Abstract
This paper presents a new solution framework to locate the workstations in the tandem automated guided vehicle (AGV) systems. So far, the research has focused on minimizing the total flow or minimizing the total AGV transitions in each zone. In this paper, we focus on minimizing total cumulative flow among workstations. This objective allocates workstations to an AGV route such that total waiting time of workstations to be supplied by the AGV is minimized. We develop a property which simplifies the available mathematical formulation of the problem. We also develop a heuristic algorithm for the problem. Computational results show that our heuristic could yield very high-quality solutions and in many cases optimal solutions.
Similar content being viewed by others
References
Tompkins JA, White JA, Bozer YA, Tanchoco JMA (2003) Facilities planning, 3rd edn. Wiley, New York
Bozer YA, Srinivasan MM (1989) Tandem configurations for automated guided vehicle systems offer simplicity and flexibility. Ind Eng 21(2):23–27
Bozer YA, Srinivasan MM (1991) Tandem configurations for automated guided vehicle systems and the analysis of single-vehicle loops. IIE Trans 23(1):72–82
Bozer YA, Srinivasan MM (1992) Tandem AGV systems: a partitioning algorithm and performance comparison with conventional AGV systems. Eur J Oper Res 63(2):173–192
Gadmann AGRM, Velde SL (2000) Positioning AGV in a loop layout. Eur J Oper Res 127:565–573
Kim KS, Jae M (2003) A design for a tandem AGVS with multi-load AGVs. Int J Adv Manuf Technol 22:744–752
Hsieh LF, Sha DY (1996) A design process for AGV systems: the concurrent design of machine layout and guided vehicle routes in tandem automated guided vehicle systems. Eur J Oper Res 7(6):30–38
Ho YC, Hsieh PF (2004) A machine-to-loop assignment layout methodology for tandem AGVS with multiple-load vehicle. Int J Prod Res 42(4):801–832
Tavakkoli-Moghddam R, Aryanezahd MBG, Kazemipoor H, Salehipour A (2008) Partitioning machines in tandem AGV systems based on “balanced flow strategy” by simulated annealing. Int J Adv Manuf Technol 38:355–366
Tavakkoli-Moghddam R, Aryanezahd MBG, Kazemipoor H, Salehipour A (2008) A threshold accepting algorithm for partitioning machines in tandem automated guided vehicle. Int J Eng Sci 19(1–2):33–42
Wooyeon Yu, Egbelu PJ (2001) Design of variable path tandem layout for AGV. J Manuf Syst 20(5):305–319
Fahmy SA, Shalaby MA, Elmekkawy TY (2005) A Multi-objective partitioning algorithm for tandem AGV system, 35th International Conference on Computers and Industrial Engineering, pp 715-720
Shalaby MA, Elmekkawy TY, Fahmy SA (2005) A cost based evaluation of a zones formation algorithm in tandem AGV systems. Int J Adv Manuf Technol 31(1–2):175–187
Kaspi M, Kesselman U, Tanchoco JMA (2002) Optimal solution for the flow path design problem of a balanced unidirectional AGV system. Int J Prod Res 40:349–401
Ko KC, Egbelu PJ (2003) Unidirectional AGV guide path network design: a heuristic algorithm. Int J Prod Res 41:2325–2343
Asef-Vaziri A, Laporte G, Sriskandarajah C (2000) The block layout shortest loop design problem. IIE Trans 32:724–734
Asef-Vaziri A, Dessouky M, Sriskandarajah C (2001) A loop material flow system design for automated guided vehicles. Int J Flex Manuf Syst 13:33–48
Asef-Vaziri A, Laporte L, Ortiz R (2007) Exact and heuristic procedures for the material handling circular flow path design problem. Eur J Oper Res 176(2):707–716
Fischetti M, Laporte G, Martello S (1993) The delivery man problem and cumulative matroids. Oper Res 41(6):1064–1065
Hansen P, Mladenović N (2001) Variable neighborhood search: principles and applications. Eur J Oper Res 130(3):449–467
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Salehipour, A., Kazemipoor, H. & Moslemi Naeini, L. Locating workstations in tandem automated guided vehicle systems. Int J Adv Manuf Technol 52, 321–328 (2011). https://doi.org/10.1007/s00170-010-2727-y
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-010-2727-y