Skip to main content

Advertisement

Log in

Stakeholder Management for Conservation Projects: A Case Study of Ream National Park, Cambodia1

  • Published:
Environmental Management Aims and scope Submit manuscript

Abstract

The paper gives an account of the development and implementation of a stakeholder management framework at Ream National Park, Cambodia. Firstly, the concept of stakeholder is reviewed in management and in conservation literatures. Secondly, the context in which the stakeholder framework was implemented is described. Thirdly, a five-step methodological framework is suggested: (1) stakeholder analysis, (2) stakeholder mapping, (3) development of generic strategies and workplan, (4) presentation of the workplan to stakeholders, and (5) implementation of the workplan. This framework classifies stakeholders according to their level of influence on the project and their potential for the conservation of natural resources. In a situation characterized by conflicting claims on natural resources, park authorities were able to successfully develop specific strategies for the management of stakeholders. The conclusion discusses the implications of the Ream experience and the generalization of the framework to other protected areas.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

DE LOPEZ, T. Stakeholder Management for Conservation Projects: A Case Study of Ream National Park, Cambodia1 . Environmental Management 28, 47–60 (2001). https://doi.org/10.1007/s002670010206

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s002670010206

Navigation