An efficient method to reduce relative capacity shortage using annualised hours planning

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

Annualised hours (AH) is a method for meeting seasonal demand which involves irregular distribution of working hours. This paper considers an AH scenario where different category of workers are contracted to work for a certain number of hours per year and each category has different efficiencies for different types of task. The number of workers required is estimated based on the forecasted hours considering the same efficiency for all types of task by a worker. In a number of cases, tasks are too difficult to be performed by temporary workers. In situations where overtime or hiring temporary workers are not considered, capacity shortage is possible during certain weeks as a result of the relative efficiency. The relative capacity shortage, which is defined as the capacity shortage related to the required capacity, has to be minimised. This paper proposes an AH planning problem using linear programming model to minimise relative capacity shortage in which workers are considered to be cross trained. The computational demonstration shows the effectiveness of the model.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Corominas A, Lusa A, Pastor R (2007) Planning annualised hours with a finite set of weekly working hours and cross trained workers. Eur J Oper Res 176:230–239

    Article  MATH  Google Scholar 

  2. Corominas A, Lusa A, Pastor R (2004) Planning annualised hours with finite set of working hours and joint holidays. Ann Oper Res 128:217–233

    Article  MATH  Google Scholar 

  3. Lusa A, Pastor R, Corominas A (2008) Determining the most appropriate set of weekly working hours for planning annualised working time. Int J Prod Econ 111(2):697–706

    Article  Google Scholar 

  4. Suresh Kumar MR, Pillai VM (2009) Planning annualised hours with partially individualised holiday weeks. Int J Oper Quant Manag 15:173–188

    Google Scholar 

  5. Azmat WM (2004) A case study of single shift planning and scheduling under annualised hours; A simple three step approach Regards Sureshkumar M.R. Eur J Oper Res 1:148–175

    Article  MathSciNet  Google Scholar 

  6. Corominas A, Lusa A, Pastor R (2002) Using MILP to plan annualised working hours. J Oper Res Soc 53:1101–1108

    Article  MATH  Google Scholar 

  7. Corominas A, Lusa A, Pastor R (2007) Using a MILP model to establish a frame work for an annualised hours agreement. Eur J Oper Res 177(2):1495–1506

    Article  MATH  Google Scholar 

  8. Hung R (1999) A multiple-shift workforce scheduling model under annualised hours. Nav Res Logist 46:726–736

    Article  MATH  Google Scholar 

  9. Hung R (1999) Scheduling a workforce under annualised hours. Int J Prod Res 37:2419–2427

    Article  MATH  Google Scholar 

  10. Hert A, Lahrichi N, Widmer M (2010) A Flexible MILP model for multiple shift work force planning under annualised hours. Eur J Oper Res 200(3):860–873

    Article  Google Scholar 

  11. MacMeeking J (1995) Why Tescos new composite distribution needed annual hours. Int J Retail Distrib Manag 23:36–38

    Article  Google Scholar 

  12. Grabot B, Letouzey A (2000) Short-term manpower management in manufacturing systems: new requirements and DSS prototyping. Comput Ind 3:11–29

    Article  Google Scholar 

  13. Sayin S, Karabati S (2007) Assigning cross trained workers to departments: a two stage optimization model to maximize utility and skill improvement. Eur J Oper Res 176:1643–1658

    Article  MATH  Google Scholar 

  14. Campbell G-M, Diaby M (2002) Development and evaluation of an assignment heuristic for allocation cross-trained workers. Eur J Oper Res 138:9–20

    Article  MathSciNet  MATH  Google Scholar 

  15. Lusa A, Corominas A, Munoz N (2008) A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty. Int J Prod Econ 113:957–968

    Article  Google Scholar 

  16. Lusa A, Corominas A, Pastor R (2006) Planning holidays and working time under annualised hours. Research Institute IOC-DT-P-2006-4. http://upcommons.upc.edu/e-prints/bitstream/2117/310/1/Amaia%202.pdf. Accessed 10-07-2010

  17. Corominas A, Pastor R, Rodriguez E (2006) Rotational allocation of tasks to multifunctional workers in a service industry. Int J Prod Econ 103:3–9

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. R. Sureshkumar.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Sureshkumar, M.R., Pillai, V.M. An efficient method to reduce relative capacity shortage using annualised hours planning. Int J Adv Manuf Technol 65, 571–580 (2013). https://doi.org/10.1007/s00170-012-4196-y

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-012-4196-y

Keywords

Navigation