Article PDF
Author information
Authors and Affiliations
Corresponding author
Additional information
The online version of the original article can be found at http://dx.doi.org/10.1007/s00170-009-2483-z.
Rights and permissions
About this article
Cite this article
Zamani, R. Erratum to: A parallel complete anytime procedure for project scheduling under multiple resource constraints. Int J Adv Manuf Technol 50, 363 (2010). https://doi.org/10.1007/s00170-010-2542-5
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-010-2542-5