401).
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Chen, Y., Lin, P. Bayesian network of risk assessment for a super-large dam exposed to multiple natural risk sources. Stoch Environ Res Risk Assess 33, 581–592 (2019). https://doi.org/10.1007/s00477-018-1631-0
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00477-018-1631-0