Abstract
In this study, a dynamic two-level framework is proposed to model investment incentives in a multi-carrier energy market from a strategic company’s point of view. Capacity payment and firm contract are assumed as investment incentives to encourage the strategic producer to invest in generation units. In addition, financial incentives to invest in combined heat and power (CHP) include tax rebate and loans. Strategic company’s behavior is considered as a two-level model so that, in the first level, the objective function is to maximize the profit of the strategic producer by participating in an energy hub market. The strategic producer can invest in transmission lines, generation units, CHP, and gas furnace. In the second level, the aim is to maximize a multi-carrier energy social welfare encompassing heat, gas, and electric energy. In this model, units invested by rival companies are modeled using possible scenarios. Electric energy loads in this energy hub system are envisaged to be elastic, while heat loads are assumed to be inelastic to the market price. On the other hand, gas loads are indirectly elastic to the price. Besides, in the proposed framework, DC power flow and an exact gas flow model with the linearized Weymouth equation are used. The proposed model is implemented on two case studies including 6-bus system, and an energy hub system encompassing 24-bus IEEE RTS power system and 10-node natural gas system.
Similar content being viewed by others
Abbreviations
- \({S/S}^{\prime }\) :
-
Index for scenario
- \({y/y}^{\prime }\) :
-
Dynamic stage number (year)
- t :
-
Demand block number
- i / q / / n :
-
Number of new/existing//generation units for strategic//rival company
- c :
-
Demand number
- m :
-
Number of candidate production units for investment
- \({b/b}^{\prime }\) :
-
Power grid bus
- \({l/l}^{\prime }\) :
-
Gas network bus
- k :
-
CHP number
- \(\text {TS}_{{yt}}\) :
-
Weighting coefficient of demand block t in year y
- \(\text {SP}_{s}\) :
-
Likelihood of scenario s occurring in year y
- BU:
-
SG’s investment funds
- Y :
-
The cost of annual investment of the generation new unit (€/MW)
- \(\text {OC}_{i}^{\text {Si}}/\text {OC}_{q}^{\text {Sq}}\) :
-
New/existing generation units’ operating costs i/q of strategic company i
- \(\text {OC}_{n}^{\text {NS}}\) :
-
Generation units’ operating costs of rival company
- \(\overline{C}_{{ytc}}\) :
-
Maximum consumption for demand c in block t and year y (MW)
- \(B_{{tc}}^{d}\) :
-
The proposed price for demand c in block t and year y in scenario S
- \(\text {CU}_{{yim}}\) :
-
Candidate capacity for investment m in the new unit i (MW)
- \(\overline{P}_{q}^{\text {Sq}}/\overline{P}_{n}^{\text {NS}}\) :
-
Existing/generation units’s capacity q/n of strategic/rival company (MW)
- \(S_{{bb^{\prime }}}\) :
-
Susceptance of transmission line \(b-{b}^{\prime }\) (PU)
- \(\overline{\text {PF}}_{{bb'}}/\overline{\text {'PF}}_{{bb'}}\) :
-
Capacity of existing/new transmission line \(b-b^{\prime }\) (MW)
- d :
-
Annual discount rate
- FV/FP:
-
Volume/price of FC
- CP:
-
Capacity payment rate (€/MWh)
- \(\text {F.O.R}^{\text {Si}}/\text {F.O.R}^{\text {Sq}}\) :
-
Mandatory exit rate of new/available plants
- \(\overline{P}^{C2E}_{k}\) :
-
Capacity of candidate CHP to be invested (MW)
- \(\overline{PF}_{{'bb'}}\) :
-
Capacity of candidate transmission line to be invested (MW)
- \({P}^{'G2F}_{l}\) :
-
Capacity of candidate gas furnace to be invested (MMBtu)
- \(Y^{C2E}_{k}\) :
-
The annual cost resulted from investment of the new CHP (€/MW)
- \(Y^{L}_{{'bb'}}\) :
-
The annual cost resulted from investment of the new transmission line (€/MW)
- \( Y^{F}_{l}\) :
-
The annual cost resulted from investment of the new gas furnace (€/MW)
- \(\eta ^{C2E}\ \eta ^{C2H}\) :
-
Electric energy and heat conversion efficiency produced by CHP
- \(\underline{\pi }_{l} \ \overline{\pi }_{l}\) :
-
Minimum and maximum natural gas pressure at each gas bus (PSIG)
- \(\underline{P}^{G}_{l}\ \overline{P}^{G}_{l}\) :
-
Minimum and maximum natural gas production (MMBtu)
- \(\overline{F}^{G}\) :
-
Maximum natural gas flowed by pipelines (MMBtu)
- \(K^{G}\) :
-
Dispatch factor between gas furnace and CHP
- \(\eta ^\mathrm{pip}\) :
-
Pipeline constant (MMBtu/PSIG)
- \(L^{H}_{ytl}\) :
-
Head demand (MMBtu)
- \(R^{T}\) :
-
Tax rebate for investment in CHP
- \(R^{L}\) :
-
Loan factor for investment in CHP
- \(B^{H}_{ytl}/\overline{B}^{G}_{ytl}\) :
-
The proposed price for buying heat/gas (€/MMBtu)
- \(\overline{P}_{yi}^{\text {Si}}\) :
-
Investment capacity of the new unit i of SG (MW)
- \(P_{{ytis}}^{\text {Si}}/P_{{ytqs}}^{\text {Sq}}//P_{{ytns}}^{\text {NS}}\) :
-
New/existing//generation unit’s i / q//n production capacity by strategic//rival GENCO in year y in demand block t and scenario s
- \(\overline{P}_{{yy'i}}^{\text {Siq}}/P_{{yy'tis}}^{\text {Siq}}\) :
-
Available capacity/produced power of the new unit i by the strategic company in year \(y^{\prime }\) in years after the construction year y (MW)
- \(\text {OC}_{{yi}}^{\text {Siq}}/B_{{yy'tis}}^{\text {Siq}}\) :
-
Operating cost/proposed price of the new unit i by the strategic company in year \(y^{\prime }\) in years after the construction year y (MW)
- \(\text {CU}_{{ytim}}^{b}\) :
-
For the candidate capacity h in investment year y, binary variable equals one, otherwise, it equals zero
- \(B_{\text {ytis}}^{\text {Si}}/B_{\text {ytqs}}^{\text {Sq}}\) :
-
New/existing generation unit’s proposed price i / q by strategic company in the block y, demand block t, and scenario s (€/MWh)
- \(B_{{ytns}}^{\text {NS}}\) :
-
Generation unit’s proposed price n by non-strategic company in the block y, demand block t, and scenario s (€/MWh)
- \(C_{{ytcs}}\) :
-
Power consumption for demand c in year y, block demand t, and scenario s (MW)
- \(A_{ytbs}\) :
-
The voltage angle of bus b in block demand t, and scenario s
- \(U^{C}_{yk}/ U^{'C}_{yy'k}\) :
-
Binary variable for CHP investment
- \(U^{L}_{ybb'}/ U^{'L}_{yy'bb'}\) :
-
Binary variable for transmission line investment
- \(U^{F}_{yl}/ U'^{F}_{yy'l}\) :
-
Binary variable for gas furnaces investment
- \(\widetilde{P}^{C2E}_{ytk}\ \widetilde{P}^{'C2E}_{yy'tk}\) :
-
Electricity produced by new CHP (MW)
- \(\widetilde{P}^{C2H}_{ytk}\ \widetilde{P}^{'C2H}_{yy'tk}\) :
-
Heat produced by new CHP (MMBtu)
- \(\widetilde{P}^{G2C}_{ytl)}\ \widetilde{P}^{G2C}_{yy'tl)}\) :
-
Gas required for supplying CHP (MMBtu)
- \(P^{G2E}_{ytl}\) :
-
Gas required for supplying thermal generation units (MMBtu)
- \(\pi _{ytl}\) :
-
Gas pressure at each gas bus (PSIG)
- \(P^{G}_{ytl}\) :
-
Gas produced by utility (MMBtu)
- \(F^{G}_{ytll'}\) :
-
Natural gas flowed by pipelines (MMBtu)
- \(P^{G2F}_{ytl}\) :
-
Natural gas required for supplying existing gas furnace (MMBtu)
- \(\widetilde{P}^{G2F}_{ytl}\ \widetilde{P}^{'G2F}_{yy'tl}\) :
-
Gas required for supplying new gas furnace (MMBtu)
- \(\widetilde{B}^{C2H}_{ytk}/\widetilde{B}^{'C2H}_{yy'tk}\) :
-
The proposed price by CHP for selling heat (€/MMBtu)
- \(\widetilde{B}^{F2H}_{ytl}/{\widetilde{B}^{'F2H}_{yy'tl}}\) :
-
The proposed price by gas furnace for selling heat (€/MMBtu)
- \(B^{G}_{ytl}\) :
-
The proposed price by gas supplier for selling gas (€/MMBtu)
References
Sumaili LR, Jean M, Vladimiro F, Carlos S, Marcelino S (2016) Mean shift densification of scarce data sets in short-term electric power load forecasting for special days. Electr Eng 99(3):881–98, 10
Mili L, Triantis K, Greer A (2018) Integrating community resilience in power system planning. Power Engineering: Advances and Challenges Part B: Electrical Power Publisher. CRC Press
Vargas-Jaramillo JR, Montanez-Barrera JA, von Spakovsky MR, Mili L, Cano-Andrade S (2019) Effects of producer and transmission reliability on the sustainability assessment of power system networks. Energies 12:546
Manshadi SD, Khodayar ME (2015) Resilient operation of multiple energy carrier microgrids. IEEE Trans Smart Grid 6(5):2283–2392
Zhang X, Shahidehpour M, Alabdulwahab A, Abusorrah A (2015) Optimal expansion planning of energy hub with multiple energy infrastructures. IEEE Trans Smart Grid 6(5):2302–2311
Geng J-B, Ji Q, Fan Y (2016) How regional natural gas markets have reacted to oil price shocks before and since the shale gas revolution: a multi-scale perspective. J Nat Gas Sci Eng 36:734–746
Mazyan W, Ahmadi A, Ahmed H, Hoorfar M (2016) Market and technology assessment of natural gas processing: a review. J Nat Gas Sci Eng 30:487–514
Abid M, Alimi M (2019) Stochastic convergence in us disaggregated gas consumption at the sector level. J Nat Gas Sci Eng 61:357–368
Hedman B, Hampson A, Darrow K (2013) The opportunity for CHP in the United States. ICF International, Washington, DC
Nadel S, Economy E-E (2016) Electricity distribution & end use: challenges & opportunities. In: American Council for an energy-efficient economy
Xu Y, Mili L (2018) Probabilistic power flow analysis based on the adaptive polynomial chaos-anova method. In: 2018 IEEE power and energy society general meeting (PESGM)
Zangeneh A, Jadid S, Rahimi-Kian A (2010) Uncertainty based distributed generation expansion planning in electricity markets. Electr Eng 91(7):369–82, 03
Xu Y, Huang C, Chen X, Mili L, Tong CH, Korkali M, Min L (2018) Response-surface-based Bayesian inference for power system dynamic parameter estimation. IEEE Trans Smart Grid 99:1
Xu Y, Mili L, Zhao J (2019) Probabilistic power flow calculation and variance analysis based on hierarchical adaptive polynomial chaos-ANOVA method. IEEE Trans Power Syst 34(5):3316–3325
Kelarestaghi KB, Foruhandeh M, Heaslip K, Gerdes R (2019) Intelligent transportation system security: Impact-oriented risk assessment of in-vehicle networks. IEEE Intell Transp Syst Mag. https://doi.org/10.1109/MITS.2018.2889714
Xu Y, Mili L, Sandu A, von Spakovsky MR, Zhao J (2018) Propagating uncertainty in power system dynamic simulations using polynomial chaos. IEEE Trans Power Syst 34:338–348
Foruhandeh M, Gerdes R (2017) Analysis of authentication parameters in uplink scenario of heterogeneous networks. In: IEEE Trustcom/BigDataSE/ICESS, pp 833–838
Mokgonyana L, Zhang J, Li H, Hu Y (2017) Optimal location and capacity planning for distributed generation with independent power production and self-generation. Appl Energy 188:140–50
Prenc R, S̆krlec D, Durović MZ̆ (2015) The implementation of capital budgeting analysis for distributed generation allocation problems. Electr Eng 97(3):225–238
Anbalagan P, Ramachandran V (2012) Service-oriented architectural model for generating system adequacy evaluation. Electr Eng 94(1):19–25, 03
Spangardt G, Lucht M, Handschin E (2006) Applications for stochastic optimization in the power industry. Electr Eng (Archiv fur Elektrotechnik) 88(3):177–182, 03
Sowa T, Vasconcelos M, Schnettler A, Metzger, Michael H, Alexander, Reischboek M, Köberle R (2016) Method for the operation planning of virtual power plants considering forecasting errors of distributed energy resources. Electr Eng 98(4):347–54, 12
Jornada D, Leon VJ (2016) Robustness methodology to aid multiobjective decision making in the electricity generation capacity expansion problem to minimize cost and water withdrawal. Appl Energy 162:1089–108
Valinejad J, Oladi Z, Barforoshi T, Parvania M (2017) Stochastic unit commitment in the presence of demand response program under uncertainties. IJE Trans B Appl 30(8):1134–1143
Valinejad J, Marzband M, Akorede MF, Barforoshi T, Jovanović M (2017) Generation expansion planning in electricity market considering uncertainty in load demand and presence of strategic gencos. Electr Power Syst Res 152:92–104
Zeblah A, Hadjeri S, Chatelet E, Massim Y (2010) Efficient harmony search algorithm for multi-stages scheduling problem for power systems degradation. Electr Eng 92(3):87–97, 09
Linders M, Krost G (2001) Advanced visualization for power system operation. Electr Eng 83(5–6):303–06, 11
Doorman G, Botterud A (2008) Analysis of generation investment under different market designs. IEEE Trans Power Syst 23(3):859–67
Murphy FH, Smeers Y (2010) On the impact of forward markets on investment in oligopolistic markets with reference to electricity. Operation 58(3):515–28
Garcia A, Stacchetti E (2011) Investment dynamics in electricity markets. Econ Theory 46(2):149–87, 02
Genc TS, Thille H (2011) Investment in electricity markets with asymmetric technologies. Energy Econ 33(3):379–87
Grimm V, Zoettl G (2013) Investment incentives and electricity spot market competition. J Econ 22(4):832–51
Stoltmann A, Jaskólski M, Bucko P (2019) Optimization of combined heat and power (CHP) market allocation: the case of Poland. In: IOP conference series: earth and environmental science, vol 214, no 1, p 012036
Deng L, Li Z, Sun H, Guo Q, Xu Y, Chen R, Wang J, Guo Y (2019) Generalized locational marginal pricing in a heat-and-electricity-integrated market. IEEE Trans Smart Grid. https://doi.org/10.1109/TSG.2019.2904522
Zhang Q, Mclellan BC, Tezuka T, Ishihara KN (2013) An integrated model for long-term power generation planning toward future smart electricity systems. Appl Energy 112:1424–37
Valinejad J, Barforoushi T (2015) Generation expansion planning in electricity markets: a novel framework based on dynamic stochastic MPEC. Int J Electr Power Energy Syst 70:108–17
Zafirakis D, Chalvatzis KJ, Baiocchi G, Daskalakis G (2013) Modeling of financial incentives for investments in energy storage systems that promote the large-scale integration of wind energy. Appl Energy 105:138–54
Murphy FH, Smeers Y (2005) Generation capacity expansion in imperfectly competitive restructured electricity markets. Oper Res 53(4):646–661, 08
Fathtabar H, Barforoushib T, Shahabi M (2018) Dynamic long-term expansion planning of generation resources and electric transmission network in multi-carrier energy systems. Electr Power Energy Syst 102:97–109
Gupta N, Khosravy M, Saurav K, Sethi IK, Marina N (2017) Value assessment method for expansion planning of generators and transmission networks: a non-iterative approach. Electr Eng 7:1–16
Capuder T, Zidar M, S̆krlec D (2012) Evolutionary algorithm with fuzzy numbers for planning active distribution network. Electr Eng 94(3):135–45, 09
fard SPAA-T, Poure P, Saadate S (2011) Distribution system planning considering integration of distributed generation and load curtailment options in a competitive electricity market. Electr Eng (Archiv fur Elektrotechnik) 93:23–32, 03
Orths A, Schmitt A, Styczynski ZA, Verstege J (2001) Multi-criteria optimization methods for planning and operation of electrical energy systems. Electr Eng 83(5–6):251–58, 11
Hooshmand R A, Mohkami H (2011) New optimal placement of capacitors and dispersed generators using bacterial foraging oriented by particle swarm optimization algorithm in distribution systems. Electr Eng (Archiv fur Elektrotechnik) 93(1):43–53, 03
Afkousi-Paqaleh M, Fard AA-T, Rashidinejad M (2010) Distributed generation placement for congestion management considering economic and financial issues. Electr Eng 92(6):193–201, 11
Valinejad J, Marzband M, Akorede MF, Elliott ID, Godina R, Matias J, Pouresmaeil E (2018) Long-term decision on wind investment with considering different load ranges of power plant for sustainable electricity energy market. Sustainability 10:3811
Valinejad J, Marzband M, Barforoushi T, Kyyrä J, Pouresmaeil E (2018) Dynamic stochastic EPEC model for competition of dominant producers in generation expansion planning. In: 5th international symposium on environment friendly energies and applications (EFEA) (2018)
Birge JR, Louveaux F (2011) Introduction to stochastic programming. Springer, Berlin
Foruhandeh M, Tadayon N, AÃ\(\acute{{\rm r}}\)ssa S (2016) Uplink modeling of K-tier heterogeneous networks: a queuing theory approach. IEEE Commun Lett 21:164–167
Foruhandeh M, Aissa S (2015) Efficiency of DC combination of rectified waveforms in energy harvesting systems. IEEE International Conference on Ubiquitous Wireless Broadband (ICUWB), 4–7 Oct. 2015
Conejo AJ, Morales MCJM (2010) Decision making under uncertainty in electricity markets. Springer, Berlin
Andreoni AM, Garcia-Agreda A, Strada TJ, Saraiva JT (2007) Strategies for power systems expansion planning in a competitive electrical market. Electr Eng 89(5):433–41, 05
Valinejad J, Barforoshi T, Marzband M, Pouresmaeil E, Godina R, Catalao JP (2018) Investment incentives in competitive electricity markets. Appl Sci 8(10):1978
Vithayasrichareon P, MacGill IF (2014) Incorporating short-term operational plant constraints into assessments of future electricity generation portfolios. Appl Energy 128:144–55
Marques AC, Fuinhas JA, Menegaki AN (2014) Interactions between electricity generation sources and economic activity in Greece: a VECM approach. Appl Energy 132:34–46
Gabriel S, Conejo A, Fuller J, Hobbs B, Ruiz C (2012) Complementary modeling in energy markets. International Series in Operations Research & Management Science. Springer, New York
Siddiqui S, Gabriel S (2013) An sos1-based approach for solving MPECs with a natural gas market application. Netw Spat Econ 13(2):205–227
Grigg C, Wong P, Albrecht P, Allan R, Bhavaraju M et al (1999) The IEEE reliability test system-1996. A report prepared by the reliability test system task force of the application of probability methods subcommittee. IEEE Trans Power Syst 14(3):1010–1020
Valinejad J, Firouzifar S, Marzband M, AlâĂŘSumaiti AS (2018) Reconsidering insulation coordination and simulation under the effect of pollution due to climate change. Int Trans Electr Energy Syst 28:e2595
Valinejad J, Marzband M, Busawona K, Kyyrä J, Pouresmaeil E (2018) Investigating wind generation investment indices in multi-stage planning. In: 5th International symposium on environment friendly energies and applications (EFEA)(2018)
Author information
Authors and Affiliations
Corresponding author
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Valinejad, J., Marzband, M., Xu, Y. et al. Dynamic behavior of multi-carrier energy market in view of investment incentives. Electr Eng 101, 1033–1051 (2019). https://doi.org/10.1007/s00202-019-00834-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00202-019-00834-5