Skip to main content
Log in

Predicting gravity separation gold recoveries

  • Published:
Mining, Metallurgy & Exploration Aims and scope Submit manuscript

Abstract

A novel methodology for estimating gold recoveries in gravity-separation circuits is presented. The methodology makes use of a population-balance model. The model represents gold liberation, breakage and classification behavior and applies preconcentration and recovery-performance curves to gravity-recoverable gold. The derivation of the necessary parameters is explained and demonstrated using data from an actual gravity circuit and from a projected application.

The methodology makes it possible to estimate the performance of a gravity circuit having a large gold circulating load and a relatively-low unit recovery (e.g., a jig) or having a high recovery on a bleed of the circulating load (e.g., a Knelson Concentrator).

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Agar, G.E., 1993, “Assessment of gravity recoverable gold,” Proc. 25th Annual Meeting of Canadian Mineral Processors, Ottawa, ON, Canada, Paper #13, Jan.

  • Austin, L.G., Luckie, P.T., and Klimpel, R.R., 1984, Process Engineering of Size Reduction: Ball Milling, SME, Littleton, CO.

    Google Scholar 

  • Banisi, S., Laplante, A.R., and Marois, J., 1991, “The behaviour of gold in Hemlo Mines Ltd. Grinding circuit,” CIM Bulletin, Vol. 84, No. 955. pp. 72–78.

    Google Scholar 

  • Goodman, F.K., and McCreery, J.H., 1980. Coal “Preparation Plant Computer Model”, Program Documentation, Battelle Laboratories, Report EPA-600/7-80-010b, Vols. 1,2, Jan.

  • Gottfried, B.S., and Abara, J., 1979, “Maximization of yield of clean coal from coal preparation plants,” Industrial Engineering Chemistry, Process Design Development, Vol. 18, No. 3, pp. 511.

    Article  Google Scholar 

  • Gottfried, B.S., 1978, Computer Simulation of Coal Preparation, Final Report, USBM Grant No. GO-155030.

  • Karra, V.K., 1979, “Development of a model for predicting the performance of a vibrating screen,” CIM Bulletin, Vol. 72, No. 804, pp. 167.

    Google Scholar 

  • Laplante, A.R., and Noaparast, M., 1994, “A procedure for the estimation of the breakage function of gravity-recoverable gold,” in preparation.

  • Laplante, A.R., and Shu, Y., 1991, “The use of a laboratory centrifugal separator to study gravity recovery in industrial circuits,” Proceedings of the 24th Annual Meeting of Canadian Minerals Processors, Ottawa, Jan., Paper 12, 18 pp.

  • Laplante, A.R., 1993, “A methodology for the laboratory (7.5 cm) Knelson Concentrator,” Presented at the Professional Development Seminar on Gold Recovery by Gravity, McGill University, May.

  • Laplante, A.R., 1993, “Predicting gold recovery by gravity,” Gravity Concentration Workshop, org. by Brenda Process Technology and McGill University, Kelowna, July.

    Google Scholar 

  • Laplante, A.R., et al., 1994, “Practical considerations in the operations of gold gravity circuits,” Proceedings of the 26th Annual Meeting of Canadian Minerals Processors, Ottawa, ON, Canada.

  • Laplante, A.R., Finch, J.A., and del Villar, R., 1987, “Simplification of the grinding equation for plant simulation,” Transactions Institute Mining Metallurgy, London, Section C., June, Vol 96, pp. C108–112.

    Google Scholar 

  • Laplante, A.R., Liu, L., and Cauchon, A., 1990, “Gold gravity recovery at the mill of Les Mines Camchib Inc., Chibougamau, Québec,” Proceedings of the 22nd Meeting of Canadian Mineral Processors, Ottawa, ON, Canada, Jan., pp. 397–413.

  • Laplante, A.R., Putz, A., and Huang, L., 1993, “Sampling and sample processing for gold gravity circuits,” Presented at the Professional Development Seminar on Gold Recovery by Gravity, McGill University, May.

  • Mular, A.L., and Bhappu, R.B., 1978, “Digital simulation: An aid for mineral processing plant design,” Mineral Processing Plant Design, Ch. 14, AIME, New York, NY.

    Google Scholar 

  • Ounpuu, M., 1992, “Gravity concentration of gold from base metal flotation mills,” Proceedings of the 24th Meeting of Canadian Mineral Processors, Ottawa, ON, Canada, Jan., Paper 10, 10 pp.

  • Plitt, L.R., and Flintoff, B.C., 1985, The SPOC Manual, Chapter 5.1 Unit Models (Part B) Unit Models and FORTRAN Simulators of Ore and Coal Process Equipment: Classification and Coal Processing, D. Laguitton, ed., SP85-1/5.1E, Ottawa, ON, Canada.

  • Plitt, L.R., 1976, “A mathematical model of the hydrocyclone classifier,” CIM Bulletin, Vol. 69, No. 776, Dec., pp. 114–123.

    Google Scholar 

  • Walter, G.W., and Whiten, W.J., 1977, “An examination of tertiary screening using simulation,” Proceedings of the Australian IMM, Vol. 261, pp. 13, March.

    Google Scholar 

  • Whiten, W.J., 1972, “The simulation of crushing plants with models developed using multiple spline regressions,” Journal of the South African Institute of Mining and Metallurgy, May, pp. 257.

  • Woodcock, F., and Laplante, A.R., 1993, “A laboratory method to free gold content,” Randol Gold Seminar, Beaver Creek, Sept.

Download references

Author information

Authors and Affiliations

Authors

Additional information

SME Preprint 94–158, SME Annual Meeting, Feb. 14–17, 1994, Albuquerque, NM.

M&MP Paper 94–630. Discussion of this peer-reviewed and approved paper is invited and must be submitted, in duplicate, prior to August 31, 1995.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Laplante, A.R., Woodcock, F. & Noaparast, M. Predicting gravity separation gold recoveries. Mining, Metallurgy & Exploration 12, 74–79 (1995). https://doi.org/10.1007/BF03403081

Download citation

  • Received:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF03403081

Navigation