Abstract
In recent years, Horizontal Directional Drilling has been the first choice in non-excavation project. To reduce the resistance force and avoid damage of pipeline in construction, the angle formed by the axis of pipeline and axis of hole need to be lessened by lifting the pipeline to a certain height. However, there is not any mathematical method for engineer to choose the best lifting position and lifting height rapidly. In this paper, a mathematical model is established to find out the optimal lifting height and lifting position parameters. In the end, according to the actual parameters, which came from Jiangdu–Rudong gas pipeline engineering project, the best combination, including the distance between the first lifting machine and the front end of the pipe which is a = 15 and the hanging point spacing which is b = 16, is found for the pipeline to be installed safely.
Similar content being viewed by others
References
An JL (2004) Technology research of oil and gas pipeline through the drilling of horizontal directional. Huazhong University of Science and Technology
Ariaratnam ST, Lueke JS (2002) Post construction evaluation of the annular space region in horizontal directional drilling. Proc NASTT No-Dig2002 Conf, Montreal, Quebec. North American Society for Trenchless Technology, Arlington, VA.
Chehabl AG, Moore ID (2012) M. ASCE2, analysis for long-term response of pipes installed using horizontal directional drilling, journal of Geotechnical & Geo-environmental engineering. ASCE/APRIL 432e440
Chui DM (2011) Horizontal directional drilling reamer design method and new product design. Chengdu University of Technology, Chengdu
Conroy PJ, Latorre CA, Wakeley LD (2002) Installation of fiber-optic cables under flood-protection structures using horizontal directional drilling techniques. Geotechnical and Structures Laboratory, US Army Corps of Engineers
Deng DM, Wang CX (1999) Strength calculation of buried single span pipe at both ends of the fixed pier [J]. Oil-Gas Field Surf Eng 18(1):53–56.58
Feng WZ (1998) Steering drilling system in the application of polyethylene pipe laying [J]. Gas Heat (6):26–28
Gan H (2000) Numerical analysis of large deflection of beam [J]. Appl Math Mech 21(6):633–639
He CG (2012) The exploration of reactive power compensation technique for 10 kV distribution line. Friend Sci Amat 11:31–32
Jiang W (2009) Research on tracking guide instrument system of horizontal directional drilling. Southeast University
Latorre CA, Wakeley LD, Conroy PJ (2002) Guidelines for installation of utilities beneath corps of engineers levees using horizontal directional drilling. Geotechnical and Structures Laboratory, US Army Corps of Engineers
Liu HL (2009). Research on the technology of horizontal directional drilling of oil and gas pipeline crossing large and medium-sized river. China University of Geosciences
Liu B, Chen L (2012) The construction methods and technical measures across the Karun River directional drilling. China Petroleum Chem. Stand. Qual. 7
Liu XQ, Han ZW, Zhang L (1999) Introduction of PE pipe jacking technology [J]. Gas Heat 6:30–31
Liu X, Ai ZJ, Qi JC (2016) Mechanics analysis of pipe lifting in horizontal directional drilling[J]. J Nat Gas Sci Eng 31:272–282
Popelar PH, Kuhlman CJ, Mamoun MM (1997) Guidelines for installing PE pipe using HDD technique pipe [J]. Pipeline Gas Indust (12):43–49
Wang WW, Rong H, Zou MZ (2000) Trenchless techniques to lay polyethylene pipe[J]. Gas Heat (2):112–113
Xi QM (1998) Application of pipe-pushing process in underground gas pipe construction [J]. Gas Heat 6:28–29
Xu YD, Wang ZH, Zhang F (2001) Feasibility comparison of construction design schemes for laying nature gas pipes across Gaoqiaogang river [J]. Shanghai Gas (1):22–23
Yan CW, Stein D (1999) Trenchless technology construction of underground pipeline and its application [M]. Seismological Press, Beijing
Yang X (2001) Techno-economic analysis of the internal and external coatings of long-distance gas transmission pipe line in “west-to-east natural gas transmission” project[J]. Nat Gas Ind 21(2):89–93
Ye JL, Jang GS, Dou B (2000) Trenchless underground pipeline construction technology and practice [M]. China University of Geosciences press, Beijing
Yi LQ, Ding KQ, Qian CF (2011) Research on deformation calculation method of long distance pipeline based on strain [J]. Chinese journal of solid mechanics,10
Yu JJ (1993) Application of horizontal drilling rig in the construction of gas [J]. Gas Heat 4:20–22
Acknowledgments
The authors gratefully acknowledge financial support from China Petroleum and Natural Gas Group Co., Ltd., “Twelfth Five Year” scientific and technological projects (2011B-3303) and the Post-Graduate Innovation Fund of Southwest Petroleum University (CX2014BY01).
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Liu, X., Ai, Z., Fu, H. et al. Optimal parameters selection of pipe lifting project in horizontal directional drilling. Struct Multidisc Optim 55, 1251–1259 (2017). https://doi.org/10.1007/s00158-016-1566-3
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00158-016-1566-3