Abstract
A hybrid neural network and selective allowance approach is proposed in this study for internal due date assignment in a wafer fabrication plant (wafer fab). In the first part, a look-ahead self-organization map-fuzzy back propagation network (SOM-FBPN) is constructed to estimate the completion time of a job. Subsequently, a selective allowance policy is established to determine the allowance that will be added to the estimated job completion time. Compared with traditional approaches, the look-ahead SOM-FBPN has many features (including incorporating the future release plan, classifying jobs, and incorporating expert opinions), and the selective allowance policy is novel by considering two different production control issues to avoid missing the due date. According to experimental results, the prediction accuracy of the look-ahead SOM-FBPN was significantly better than those of many existing approaches. Besides, the selective allowance policy considerably improved the due date related performance after adding some extra allowance.
Similar content being viewed by others
References
Barman S (1998) The impact of priority rule combinations on lateness and tardiness. IIE Transactions 30:495–504
Chandiramani V, Jayaseelan R, Nathan VSL, Priya KS (2004) A neural network approach to process assignment in multiprocessor systems based on the execution time. Proceedings of International Conference on Intelligent Sensing and Information Processing (ICISIP 2004), Chennai, India:332–335
Chang P-C, Chen LY (2006) A hybrid regulation system by evolving CBR with GA for a twin laser measuring system. International Journal of Advanced Manufacturing Technology, DOI 10.1007/s00170-005-0286-4
Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55–61
Chang P-C, Hsieh J-C, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, British Columbia, Canada
Chang P-C, Hsieh J-C, Liao TW (2005) Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. J Intell Manuf 16:549–557
Chang P-C, Liao TW (2006) Combining SOM and fuzzy rule base for flow time prediction in semiconductor manufacturing factory. Appl Soft Comput 6:198–206
Chang P-C, Liu CH, Wang YW (2006) A hybrid model by clustering and evolving fuzzy rules for sale forecasting in printed circuit board industry. Decision Support Systems DOI 10.1016/j.dss.2006.02.014
Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. Appl Soft Comput 2/3F:211–222
Chen T (2006) A hybrid look-ahead SOM-FBPN and FIR system for wafer lot output time prediction and achievability evaluation. Int J Adv Manuf Technol (in press)
Chen T (2006) A hybrid SOM-BPN approach to lot output time prediction in a wafer fab. Neural Processing Letters DOI 10.1007/s11063-006-9027-4
Chen T (2006) A look-ahead fuzzy back propagation network for lot output time series prediction in a wafer fab. Lect Notes in Comput Sci 4234:974–982
Chen T (2006) An intelligent hybrid system for wafer lot output time prediction. Adv Eng Infor (in press)
Gordon V, Proth J-M, Chu C (2002) A survey of the state-of-the-art of common due date assignment and scheduling research. Eur J Oper Res 139:1–25
Hsu SY, Sha DY (2004) Due date assignment in wafer fabrication using artificial neural network. Int J Adv Manuf Technol 23(9–10):768–775
Hung Y-F, Chang C-B (2001) Dispatching rules using flow time predictions for semiconductor wafer fabrications. Proceedings of the 5th Annual International Conference on Industrial Engineering Theory, Applications and Practice, Taiwan
Ishibuchi H, Nozaki K, Tanaka H (1992) Distributed representation of fuzzy rules and its application to pattern classification. Fuzzy Sets Sys 52(1):21–32
Jiang Y, Zhou ZH (2004) SOM ensemble-based image segmentation. Neural Process Let 20:171–178
Lin C-Y (1996) Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction. Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley
Little JDC (1961) A proof of the queueing formula L = ë W. Oper Res 9:383–387
Tiwari MK, Roy D (2002) Minimization of internal shrinkage in casting using synthesis of neural network. Int J Smart Eng Syst Des 4:205–214
Vig MM, Dooley KJ (1991) Dynamic rules for due-date assignment. Int J Prod Res 29(7):1361–1377
Wang L-X, Mendel JM (1992) Generating fuzzy rules by learning from examples. IEEE Trans Syst, Man, Cybern 22(6):1414–1427
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Chen, T., Jeang, A. & Wang, YC. A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant. Int J Adv Manuf Technol 36, 570–581 (2008). https://doi.org/10.1007/s00170-006-0869-8
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-006-0869-8