Skip to main content

Advertisement

Log in

Calculating production rate of a flexible manufacturing module

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

This paper presents a closed form equation for calculating production rate of a flexible manufacturing module (FMM) which operates under stochastic conditions, including random machining times, random part loading and unloading times, and random pallet transfer times. Random operational conditions may arise due to the randomness in the variety of parts introduced into the system. The FMM consists of two machines, one pallet handling system, and a loading/unloading robot. The model and the resulting closed form equations allow the FMM designers and operation engineers select the most appropriate parameters for the maximum production output rate.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Abdelmalek F, Savsar M, Aldaihani M (2004) Simulation of tool change policies in a flexible manufacturing cell. WSEAS Trans Syst 7(3):2546–2552

    Google Scholar 

  2. Agnetis A, Alfieri A, Nicosia G (2003) Part batching and scheduling in a flexible cell to minimize setup costs. J Sched 6(1):87–108

    Article  MATH  MathSciNet  Google Scholar 

  3. Aldaihani M, Savsar M (2005) Stochastic modeling and analysis of a two machine flexible manufacturing cell. Comput Ind Eng 49:600–610

    Article  Google Scholar 

  4. Buzacott JA, Yao DD (1986) Flexible manufacturing systems: a review of analytical models. Manage Sci 32:890–906

    Article  Google Scholar 

  5. Chan D, Bedworth DD (1990) Design of a scheduling system for flexible manufacturing cells. Int J Prod Res 28:2037–2049

    Article  Google Scholar 

  6. Cogun C, Savsar M (1996) Performance evaluation of a flexible manufacturing cell by computer simulation. Modeling Measurement & Control B 62(2):31–44

    Google Scholar 

  7. Farahmand K (2000) Using simulation to support implementation of flexible manufacturing cell. Winter Simulation Conference Proceedings, 2

  8. Henneke MJ, Choi RH (1990) Evaluation of FMS parameters on overall system parameters. Comput Ind Eng 18:105–110

    Article  Google Scholar 

  9. Hutchinson J, Leog K, Snade D, Ward P (1991) Scheduling approaches for random job shop flexible manufacturing systems. Int J Prod Res 29:1053–1067

    Article  Google Scholar 

  10. Kelton WD, Sadowski RP, Sadowski DA (2002) Simulation with ARENA, Second edn. McGraw- Hill, New York, USA

    Google Scholar 

  11. Kim S, Park J, Leachman RC (2001) A supervisory control approach for execution control of an FMC. Int J Flex Manuf Sys 13(1):5–31

    Article  Google Scholar 

  12. Koulamas CP (1992) A stochastic model for a machining cell with tool failure and tool replacement considerations. Comput Oper Res 19:717–729

    Article  MATH  Google Scholar 

  13. Lashkari RS, Balakrishnan B, Dutta SP (2002) A multi-objective model for the allocation of pallets in a flexible manufacturing cell. Int J Ind Eng 9(3):287–300

    Google Scholar 

  14. Ratmirov VA, Snaksarev AM (1986) A mathematical model of a flexible manufacturing cell. Sov Eng Res 57(6):2–3

    Google Scholar 

  15. Savsar M, Cogun C (1993) Stochastic modeling and comparisons of two flexible manufacturing cells with single and double gripper robots. Int J Prod Res 31:633–645

    Article  Google Scholar 

  16. Savsar M (2000) Reliability analysis of a flexible manufacturing cell. Reliab Eng Syst Saf 67:132–147

    Article  Google Scholar 

  17. Savsar M. Production rate of a flexible manufacturing module. The 12th International Conference on Machine Design and Production, 5–8 September, 2006, Kusadasi, Turkey

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mehmet Savsar.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Savsar, M. Calculating production rate of a flexible manufacturing module. Int J Adv Manuf Technol 37, 760–769 (2008). https://doi.org/10.1007/s00170-007-1016-x

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-007-1016-x

Keywords

Navigation