Skip to main content
Log in

Sequential monitoring of manufacturing processes: an application of grey forecasting models

  • Original Article
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

This study used statistical control charts as an efficient tool for improving and monitoring the quality of manufacturing processes. Under the normality assumption, when a process variable is within control limits, the process is treated as being in-control. Sometimes, the process acts as an in-control process for short periods; however, once the data show that the production process is out-of-control, a lot of defective products will have already been produced, especially when the process exhibits an apparent normal trend behavior or if the change is only slight. In this paper, we explore the application of grey forecasting models for predicting and monitoring production processes. The performance of control charts based on grey predictors for detecting process changes is investigated. The average run length (ARL) is used to measure the effectiveness when a mean shift exists. When a mean shift occurs, the grey predictors are found to be superior to the sample mean, especially if the number of subgroups used to compute the grey predictors is small. The grey predictor is also found to be very sensitive to the number of subgroups.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Quesenberry CP (1988) An SPC approach to compensating a tool-wear process. J Qual Technol 20(4):220–229

    Google Scholar 

  2. Cai DQ, Xie M, Goh TN, Tang XY (2002) Economic design of control chart for trended processes. Int J Prod Econ 79:85–92

    Article  Google Scholar 

  3. Deng JL (1982) Control problems of grey systems. Syst Control Lett 11(5):288–294

    Google Scholar 

  4. Liang RH (1999) Application of grey relation analysis to hydroelectric generation. Sched Electr Power Energy Syst 21:357–364

    Google Scholar 

  5. Wang YF (2002) Predicting stock price using fuzzy grey prediction system. Expert Syst Appl 22:33–39

    MATH  Google Scholar 

  6. Lin CT, Chen LH (1999) A grey analysis of bank re-decreasing the required reserve ratio. J Grey Syst 11:119–132

    Google Scholar 

  7. Deng JL (2000) The theory and application for grey system. Chuan Wa, Taipei

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Li-Lin Ku.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Ku, LL., Huang, TC. Sequential monitoring of manufacturing processes: an application of grey forecasting models. Int J Adv Manuf Technol 27, 543–546 (2006). https://doi.org/10.1007/s00170-004-2198-0

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-004-2198-0

Keywords

Navigation