Skip to main content
Log in

Component prioritisation for strategic purchasing and the case study of a South Korean elevator manufacturer

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

The importance of aligning purchasing strategy with business strategy is argued using a substantial literature review. However, some purchases will have a greater impact on the strategic priorities of the business, and suppliers cannot be expected to achieve optimal performance in everything they do, especially at day 1. This paper presents the application of the analytic hierarchy process to prioritise the components of an electric traction elevator in the context of their importance to the business strategy of the manufacturer. This is the first step in the formulation of the manufacturer’s purchasing strategy. The relative importance of the competitive elements in the form of quality, cost, availability and time are first established for the manufacturer’s business strategy, along with the relative importance of the sub-criteria used to measure these elements. The components of the elevator are then assessed to see which have the greatest impact on these sub-criterion measures to establish component priorities and groupings to guide those forming the purchasing strategy. The paper includes a justification of the criteria and sub-criterion measures used, based on a literature review.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Krause DR, Scannell TV (2002) Supplier development practices: product and service based industry comparisons. J Supply Chain Manage 38(2):13–21 doi:10.1111/j.1745-493X.2002.tb00125.x

    Article  Google Scholar 

  2. Watts CA, Kim YK, Hahn C (1995) Linking purchasing to corporate competitive strategy. Int J Purchasing Mater Manage 31(2):2–8

    Google Scholar 

  3. van Weele AJ (2005) Purchasing and supply chain management; analysis, strategy, planning and practice. Thomson Learning, London

    Google Scholar 

  4. Hou J, Su D (2007) EJB-MVC oriented supplier selection system for mass customization. J Manuf Technol Manage 18(1):54–71 doi:10.1108/17410380710717643

    Article  Google Scholar 

  5. Krause DR, Pagell M, Curkovic S (2001) Toward a measure of competitive priorities for purchasing. J Oper Manage 19(4):497–512 doi:10.1016/S0272-6963(01)00047-X

    Article  Google Scholar 

  6. Porter ME (1986) Competition in global industries. Harvard Business School Press, Boston

    Google Scholar 

  7. Sarkis J, Talluri S (2002) A model for strategic supplier selection. J Supply Chain Manage 38(1):18–28 doi:10.1111/j.1745-493X.2002.tb00117.x

    Article  Google Scholar 

  8. Gelderman CJ, van Weele AJ (2003) Handling measurement issues and strategic directions in Kraljic’s purchasing portfolio model. J Purchasing Supply Manage 9:207–216 doi:10.1016/j.pursup.2003.07.001

    Article  Google Scholar 

  9. Zheng J, Knight L, Harland C, Humby S, James K (2007) An analysis of research into the future of purchasing and supply management. J Purchasing Supply Manage 13:69–83 doi:10.1016/j.pursup.2007.03.004

    Article  Google Scholar 

  10. Saaty TL (1980) The analytical hierarchy process. McGraw-Hill, New York

    Google Scholar 

  11. Saaty TL, Vargas LG (2001) Models, methods, concepts & applications of the analytic hierarchy process. Kluwer Academic, Boston

    Google Scholar 

  12. Flores BE, Whybark DC (1987) Implementing multiple criteria ABC analysis. J Oper Manage 7(1):79–84 doi:10.1016/0272-6963(87)90008-8

    Article  Google Scholar 

  13. Slack N, Chambers S, Johnston R (2007) Operations management, fifth edition. Prentice Hall, UK

    Google Scholar 

  14. Lu TP, Chang TM, Yih Y (2005) Production control framework for supply chain management—an application in the elevator manufacturing industry. Int J Prod Res 43(20):4219–4233 doi:10.1080/00207540500142167

    Article  Google Scholar 

  15. Kraljic P (1983) Purchasing must become supply management. Harv Bus Rev 61(5):109–117

    Google Scholar 

  16. Drake PR (1998) Using the analytic hierarchy process in engineering education. Int J Eng Educ 14(3):191–196

    Google Scholar 

  17. Chan FTS, Chan HJ (2004) Development of the supplier selection model—a case study in the advanced technology industry. J Eng Manuf 218:1807–1824

    Google Scholar 

  18. Kannan VR, Tan KC (2002) Supplier selection and assessment: their impact on business performance. J Supply Chain Manage 38(4):11–21 doi:10.1111/j.1745-493X.2002.tb00139.x

    Article  Google Scholar 

  19. Nydick RL, Hill RP (1992) Using the analytic hierarchy process to structure the supplier selection procedure. Int J Purch Mater Manage, Spring 28(2):31–36

    Google Scholar 

  20. Dulmin R, Mininno V (2003) Supplier selection using a multi-criteria decision aid method. J Purchasing Supply Manage 9:177–187 doi:10.1016/S1478-4092(03)00032-3

    Article  Google Scholar 

  21. Sha DY, Che ZH (2006) Supply chain network design: partner selection and product/distribution planning using a systematic model. J Oper Res Soc 57:52–62 doi:10.1057/palgrave.jors.2601949

    Article  MATH  Google Scholar 

  22. van de Water H, van Peet HP (2006) A decision support model based on the Analytic Hierarchy Process for the Make or Buy decision in manufacturing. J Purchasing Supply Manage 12(5):258–271 doi:10.1016/j.pursup.2007.01.003

    Article  Google Scholar 

  23. Saaty TL (2000) Fundamentals of decision making and priority theory, 2nd edn. RWS Publications, Pittsburgh

    Google Scholar 

  24. Expert Choice (2004) Expert choice 11: quick start guide and tutorials. Expert Choice, Arlington

    Google Scholar 

  25. Krajewski LJ, Ritzman LP (2005) Operations management; processes and value chains. Prentice Hall, New Jersey

    Google Scholar 

  26. Christopher M, Towill DR (2000) Supply chain migration from lean and functional to agile and customised. Supply Chain Manage An Int J 5(4):206–213 doi:10.1108/13598540010347334

    Article  Google Scholar 

  27. Tam MCY, Tummala VMR (2001) An application of the AHP in vendor selection of a telecommunication system. Omega—The International Journal of Management Science 29(2):171–182

    Article  Google Scholar 

  28. Carr AS, Smeltzer LR (1997) An empirically based operational definition of strategic purchasing. Eur J Purchasing Supply Manage 3(4):199–207 doi:10.1016/S0969-7012(97)00014-2

    Article  Google Scholar 

  29. Hayes RH, Wheelwright SC (1984) Restoring our competitive edge: competing through manufacturing. Wiley, New York

    Google Scholar 

  30. Chao CN, Scheuing EE (1994) Marketing services to professional purchasers. J Strateg Mark 2(2):155–162 doi:10.1080/09652549400000008

    Article  Google Scholar 

  31. Gonzalez-Benito J, Martinez-Lorente AR, Dale BG (2003) A study of the purchasing management system with respect to total quality management. Ind Mark Manage 32(6):443–454 doi:10.1016/S0019-8501(02)00231-6

    Article  Google Scholar 

  32. Gadde L, Snehota I (2000) Making the most of supplier relationships. Ind Mark Manage 29(4):305–316 doi:10.1016/S0019-8501(00)00109-7

    Article  Google Scholar 

  33. Dangayach G, Deshmukh S (2001) Manufacturing strategy: literature review and some issues. Int J Oper Prod Manage 21(7):884–932 doi:10.1108/01443570110393414

    Article  Google Scholar 

  34. Miltenburg J (2005) Manufacturing strategy: how to formulate and implement a winning plan. Productivity Press, New York

    Google Scholar 

  35. Slack N, Lewis M (2002) Operations strategy. Prentice Hall, UK

    Google Scholar 

  36. MacKenzie HF, Hardy KG (1996) Manage your offering or manage your relationship? J Bus Ind Mark 11(6):20–37 doi:10.1108/08858629610151280

    Article  Google Scholar 

  37. Park S, Hartley JL (2002) Exploring the effect of supplier management on performance in the Korean automotive supply chain. J Supply Chain Manage 38(2):46–52 doi:10.1111/j.1745-493X.2002.tb00129.x

    Article  Google Scholar 

  38. Shin H, Collier DA, Wilson DD (2000) Supply management orientation and supplier/buyer performance. J Oper Manage 18(3):317–333 doi:10.1016/S0272-6963(99)00031-5

    Article  Google Scholar 

  39. Burt DN (1989) Managing product quality through strategic purchasing. Sloan Manage Rev 30(3):39–48

    MathSciNet  Google Scholar 

  40. Vickery S, Calantone R, Droge C (1999) Supply chain flexibility: an empirical study. J Supply Chain Manage 35(3):16–24 doi:10.1111/j.1745-493X.1999.tb00058.x

    Article  Google Scholar 

  41. Clark KB (1989) What strategy can do for technology? Harv Bus Rev 67(6):94–98

    Google Scholar 

  42. Narasimhan R, Das A (1999) An empirical investigation of the contribution of strategic sourcing to manufacturing flexibilities and performance. Decis Sci 30(3):683–718 doi:10.1111/j.1540-5915.1999.tb00903.x

    Article  Google Scholar 

  43. Porter ME (1985) Competitive advantage: creating and sustaining superior performance. Free Press, New York

    Google Scholar 

  44. Christensen CM, Bower JL (1996) Customer power, strategic investment, and the failure of leading firms. Strateg Manage J 17(3):197–218 doi:10.1002/(SICI)1097-0266(199603)17:3<197::AID-SMJ804>3.0.CO;2-U

    Article  Google Scholar 

  45. Katsikeas CS, Paparoidamis NG, Katsikea E (2004) Supply source selection criteria: the impact of supplier performance on distributor performance. Ind Mark Manage 33(8):755–764 doi:10.1016/j.indmarman.2004.01.002

    Article  Google Scholar 

  46. Olsen RF, Ellram LM (1997) A portfolio approach to supplier relationships. Ind Mark Manage 26(2):101–113 doi:10.1016/S0019-8501(96)00089-2

    Article  Google Scholar 

  47. Lee HL, Billington C (1992) Managing supply chain inventory. Sloan Manage Rev 33(3):65–73

    Google Scholar 

  48. Ramanathan R, Ganesh LS (1994) Group preference aggregation methods employed in AHP: an evaluation and intrinsic process for deriving members’ weightages. Eur J Oper Res 79(2):249–265 doi:10.1016/0377-2217(94)90356-5

    Article  MATH  Google Scholar 

  49. Muralidharan C, Anantharaman N, Deshmukh SG (2002) A multi-criteria group decision making model for supplier rating. J Supply Chain Manage 38(4):22–33 doi:10.1111/j.1745-493X.2002.tb00140.x

    Article  Google Scholar 

  50. Nicholas JM (1998) Competitive manufacturing management: continuous improvement, lean production, customer-focused quality. McGraw-Hill, London

    Google Scholar 

  51. Hill T (2000) Manufacturing strategy: text and cases, 2nd edn. Palgrave, Bristol

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to P. R. Drake.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Drake, P.R., Lee, D.M. Component prioritisation for strategic purchasing and the case study of a South Korean elevator manufacturer. Int J Adv Manuf Technol 43, 883–895 (2009). https://doi.org/10.1007/s00170-008-1766-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-008-1766-0

Keywords

Navigation