Analysis of critical processes in the implementation of lean manufacturing projects using project management guidelines

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

Many companies have achieved significant results in recent decades by adopting the lean manufacturing philosophy, but its implementation still leaves room for improvement. The literature on this subject cites several critical processes during the implementation of lean projects that should be identified and improved to ensure even better results. This article aims to contribute to the aforementioned body of literature by assessing lean manufacturing projects using project management guidelines, specifically the 47 processes published in the 5th edition of the Project Management Body of Knowledge. Based on questionnaire-aided interviews with 17 professionals (eight corporate managers and nine experts with PhDs in this area), we found that the most critical processes in the implementation of lean projects involve procurement, stakeholder, communication, human resources, and risk management. The results presented here were validated using the techniques of multidimensional scaling, exploratory factor analysis, and descriptive statistics.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Deif AM, ElMaraghy H (2014) Cost performance dynamics in lean production leveling. J Manuf Syst 33(4):613–623

    Article  Google Scholar 

  2. Katayama H, Bennett D (1996) Lean production in a changing competitive world: a Japanese perspective. Int J Operat Prod Manag 16(2):8–23

    Article  Google Scholar 

  3. Womack JP (2004) A Mentalidade Enxuta nas Empresas. Editora Campus, Rio de Janeiro

    Google Scholar 

  4. Losonci D, Demeter K (2013) Lean production and business performance: international empirical results. Compet Rev 23(3):218–233

    Google Scholar 

  5. Crawford KM, Blackstoe JH, Cox JM (1988) A study of JIT implementation and operating problems. Int J Prod Res 26(9):1561–1568

    Article  Google Scholar 

  6. Cua KO, McKone KE, Schroeder RG (2001) Relationships between implementation of TQM, JIT, and TPM and manufacturing performance. J Oper Manag 19(6):675–694

    Article  Google Scholar 

  7. Flynn BB, Sakakibara S, Schroeder RG (1995) Relationship between JIT and TQM practices and performance. Acad Manag J 38(5):1325–1360

    Article  Google Scholar 

  8. Huson M, Nanda D (1995) The impact of just-in-time manufacturing on firm performance in the US. J Oper Manag 12(3–4):297–310

    Article  Google Scholar 

  9. MacDuffie JP, Sethuraman K, Fisher ML (1996) Product variety and manufacturing performance: evidence from the international automotive assembly plant study. Manag Sci 42(3):350–369

    Article  MATH  Google Scholar 

  10. McKone KE, Schroeder RG, Cua KO (2001) The impact of total productive maintenance practices on manufacturing performance. J Oper Manag 19(1):39–58

    Article  Google Scholar 

  11. Anvari A, Zulkifli N, Yusuff RM (2013) A dynamic modeling to measure lean performance within lean attributes. Int J Adv Manuf Technol 66(5–8):663–677

    Article  Google Scholar 

  12. Hofer C, Eroglu C, Rossiter HA (1995) The effect of lean production on financial performance: the mediating role of inventory leanness. Int J Prod Econ 138(2):242–253

    Article  Google Scholar 

  13. Dal Forno AJ, Pereira FA, Forcellini FA, Kipper LM (2014) Value stream mapping: a study about the problems and challenges found in the literature from the past 15 years about application of lean tools. Int J Adv Manuf Technol 72(5–8):779–790

    Article  Google Scholar 

  14. Jadhav JR, Shankar S, Santosh M (2014) Exploring barriers in lean implementation. Int J Lean Six Sigma 5(2):122–148. doi:10.1108/IJLSS-12-2012-0014

    Article  Google Scholar 

  15. PMI (2013) Project management institute. A guide to the project management body of knowledge—PMBoK, 5th edn. PMI Publishing Division, Newtown Square

    Google Scholar 

  16. Arrto K et al (2008) Project strategy: strategy types and their contents in innovation projects. Int J Manag Proj Bus 1(1):49–70. doi:10.1108/17538370810846414

    Article  Google Scholar 

  17. Badurdeen F, Wijekoon K, Marksberry P (2011) An analytical hierarchy process-based tool to evaluate value systems for lean transformations. J Manuf Technol Manag 22(1):46–65. doi:10.1108/17410381111099806

    Article  Google Scholar 

  18. Boyle TA, Scherrer-Rathje M, Stuart I (2011) Learning to be lean: the influence of external information sources in lean improvements. J Manuf Technol Manag 22(5):587–603

    Article  Google Scholar 

  19. Hasle P (2014) Lean production—an evaluation of the possibilities for an employee supportive lean practice. National Research Centre for the Working Environment, Copenhagen

    Google Scholar 

  20. Heloani R (2003) Gestão e organização no capitalismo globalizado. História da manipulação psicológica no mundo do trabalho. Editora Atlas, São Paulo

    Google Scholar 

  21. Olsson R (2007) In search of opportunity management: is the risk management process enough? Int J Proj Manag 25(8):745–752. doi:10.1016/j.ijproman.2007.03.005

    Article  Google Scholar 

  22. Scherer JO, Ribeiro JLD (2013) Proposição de um modelo para análise dos fatores de Risco em projetos de implantação da metodologia lean. Gestão e Produção 20(3):537–553

    Article  Google Scholar 

  23. Achanga P (2006) Critical success factors for lean implementation within SMEs. J Manuf Technol Manag 17(4):460–471

    Article  Google Scholar 

  24. Benjamin SJ, Murugaiah MM, Marathamuthu S (2013) The use of SMED to eliminate small stops in a manufacturing firm. J Manuf Technol Manag 24(5):792–807. doi:10.1108/17410381311328016

    Article  Google Scholar 

  25. Correia LC et al (2001) Uma proposta para disseminação dos dispositivos poka-yoke através dos CQC’s. Encontro Nacional de Engenharia de Produção, Brasil

    Google Scholar 

  26. Fogliatto FS, Fagundes PRM (2003) Troca rápida de ferramenta: proposta metodológica e estudo de caso. Gestão Produção 10(2):163–181

    Article  Google Scholar 

  27. Liker JK (2005) O modelo Toyota: 14 princípios. Editora Bookman, Porto Alegre

    Google Scholar 

  28. Myerson P (2012) Lean supply chain and logistics management. McGraw-Hill, New York

    Google Scholar 

  29. Ohno TO (1997) Sistema Toyota de Produção: além da produção em larga escala. Bookman, Porto Alegre

    Google Scholar 

  30. Panizzolo R (1998) Applying the lessons learned from 27 lean manufacturers: the relevance of relationships management. Int J Prod Econ 55(3):223–240

    Article  Google Scholar 

  31. Pattanaik LN, Sharma BP (2009) Implementing lean manufacturing with cellular layout: a case study. Int J Adv Manuf Technol 42(7–8):772–779

    Article  Google Scholar 

  32. Rother M, Harris R (2002) Criando Fluxo Contínuo. Editora Lean Institute Brasil, São Paulo

    Google Scholar 

  33. Shingo S (2000) Sistema de troca rápida de ferramenta. Bookman, Porto Alegre

    Google Scholar 

  34. Shook J, Rother M (2003) Aprendendo a Enxergar. Editora Lean Institute Brasil, São Paulo

    Google Scholar 

  35. Timans W, Antony J (2012) Implementation of lean six sigma in small- and medium-sized manufacturing enterprises in the Netherlands. J Operat Res Soc 63(2):339–353

    Article  Google Scholar 

  36. Womack JP, Jones DT (2006) Soluções enxutas: Como empresas e clientes conseguem juntos criar valor e riqueza. Editora Campus, Rio de Janeiro

    Google Scholar 

  37. Liang C, Guodong J (2007) Project management of web-based product development teleservice. Int J Adv Manuf Technol 32(1):162–168

    Article  Google Scholar 

  38. Mir FA, Pinnington AH (2014) Exploring the value of project management: linking project management performance and project success. Int J Proj Manag 32:202–217

    Article  Google Scholar 

  39. Vidal L, Marle F, Bocquet J (2011) Measuring project complexity using the analytic hierarchy process. Int J Proj Manag 29(6):718–727

    Article  Google Scholar 

  40. Dinsmore PC, Cavalieri A (2007) Como se tornar um profissional em gerenciamento de projetos. Qualitymark, Rio de Janeiro

    Google Scholar 

  41. Pinto JS (2013) Variáveis dos Atributos Complexidade e Incerteza em Projetos: proposta de criação de Escala de Mensuração. Tese de doutorado. Faculdade de Engenharia Mecânica, Universidade Estadual de Campinas, 2013.

  42. Stone KB (2012) Four decades of lean: a systematic literature review. Int J Lean Six Sigma 3(2):112–132. doi:10.1108/20401461211243702

    Article  Google Scholar 

  43. Wickramasinghe D, Wickramasinghe V (2011) Perceived organisational support, job involvement and turnover intention in lean production in Sri Lanka. Int J Adv Manuf Technol 55(5–8):817–830

    Article  Google Scholar 

  44. Selltiz C, Wrightsman LS, Cook SW (1987) Métodos e Técnicas de Pesquisa nas Relações Sociais. Editora EPU, São Paulo

    Google Scholar 

  45. Hair JF Jr, Black WC, Babin BJ, Anderson R, Atham E, Ronald L (2009) Análise Multivariada de Dados. Editora Bookman, Porto Algere

    Google Scholar 

  46. Gil A (2010) Como Elaborar Projetos de Pesquisa. Editora Atlas, São Paulo

    Google Scholar 

  47. Fávero LP, Belfiore P, Silva FLS, Chan BL (2009) Análise de Dados: modelagem multivariada para tomada de decisões. Elsevier, Rio de Janeiro

    Google Scholar 

  48. Malhotra N (2012) Pesquisa de Marketing: uma orientação aplicada. Bookman, Porto Alegre

    Google Scholar 

  49. King G (2014) How not to lie with statistics. New York University. Available at:<http://gking.harvard.edu/files/mist.pdf> Access: [Nov 2014].

  50. Filho DBF, Junior JAS (2010) Visão além do alcance: uma introdução à análise fatorial. Opinião Pública 16(1):160–185

    Article  Google Scholar 

  51. Hair JF Jr, Babin BJ, Money AH, Samouel P (2005) Fundamentos de Métodos de Pesquisa em Administração. Editora Bookman, Porto Alegre

    Google Scholar 

  52. Pereira A (2008) Guia Prático de Utilização do SPSS: Análise de Dados. Edições Silabo, Lisboa

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Rosley Anholon.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Anholon, R., Sano, A.T. Analysis of critical processes in the implementation of lean manufacturing projects using project management guidelines. Int J Adv Manuf Technol 84, 2247–2256 (2016). https://doi.org/10.1007/s00170-015-7865-9

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-015-7865-9

Keywords

Navigation