Skip to main content
Log in

Integrated set-up and fixture planning system for gearbox casings

  • Original Article
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

Briefly reviewed in this paper is the development of an expert system for the fixture set-up and for gearbox casings to be machined on machining centres. The set-up and fixture planning involves the definitions of operation sequence, workpiece orientation, locating type, locating surfaces, clamping type, and clamping surfaces. In this paper, the development of the system and a more detailed description of the locating solution is presented.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Ma W, Rong Y (1999) Development of automated fixture planning systems. Int J Adv Manuf Technol 15:171–181

    Article  Google Scholar 

  2. Cecil J (2001) A clamping design approach for automated fixture design. Int J Adv Manuf Technol 18:784–789

    Article  Google Scholar 

  3. Kayacan MC, Celik SA (2003) Process planning system for prismatic parts. Integr Manuf Syst 14(2):75–86

    Article  Google Scholar 

  4. Kaya N, Öztürk F (2003) The application of chip removal and frictional contact analysis for workpiece-fixture layout verification. Int J Adv Manuf Technol 21:411–419

    Article  Google Scholar 

  5. Estrems M, Sánchez HT, Faura F (2003) Influence of fixtures on dimensional accuracy in machining processes. Int J Adv Manuf Technol 21:384–390

    Article  Google Scholar 

  6. Thyer GE (1996) Computer numerical control of machine tools. Butterworth-Heinemann, Oxford

  7. Stampfer M, Hodolic J (1998) Reduction of technological operations to particular cuts within a process-planning expert system for gearbox casings. Proceedings of the IEEE International Conference on Intelligent Engineering Systems (INES ’98), Vienna, Austria, pp 385–390

  8. Nee JG (1998) Fundamentals of tool design. SME, Dearborn, MI

  9. Ewersheim W, Neitzel R (1988) Ein expertensytem für die vorrichtungskonstruktion. Konstruktion 40:97101

    Google Scholar 

  10. Kettner H (1986) Maßbestimmung von aufnahmebolzen in vorrichtungen. Z Ind Fertigung 76:563–565

    Google Scholar 

  11. Milacic VR (1985) SAPT-Expert system for manufacturing process planning, Proceedings of the Winter Annual Meeting of the ASME, Florida, 1985

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. Stampfer.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Stampfer, M. Integrated set-up and fixture planning system for gearbox casings. Int J Adv Manuf Technol 26, 310–318 (2005). https://doi.org/10.1007/s00170-003-1997-z

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-003-1997-z

Keywords

Navigation