Abstract
Annualised hours (AH) is a method for meeting seasonal demand which involves irregular distribution of working hours. This paper considers an AH scenario where different category of workers are contracted to work for a certain number of hours per year and each category has different efficiencies for different types of task. The number of workers required is estimated based on the forecasted hours considering the same efficiency for all types of task by a worker. In a number of cases, tasks are too difficult to be performed by temporary workers. In situations where overtime or hiring temporary workers are not considered, capacity shortage is possible during certain weeks as a result of the relative efficiency. The relative capacity shortage, which is defined as the capacity shortage related to the required capacity, has to be minimised. This paper proposes an AH planning problem using linear programming model to minimise relative capacity shortage in which workers are considered to be cross trained. The computational demonstration shows the effectiveness of the model.
Similar content being viewed by others
References
Corominas A, Lusa A, Pastor R (2007) Planning annualised hours with a finite set of weekly working hours and cross trained workers. Eur J Oper Res 176:230–239
Corominas A, Lusa A, Pastor R (2004) Planning annualised hours with finite set of working hours and joint holidays. Ann Oper Res 128:217–233
Lusa A, Pastor R, Corominas A (2008) Determining the most appropriate set of weekly working hours for planning annualised working time. Int J Prod Econ 111(2):697–706
Suresh Kumar MR, Pillai VM (2009) Planning annualised hours with partially individualised holiday weeks. Int J Oper Quant Manag 15:173–188
Azmat WM (2004) A case study of single shift planning and scheduling under annualised hours; A simple three step approach Regards Sureshkumar M.R. Eur J Oper Res 1:148–175
Corominas A, Lusa A, Pastor R (2002) Using MILP to plan annualised working hours. J Oper Res Soc 53:1101–1108
Corominas A, Lusa A, Pastor R (2007) Using a MILP model to establish a frame work for an annualised hours agreement. Eur J Oper Res 177(2):1495–1506
Hung R (1999) A multiple-shift workforce scheduling model under annualised hours. Nav Res Logist 46:726–736
Hung R (1999) Scheduling a workforce under annualised hours. Int J Prod Res 37:2419–2427
Hert A, Lahrichi N, Widmer M (2010) A Flexible MILP model for multiple shift work force planning under annualised hours. Eur J Oper Res 200(3):860–873
MacMeeking J (1995) Why Tescos new composite distribution needed annual hours. Int J Retail Distrib Manag 23:36–38
Grabot B, Letouzey A (2000) Short-term manpower management in manufacturing systems: new requirements and DSS prototyping. Comput Ind 3:11–29
Sayin S, Karabati S (2007) Assigning cross trained workers to departments: a two stage optimization model to maximize utility and skill improvement. Eur J Oper Res 176:1643–1658
Campbell G-M, Diaby M (2002) Development and evaluation of an assignment heuristic for allocation cross-trained workers. Eur J Oper Res 138:9–20
Lusa A, Corominas A, Munoz N (2008) A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty. Int J Prod Econ 113:957–968
Lusa A, Corominas A, Pastor R (2006) Planning holidays and working time under annualised hours. Research Institute IOC-DT-P-2006-4. http://upcommons.upc.edu/e-prints/bitstream/2117/310/1/Amaia%202.pdf. Accessed 10-07-2010
Corominas A, Pastor R, Rodriguez E (2006) Rotational allocation of tasks to multifunctional workers in a service industry. Int J Prod Econ 103:3–9
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Sureshkumar, M.R., Pillai, V.M. An efficient method to reduce relative capacity shortage using annualised hours planning. Int J Adv Manuf Technol 65, 571–580 (2013). https://doi.org/10.1007/s00170-012-4196-y
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-012-4196-y