Advertisement

Correction to: Aggregate production planning under uncertainty: a comprehensive literature survey and future research directions

  • Aboozar JamalniaEmail author
  • Jian-Bo Yang
  • Ardalan Feili
  • Dong-Ling Xu
  • Gholamreza Jamali
Correction
  • 1.1k Downloads

Correction to: The International Journal of Advanced Manufacturing Technology

  https://doi.org/10.1007/s00170-018-3151-y

The original version of this article contained a mistake.

The following row in Table 5 under the category “Stochastic mathematical programming” is missing.

Methodology

Number of publications

Related references

Stochastic nonlinear programming

6

Vörös [148]; Ning et al. [74];

Mirzapour Al-e-hashem et al. [75];

Lieckens and Vandaele [76]; Pang and Ning [135]; Ciarallo et al. [145]

The original article has been corrected.

Notes

Copyright information

© Springer-Verlag London Ltd., part of Springer Nature 2019

Authors and Affiliations

  • Aboozar Jamalnia
    • 1
    Email author
  • Jian-Bo Yang
    • 2
  • Ardalan Feili
    • 3
  • Dong-Ling Xu
    • 2
  • Gholamreza Jamali
    • 4
  1. 1.Operations Management and Information Technology Department, Faculty of ManagementKharazmi UniversityTehranIran
  2. 2.Decision and Cognitive Sciences Research Centre, Alliance Manchester Business SchoolThe University of ManchesterManchesterUK
  3. 3.School of ManagementFerdowsi University of MashhadMashhadIran
  4. 4.Department of Industrial Management, Faculty of HumanitiesPersian Gulf UniversityBushehrIran

Personalised recommendations