In wafer fabrication facilities, it is critical to schedule batching operations efficiently. Most previous studies in scheduling these operations have the objective to efficiently create the batches with the given jobs at the batching operation and decide whether to start a partial batch or to wait for the next arrival to make a full batch. Typical batch operations in wafer fab can be found in the diffusion area which is mainly composed of pre-cleaning (wet etch) and furnace. Glassey and Weng (Dynamic batching heuristic for simultaneous processing. IEEE Trans Semicond Manuf 4(2), May 1991) first introduced the concept of using future arrival information and called it look-ahead. Fowler et al. (Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Trans Semicond Manuf 1992) expanded the concept to multiple products and created the heuristic method called next arrival control heuristic (NACH). NACH considers only the next arrival and makes the decision whether to start the batch now or to wait for the next arrival. The new proposed scheduling system called NACH+ tries to control the incoming inventory into the batch operation. The preliminary batches are scheduled to arrive at the batch operation just in time so that any unnecessary waiting time does not happen. In this paper, NACH+ is compared to the minimum batching size rule.
Similar content being viewed by others
References
Glassey CR, Weng WW (1991) Dynamic batching heuristic for simultaneous processing. IEEE Trans Semicond Manuf 4(2), May
Fowler JW et al. (1992) Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Trans Semicond Manuf
Monch L, Habenicht I (2003) Simulation-based assessment of batching heuristics in semiconductor manufacturing. Proc 2003 Winter Simulation Conference
Weng WW, Leachman RC (1993) An improved methodology for real-time production decision at batch-process work stations. IEEE Trans Semicond Manuf
Van Der Zee DJ (2002) Adaptive scheduling of batch servers in flow shops. Int J Prod Res 40:2811–2833
Broersma ALA, Sierksma G, Wijngaard J (2002) Decomposed vs. integrated control of a one-stage production system. Eur J Oper Res 138:569–577
Robinson JK, Fowler JW, Bard JF (1995) The use of upstream and downstream information in scheduling semiconductor batch operations. Int J Prod Res 33:1849–1869
Akcali E, Uzsoy R, Hiscock DG, Moser AL, Teyner TJ (2000) Alternative loading and dispatching policies for furnace operations in semiconductor manufacturing: a comparison by simulation. Proc 2000 Winter Simulation Conference, 2000
Balasubramanian H, Mönch L, Fowler J, Pfund M (2004) Generic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness. Int J Prod Res 42:1621–1638
Fowler JW, Phojanamongkolkij N, Cochran JK, Montgomery DC (2002) Optimal batching in a wafer fabrication facility using a multiproduct G/G/c model with batch processing. Int J Prod Res 40:275–292
Bixby R, Burda R, Miller D (2006) Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming. IEEE/SEMI Advanced Semiconductor Manufacturing Conference
Author information
Authors and Affiliations
Corresponding authors
Rights and permissions
About this article
Cite this article
Ham, M., Fowler, J.W. Scheduling of Wet Etch and Furnace Operations with Next Arrival Control Heuristic. Int J Adv Manuf Technol 38, 1006–1017 (2008). https://doi.org/10.1007/s00170-007-1146-1
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-007-1146-1